Railway Station Alfa
1:36
Ай бұрын
Vilnius - Riga Train
8:20
5 ай бұрын
Austrumu maģistrāle is ready
6:49
Bērnu slimnīca train station
3:03
Ezerjugla Development - Review
10:53
Daudersalas pārvads
2:31
Жыл бұрын
Austrumu maģistrāle (Update II)
1:18
Rail Baltica in Riga Airport
0:49
Pļavnieki to IKEA
6:12
Жыл бұрын
Warsaw Trip. Some Reflections.
11:51
Пікірлер
@Crimson19977
@Crimson19977 Күн бұрын
I’m definitely hyped for this project to be completed, I finally want my country Latvia to be connected to Western Europe
@JohnPeter1940
@JohnPeter1940 4 күн бұрын
Dumpster of a town 🤢🤮🤧
@thevoid5503
@thevoid5503 6 күн бұрын
This is one of the EU's flagship projects. What are those guys in their ivory towers doing ?
@itz_marcus0819
@itz_marcus0819 9 күн бұрын
And now the money ran out
@user-gk8gg1zt7l
@user-gk8gg1zt7l 9 күн бұрын
...Good video, like...
@davidczar2978
@davidczar2978 21 күн бұрын
I presume once the rail baltica 1435mm line is completed, old soviet tracks will be ripped out, i guess this would free extra land for other stuff but also expansion of 1435mm network. Croatia is also building high speed line from Rijeka to Zagreb, initially limited to 160kmph but enabled for high speed 250kmph service. Like Rail Baltica it is also being delayed due to finances. The 270km line which starts in port of Rijeka and will go via Zagreb - Koprivnica to Hungarian border. The line will cost around €4.2 billion, 85% financed by the EU, the line should be completed by 2030, section between Zagreb and Hungarian border some 100km should be completed by end of 2025, section between Zagreb - Karlovac on the southern section of the route work have started but they're not set to be finished before end of 2027, 56km section is relatively easy section, as it is flat part of the line. Section between Karlovac and Rijeka, 120km section will be very difficult, the plan is to build 22km tunnel, that will connect Rijeka to a locality known as Dreznica, there are 3 tunnels on this route, 22km 14km and 9km all very complex and will take long time to finish. Section between Dreznica to Karlovac will go through very hilly terrain and will also require noumber of tunnels, viaducts and bridges,. Karlovac -- Rijeka section will cost initially around €3.6 billion, with completion data given as 2030, but very likely it'll be 2032. Once complete, the line will allow for high speed train service between Rijeka and Zagreb and onward to Hungary, but service will be limited to 160kmph speeds as higher speeds aren't financially justified at this stage, later on the speeds will go up to max 250kmph once market matures and there's a demand for a high speed service. Croatia in 2023 had only 24 million passengers, across entire network, in 1990, that figure was 57 million, so less than half of what it used be. Hope is by 2035, we could reach 1990 figures in terms of passenger traffic.
@kokiklv
@kokiklv 22 күн бұрын
Jamiks?
@MarcinPetruszka
@MarcinPetruszka 23 күн бұрын
I just can't wait for all those rail projects to be completed. I live in Lodz, Poland, 5 minutes walking from a train station that was an end station right in the city centre since it had been built when Poland was partitioned. If all goes well, trains will finally be able to go through it, the whole network will be updated. I'm looking forward to getting on a train and going all the way to Finland through all the Baltic States one day ❤
@TakAndrzejPolak
@TakAndrzejPolak 27 күн бұрын
The concrete structure of the railway overpass should be "masked" by trees along the entire urban length. For the view to be like 3:27 Of course, the distance between the trees and the flyover should be equal to the target height of the trees.
@osasunaitor
@osasunaitor Ай бұрын
Good to see that progress is being made, but still a lot of work to go with the line itself. When this project is finished they will revolutionise transport in the Baltics. By the way it's amazing to see that the construction is respected by local people. In my country all those new walls and structures would be already vandalised with graffiti and sh*t.
@maksim12233
@maksim12233 24 күн бұрын
what is your country??
@osasunaitor
@osasunaitor 24 күн бұрын
@@maksim12233 spain
@imantsjansons5009
@imantsjansons5009 Ай бұрын
It was a great recklessness from the European Commission to give money for expensive station reconstructions while not a single kilometer of the main track has been built.
