Thank you very much and really a good clear presentation.
@civilguruarman88765 күн бұрын
Hey i am recently completed my btech in civil engineering...i want to work in gulf country so which is best field in civil??? What about BIM in gulf ??
@eng.mohamad26506 күн бұрын
Please Engineer, as you the class E didn't include the excavation for pipes I have now boq include excavation for pipe and the item is E32 ,so please this payment should be done or not bcz of in class I mentioned that pipes include excavation
@thushanthapitigala27417 күн бұрын
Please share the excel sheet
@abdulbasheer946312 күн бұрын
Hello sir can we track the progress of HVAC works on site with total QTY?
@Natureintro16 күн бұрын
How to install freely planswift
@SameerShaikh-qy3dz18 күн бұрын
Thank you sir for your explanation. How can i get this software ?
@haziqmessi552120 күн бұрын
Tq not helping
@redajith524620 күн бұрын
Sir QS pipe Department Excel work video pls share sir
@martealzate583225 күн бұрын
Thank you for this video. It helps a lot.
@erahmadteaching459126 күн бұрын
great video sir my opinion please speak in hindi also because sometimes candidates are more knowledgeable but its trendy words are not elaborate to the candidate and the candidate does not qualify for the technical interview. some example interviewers ask what is budget. and candidate not elaborate this sentence for acuuartely please speak in hindi so some candidate more understand Regards Mohd Ahmad
@erahmadteaching459126 күн бұрын
my opinion is you are north indian so you mind it my words
@shahzadsiddiqui511729 күн бұрын
Thanks, very useful and updated video. Please provide details to take up the preparatory course
@GOVARDHANRAJAGURRAM29 күн бұрын
thank you
@8836293Ай бұрын
Length you can consider the same, but the diameters will be different for both supply & return line...
@rautelashivendraАй бұрын
Hi sir, i have a request for career advice. Can I connect you on Linkedin.
@milannandi8187Ай бұрын
❤
@MmmddddggАй бұрын
Big issue is the length of the cable which is the only difficulty in this all others are easy… you have any idea for this?
@arunraveendrangr1399Ай бұрын
I have a doubt regarding the control unit cost. You have added the highest quoted rate along with Bidder B's proposal since they did not quote or specify the control unit cost separately. Perhaps they included all the costs associated with this work in a single value due to a misunderstanding or improper reading of the bid documents. Would it be better to clarify this with the OEM before including the highest quoted value in the comparison? This would provide more clarity, wouldn’t it?
@emmanuelsabu9046Ай бұрын
why does this video have no comments?
@KnownFacts_YTАй бұрын
where can i download planswift crack version ?
@balachandrapatgar6135Ай бұрын
Nice
@adriancaz8363Ай бұрын
💩💩💩💩💩
@ErtugrulOsman-e6sАй бұрын
Can you do video regarding cash flow
@QuantitySurveyingStudioАй бұрын
It is already done
@justiceokechukwu9397Ай бұрын
This is insightful and helpful. Thank you! Meanwhile, do you, please, know if they accept payments in instalments, especially for those who could not afford to pay all at once?
@QuantitySurveyingStudioАй бұрын
Not sure on that. You can mail them and check
@praseedadamodharan7054Ай бұрын
Thank you so much🙏🙏🙏
@QuantitySurveyingStudioАй бұрын
You are welcome !!
@tylerhawkins2769Ай бұрын
Hello Sir love the videos, out of curiosity. If the client is to request a variation, the price for that is based on the SOR; if your team has to move all works, say, down three levels and set up again, is this price included in the variation on top of the SOR, or is this a variation for the work then a claim for the disruption. Thank you!!
@QuantitySurveyingStudioАй бұрын
Depends in what is mentioned in the contract. If original design is to be changed then defenitely it is a variation
@manivasagamt6494Ай бұрын
Hi dear I want be connect with you, If possible could you dm me we will discuss more
@QuantitySurveyingStudioАй бұрын
You can connect with me on Linkedin
@zeeshanmuhammad8072 ай бұрын
I gained nothing from this video !
@QuantitySurveyingStudio2 ай бұрын
Then pls watch another video 😊
@mozeygh42852 ай бұрын
Well done
@RahulRaj-lj1pu2 ай бұрын
Sir which software have to learn and do you have have any tutorial in udemy
@QuantitySurveyingStudioАй бұрын
Yes. The link for the courses are provided in description
@ErtugrulOsman-e6s2 ай бұрын
Great information
@QuantitySurveyingStudioАй бұрын
Glad it was helpful!
@ErtugrulOsman-e6s2 ай бұрын
Can you a video regarding cash flow forecast
@QuantitySurveyingStudioАй бұрын
Already made
@ErtugrulOsman-e6sАй бұрын
@ if you share the link it may be grateful
@NimishaCN2 ай бұрын
Thanku for your wonderful class. Easy to learn.
@mohammedashiq47492 ай бұрын
drops?
@smilingsyamkumar59602 ай бұрын
Sir i am working as a civil site engineer i wanti to become a mep engineer. is better to change and can i become mep engineer after learning mep softwares
@harisumair11542 ай бұрын
Sir could you please provide free resources of cost software
@rahuljha59722 ай бұрын
Informative topic ❤❤❤
@rizleno86412 ай бұрын
Thank you so much sir
@karl79322 ай бұрын
Good Vid. Clear, honest and authentic. Definate like.
@QuantitySurveyingStudio2 ай бұрын
Glad you liked it!
@ishanudayanga55112 ай бұрын
great. Can you provide this check list soft copy
@MamdouhKaiyaliRefai2 ай бұрын
One of the best course in QS world Thank you soo much Engineer.!
@m-27282 ай бұрын
Nyc
@QuantitySurveyingStudioАй бұрын
Thanks 🤗
@beautifullyhealthyliz20712 ай бұрын
Thank you for sharing. Just want to ask what if the Time Line were not mentioned or stated in contract can we apply or can be solid basis it if there will be disputes between Contractor and subcontractor?
@surjeetsingh88283 ай бұрын
How can i get cost x software crack version
@Techno-oh8br3 ай бұрын
Congratulations
@alisiddig80243 ай бұрын
Think you Get
@khokhar1523 ай бұрын
where i can find videos on other sections of POMI, Site Work, Woodwork etc.
@m-27283 ай бұрын
Superb bro ..u r only one person to introduce everything in this
@QuantitySurveyingStudio3 ай бұрын
Thank you so much 😀
@ErtugrulOsman-e6s3 ай бұрын
Good Day! Can please answer for this interview question “How will you do cost estimate?
@QuantitySurveyingStudio3 ай бұрын
It depends on which stage the project is at.
@ErtugrulOsman-e6s3 ай бұрын
@@QuantitySurveyingStudio ok can you do a video regarding this chapter