I can't see the numbers clearly The solution is so simple by you Please improve the video quality
@debayanhalder78585 күн бұрын
You just write answers and dictate it why don't you explain it Universe mentioned why self weight of slab is multiplied with 0.165 into 25 and you never mentioned why the maximum shear force at SP is multiplied with 0.165 into 25 from where maximum shear force at the support formula came don't dictate we also have answers please explain
@debankasarkar487010 күн бұрын
Design the one-way continuous slab of the figure subjected to uniformly distributed imposed loads of 5 kN/m2 . The span dimensions shown in the figure are effective spans. The width of beams at the support = 300 mm.
@viratians18.3610 күн бұрын
Calculating this in calculator (43.75x4.375) = 191.40625 how it 140.70 kn ?
@Fahadtalkz12 күн бұрын
Very bad explanation u didn't show any graph how to choose value so disappointed
@cute_aradhyaop133912 күн бұрын
How to find v value??
@kalaiarasan92213 күн бұрын
A group of 16 piles of 50cm diameter is arranged with a center to center spacing of 1.0m. The piles are 9m long and are embedded in soft clay with cohesion 30kN/m. Bearing resistance may be neglected for the piles. Adhesion factor is 0.6. Determine the ultimate load capacity of the pile group.
@vikramsinghdawar525912 күн бұрын
Eska ans to mujhe bhi nahi mil rha hai bhai
@asmabanusaniyashaik687916 күн бұрын
H.?.
@kittusharma561019 күн бұрын
Please tell how to make estimate of this underground water tank and steel
@sonalchavarkar951820 күн бұрын
Sir, kindly share points notes of procedure which is asked in engineering exam
@clema3official21 күн бұрын
❤❤❤
@sonalchavarkar951822 күн бұрын
Sir, please provide stepwise procedure.
@Shahidkhanafridi76825 күн бұрын
for 100 sq. m cement concrete(1:2:4) 4cm thick floor, the quantity of cement required is? ANSWER= 0.571 m³
@Shahidkhanafridi76825 күн бұрын
the box cutting in road crust is 2000cm3.
@ModiniChandu27 күн бұрын
Formula wrong Simpsons rule
@prajyotdeshpande6602Ай бұрын
How can longest path determine minimum amount of time required by project
@f2pclash777Ай бұрын
Bhai tu clg ke teacher jaise hi explain Kiya time waste mv
@gineusengineerАй бұрын
Q6 is also wrong option a will be correct
@gineusengineerАй бұрын
Answer galat kqn batate hain
@surajvishwakarma5326Ай бұрын
Sir is tarah ke or question kar ba yo na
@SharathBRPaapuАй бұрын
Sir how to Split volume formula?
@DhirendraBhujel-b5bАй бұрын
Thsnks so much sir
@DhirendraBhujel-b5bАй бұрын
What is dummy activity
@CivilEngineeringExamАй бұрын
imaginary activity for close the network
@francisonderi-l4iАй бұрын
I thought the base slab should be designed for uplifting pressure since it is an underground tank.
@sushantpawar437Ай бұрын
What we do to convert in cm/yr
@sushantpawar437Ай бұрын
The e value is negative
@ismaelsefanya8538Ай бұрын
Sn is wromg according to my table
@EswarAravaАй бұрын
Nenu comment chesinadaneeki answer chepakapothe me not a subcpibi
@EswarAravaАй бұрын
Calculate the bending moment at all salient point along the beam number of spans 4 4 clear distance between support 4000 mm effective depth of 350 mm gross depth 400 mm width of the beam 230 mm width of the support to 230 mm imposed lord not picture 8 km by m imposed load 12 km by m excluding self weight partical fixinty may be expected at the discontinuous edge design the beam for maximum bending moment also.USE m20 grade concrete and fe 415 grade steel Please explain this problem in diploma 4th sem in ddrcs
@purushottamdasmahant2698Ай бұрын
Can you mention page number in comment and pin code 456:2000
@nspheadshot9419Ай бұрын
IS 456:2000pg.no: 81,82,93,73
@EswarAravaАй бұрын
Please explain the ddrcs code books
@asimalharbi7907Ай бұрын
Hello, I want to contact you. What is the method?
@dhananjoyroy375Ай бұрын
Why Mu is taken in working stress method??. Your design is for base slab or top slab ??. misleading conception.
@raulikumari5813Ай бұрын
Resection & orientation
@MuruganL-ds8rmАй бұрын
10+6 + 27.25" =18.25 17' ????
@bhavnanigam67382 ай бұрын
Can u name the type of rubbish and garbage wastes
@Itspriyanshuthakur092 ай бұрын
Jb english communication nahi ata to Hind main he samjha deta
@mega_1511_2 ай бұрын
👀👀👀👀
@Rahelukumarakalva2 ай бұрын
Bro Explain in English
@kapishmishra77152 ай бұрын
for concept it is cool. but the critical path is 1-3-4-5-6 is correct but time is 19.83 days .some addition mistakes i found out . Thank you for concept sir