@osasunaitor
@osasunaitor Ай бұрын
True, but the riga station needs an update anyway. The platforms area is very old and outdated
@legouniverse8976
@legouniverse8976 Ай бұрын
It has, just not in Latvia
@imantsjansons5009
@imantsjansons5009 29 күн бұрын
@@legouniverse8976 People don't understand that Rail Baltica has a military dimension too. So, in case of Russian aggression, we will not have an important logistical option, but instead the fine tuned station.
@drerri
@drerri 28 күн бұрын
it is the cheapest big infrastructure project of the EU, EVER. just 8 billion, thats peanuts for eu
@igorsmedvedevs1763
@igorsmedvedevs1763 Ай бұрын
Utaino midzenis- čemodāns ir ? Stacijaj arī jābut. Ko gaidam vate ?
@MrSovetsky
@MrSovetsky Ай бұрын
Thank you for the update. I commute through the central station almost every day, but don't have the time to walk about and check it out.
@mrbrown9456
@mrbrown9456 Ай бұрын
We have shorter couplings. 🇪🇪
@asis_thoughts4399
@asis_thoughts4399 Ай бұрын
Yes, I believe we have 2x the passenger flow in passenger km and also quite bigger number in total number of trips, compared to Estonia. Not sure if I am a fan of so many seats crammed into the train, but these trains will be packed going to the beaches this summer
@MrSovetsky
@MrSovetsky Ай бұрын
I wander if ever they will get to Jugla, where alot of visually impaired people live. It's a mess.
@radikusmanov7574
@radikusmanov7574 2 ай бұрын
Одобряю: старички пониже и поближе к выходу. А молодёжь подальше и повыше. Мест вроде на всех хватает.
@kristinepriedite6189
@kristinepriedite6189 2 ай бұрын
I dont like 2 level😱.and 3+3?and bike?????no no no no💔🥺.old train its better!!!!
@eyyyyyyyyyyy
@eyyyyyyyyyyy 2 ай бұрын
6:00 lol
@janiskalnins5742
@janiskalnins5742 4 ай бұрын
This magic moment when old trains made in Latvia in soviet time is bether then new brand Skoda
@eduards5702
@eduards5702 4 ай бұрын
the author is lying, this train is very unpleasant to travel. it is very noisy, everything is buzzing and noisy everywhere, the doors squeak loudly, the carriages shake and the noise from the wheels is like in an old train. This is not a regio panter, but a cheaper copy of it.
@HaloFTW117
@HaloFTW117 4 ай бұрын
Nope. It’s way more pleasant and aesthetically beautiful than that Soviet shit we’ve had for way too long.
@eduards5702
@eduards5702 4 ай бұрын
people stood at stops for hours because no one told them that the new train had broken down. out of 11, 5 broke, and the minister said that this was normal.
@eduards5702
@eduards5702 4 ай бұрын
They haven’t even started working yet and are already breaking down. As they write in the news, Skoda did not expect them to break.
@user-px2mp9wg1x
@user-px2mp9wg1x 4 ай бұрын
Так это рельсобус,на электричку даже не тянет.И это достижерия за 30 лет независимости?
@eduards5702
@eduards5702 3 ай бұрын
а кто тебе проволоку для электрички тянуть будет? давно уже на металл сдали. Не говоря уде про рельсы с колёсами. Тут население уже в рабство продают.
@user-px2mp9wg1x
@user-px2mp9wg1x 3 ай бұрын
@@eduards5702 а мне то проволка на куй не сдалась,у нас такие на пригород ходят.
@Ahuntsicspotter
@Ahuntsicspotter 4 ай бұрын
There is a Skoda trains 🚆 in Ukraine 🇺🇦.
@templar1694
@templar1694 5 ай бұрын
Europe should keep investing into low-cost rail services. It should heavily tax low-cost carrier airlines.
@davorlekenik9563
@davorlekenik9563 5 ай бұрын
Croatian made ?? So awesome !!!
@grodnoregion4660
@grodnoregion4660 5 ай бұрын
время в пути 4 часа 23 минуты ну и нахуй при таком корыто сиденьи ехать.
@ikilius
@ikilius 4 ай бұрын
ну конечно! потому что в плацкарте говёном всегда лучше
@rauno84180
@rauno84180 5 ай бұрын
Cesis is one of the most beautiful towns in Latvia - historic centre and surroundings with amazing landscape surrounding the town. Worth a visit in every season but especially nice in summer and autumn
@DS.J
@DS.J 5 ай бұрын
Good train review. I also don't get why the LED and other digital stuff doesn't work on the train. It seems they haven't bothered to fix it.
@channelqyuu
@channelqyuu 5 ай бұрын
Good nice 👍👍👍
@u1zha
@u1zha 5 ай бұрын
Kāpēc uzbraukšana uz Piedrujas ielu caur apli? Īstā nobrauktuve bija ciet?
@asis_thoughts4399
@asis_thoughts4399 5 ай бұрын
nē es vnk nezināju baigi kā tur jābrauc un waze pirmajā dienā nerādīja to ceļu, tāpēc domāju vai tur tiešām ir vaļā vai kkas ciet, bet viss tur normāli
@MarisMileika-bo8mh
@MarisMileika-bo8mh 5 ай бұрын
Dēļ tādiem idiotiem kā tu uz dienvidu tilta un slāvu apļa veidojas sastrēgumi. Ja tu brauc pa dienvidu tiltu no Daugavas puses un vēlies nogriezties uz Piedrujas ielu, tad izmanto nobrauktuvi, kura tam ir paredzēta un nebrauc slāvu aplī.
@frederikerens234
@frederikerens234 5 ай бұрын
I have difficulties to understand why such an important ringroad has been partially desiged as two lane instead of all four lane.
@lkrnpk
@lkrnpk 5 ай бұрын
I guess something to do with not wanting to tear down some houses and deal with NIMBYs or also want to be cheap
@bolstein5636
@bolstein5636 5 ай бұрын
Cost saving
@HaloFTW117
@HaloFTW117 4 ай бұрын
Because one of the land lords refused to sell, even though the municipality was offering to buy out the necessary portion. Typical selfish asshole blocking the development of the city’s infrastructure
@worsttaste.3464
@worsttaste.3464 5 ай бұрын
I don't think the diesel trains will ever be replaced. It is more likely that they will electrify the rail system in whole country and only electric trains will run.
@lkrnpk
@lkrnpk 5 ай бұрын
Current plan is to replace diesel a with partial electrification+ battery trains. Electrification of Krustpils will be coming, so then with good enough technology we could run Rēzekne/Daugavpils with some charging island in between. Probably in direction of Valga there should be electrification to Sigulda maybe. But have to see what battery trains allow in future. i doubt all network will be electrified as it would be massive investment, but with the green deal and such who knows
@thespacementv1506
@thespacementv1506 5 ай бұрын
​@@lkrnpk In the direction of Valga will be RailBaltic.
@lkrnpk
@lkrnpk 5 ай бұрын
no, it is in direction of Parnu@@thespacementv1506
@intervrt
@intervrt 5 ай бұрын
@@thespacementv1506 RB won't go near Valga
@eduards5702
@eduards5702 5 ай бұрын
5:04 Is a button on a faucet hygienic? Was it difficult to install a proximity switch? 5:17 Some kind of cheap homemade frame, just don’t tell me it was made at the factory. 5:25 some kind of plate above the handle and this scary TV box 5:45 Still praying on the same level of the floor of the train and the platform? 5:55 Nice moment when conductor goes out to check for possible closing doors when doors are closing automatically... Why does she going out and then... waits for opening doors? Weird thing! 6:20 It is a strange that the brand "vivi" can be more friendly for people than "passenger train". This name can tell about anything, not only about trains. 6:46 You can’t hope, given the past experience of many years of scams, including with Skoda, where they “saved” about half, most likely this will all end. Moreover, doctors will soon go on strike. 7:58 As you can see, the gray and black colors are the main theme of the vivi. And a little bit of orange... 8:00 Hole latvian? 9:04 this whistle is clearly audible inside, so you will listen to every acceleration and braking, as well as the rumble of the wheels. 21 century. 9:20 Skoda promised 32 trains this year, delivered 18, and only three were put on the line. nothing bothers you?
@lkrnpk
@lkrnpk 5 ай бұрын
Level boarding in Riga central station will come with Rail Baltica, if they finish the first part of the station at least. If the station itself is delayed maybe then they will do something, but so far it does not seem they gave any plan. As per button for water, we have those on many trains all around the world, also trains are not soundproof, there will still be sounds. As per Skoda delivering 20 (20 trains are in Latvia now) instead of 32, they had to basically assemble them here due to war and not being able to use Ukraine and Belarus Rail to transport them, delays do happen in infrastructure projects, they said they will run 18 that are certified quite soon, but we will see
@ikilius
@ikilius 5 ай бұрын
@@lkrnpk eduards is a notorious commenter, troll that comments under almost every 16ev related video just to nitpick all of the details regarding the train. please dont bother wasting your time, they perfectly know everything themselves, they just heavily dislike the trains and blame the government for everything:)
@intervrt
@intervrt 5 ай бұрын
you must be fun at parties "hole latvian?" like what are you even trying to say
@eduards5702
@eduards5702 5 ай бұрын
Don’t believe these charlatans from Vivi, they are pv, they deceived everyone so many times, constantly stole money from “modernizations”, constantly robbed staff, taking away their “bonuses” according to plan, about 25%, they also failed the project with Skoda, collecting strange devices made from old parts, so there are only few videos with real trips, they avoid to show all issues happening with these old trash. These "new" trains hum, whistle, rattle like old ruins. The interior is made terribly, everything is gray, it can’t drive normally, there aren’t enough traction drives. They promised to deliver 32 trains at the beginning of this year, only 18 were delivered, and only three were put on the line. They promised to release a new train to Jelgava on Sunday, but they deceived us again. I just threw away the ticket. They could not divide the bribes for more than ten years. And now they made this trash, in which, it seems to me, they stole about 50% of the money.
@intervrt
@intervrt 5 ай бұрын
Estonia has bought very similar trains for an intercity line between Tallinn and Tartu, which I think is what these would be better suited to as well. I can imagine Vivi will put these to use on longer lines when the electrification goes further from Riga than the commuter train line distances that they have electrified now, but I hope they also buy proper commuter train rolling stock like the Stadler FLIRTS in Estonia, Finland and elsewhere.
@lkrnpk
@lkrnpk 5 ай бұрын
What are cruicial differences of this train compared to Estonian FLIRTs aside from FLIRTs having higher % of low floor? They are still not 100% low floor trains. And these trains would be more suited for longer routes with removing some seats IMO. But of course the purchase was compromised in a way that at first it was planned not to use any EU funds to purchase them, and a lot of seats were crammed in due to high demand on commuter lines on peak hours and to show that we get cheap price per seat. And still for Riga commuter lines if passenger growth is like in Tallinn with new trains as it was, 32 of these will not be enough. So sure, in future part of these should go to more electrified sections, like the short term plan is to electrify to Krustpils at least.
@intervrt
@intervrt 5 ай бұрын
@@lkrnpk Looks like these trains have a lot more seating than Estonia's FLIRTs and even more than Finland's (less standing room), and I believe less storage room for bikes. That leads me to believe that they're more suited for intercity routes than commuter lines. > And these trains would be more suited for longer routes with removing some seats IMO How so? People travelling longer distances tend to want to sit down more compared to commuter train passengers no?
@lkrnpk
@lkrnpk 5 ай бұрын
The thing is that by there being so many seats the leg room is less and people are sitting more close packed together + there are no tables in between etc. So a good intercity train would still use better seats, some tables and maybe a bit less of seats in total, like Estonian trains I believe will have less seats than there... Also a true commuter train does not really need a huge place for bikes, like Stockholm commuter trains are packed in mornings, same as these in Riga will be at least in Riga borders, they even do not allow to board at least in Stockholm central with a bike in peak hours, there are ways how to commute with a bike by renting one at the destination for example, if everyone starts bringing bikes on commuter trains in peak hours there are even less room and more room to get dirty clothes from bike tires etc. But then again if we talk about electrified lines we also not have just commuter lines, Tukums II - Riga has express trains, which is then already more like a regional version, or Aizkraukle - Riga, so it is sort of a mix too... I agree that maybe more standing room would be better, then again some of the routes are very specific where most traffic originates at departure and leaves at arrival... Like Jelgava - Riga, most people would go all the way if not to Riga center then some districts from Jelgava, or from any of Jūrmala stops to Riga, ok it is maybe just 45 minute travel time but if they also travel on the same train then further from Jurmala to Ogre, it can already be over an hour. Not many such people there will be probably, it is kinda hard to say, even if these are commuter trains, usually passenger exchange in stations in the middle is not that great, usually they get progressively more packed towards Riga or in summers towards the sea going from Riga@@intervrt
@lkrnpk
@lkrnpk 5 ай бұрын
Also the thing is since Riga central has trains going through it, commuter line can also turn into regional one pretty quickly if the same train is going Ogre - Sloka or some other diametral route and people want to travel through Riga Central, not exit there. Not sure, it is sort of a mix what we have, it is also not purely commuter lines we have, we run some express services on them as regional train sort of too@@intervrt
@intervrt
@intervrt 5 ай бұрын
@@lkrnpk You've typed up a whole lot of text so it's hard for me to reply to it but commuter trains usually have tables too (or maybe just the ones i've ridden do). Even though some don't allow bikes onboard I think it's still more important for them to help bicycle commuting than for intercity trains to do that, right? Maybe I'm wrong, that's just what makes sense to me. And I'd assume leg room isn't something that matters in intercity trains but doesn't in commuter trains, both should have room anyway. Also, if you say over an hour, that seems to cross into intercity territory anyway so I'm not sure that's very relevant
@deathblade2639
@deathblade2639 5 ай бұрын
This is not regiopainter, this is Škoda 16ev
@asis_thoughts4399
@asis_thoughts4399 5 ай бұрын
Ok, you are correct I believe, as in that page for 7 Ev en.wikipedia.org/wiki/%C5%A0koda_7Ev they are under Ev16 though train is from Regiopanter family, I think I said they had 16Ev designation but was not sure if it still can be called Regiopanter... guess not. Or Russian gauge updated Regiopanter :D Updated with more precise naming now.
@eduards5702
@eduards5702 5 ай бұрын
That's right, this is the cheapest craft made from old trash. Latvians are very proud that for the next 50 years they will drive the same trash as before.
@Teta-Proc
@Teta-Proc 5 ай бұрын
Он что, один такой?
@czerep21
@czerep21 5 ай бұрын
Вроде 3, будет 32 если не напутал 😊
@asis_thoughts4399
@asis_thoughts4399 5 ай бұрын
на видео уже два, 0002 и 0006, будет 32 до лето 2024
@kristapszs1
@kristapszs1 5 ай бұрын
Tur ir kur nolikt ričukus?
@lkrnpk
@lkrnpk 5 ай бұрын
Turētāji nav, sola kaut ko uz vasaru taisīs…
@ok-vk9fv
@ok-vk9fv 5 ай бұрын
Vasaraa buus
@viktorsmazurs9741
@viktorsmazurs9741 5 ай бұрын
The train is fine but the color inside is depressing.
@u1zha
@u1zha 6 ай бұрын
I think they (Riga city developers, LU campus developers, etc) should make a concerted effort to build up the entire area around the station, to raise street level above the future platforms, for better accessibility and all... The place is indeed swampy. Digging down in that, to build the underground multi-storey car parks - that's backwards, when there's an opportunity to dig less.
@u1zha
@u1zha 6 ай бұрын
Skyscrapercity - jauda
@u1zha
@u1zha 6 ай бұрын
Awesome progress Trolls may go shove themselves somewhere where light doesn't shine
@QuartsAk
@QuartsAk 6 ай бұрын
Up next Austrumu maģistrāle 2.kārta ?😁
@petrissmalga1993
@petrissmalga1993 6 ай бұрын
Oho Rīga mainās. 😂 esmu Anglijā jau 5 gadus. 😂
@artursurbans8780
@artursurbans8780 6 ай бұрын
Thanks for the content !!
@krebssfish9370
@krebssfish9370 7 ай бұрын
Labi, ka iekļāvi oriģinālo ceļu cauri Ķekavai. Var forši salīdzināt, kāds laiks un ciešanas tiek ietaupītas ar apvedceļu (un to saku kā ķekavietis 😀)
@asis_thoughts4399
@asis_thoughts4399 7 ай бұрын
nu to es paātrināju, bet nu ja, tur visi tie 70 km/h un pati Ķekava... visi piebraucamie ceļi
@daffox5366
@daffox5366 9 ай бұрын
Thanks for review. Will see how this proj will look after some more time. Been there some weeks ago, but saw from outside. The beach currently looks really weird. Would like to believe that it becomes better and currently it's just in realization stage. There little further along the Jugla ezers beach "Hepsor" planning to create the other project. Maybe some day there will be some nice "promanade" between these projects. For sure it's just my imagination, but would like to see this :)
@latviabalkanumuzika1514
@latviabalkanumuzika1514 Жыл бұрын
Paldies par informāciju un ieguldīto darbu. Tā. turpināt 🇱🇻