Пікірлер
@DurgaDas96
@DurgaDas96 23 күн бұрын
It’s interesting that roofer videos never have safety gear. I wonder what the fall/death rate is for roofers in general.
@rickythompson2374
@rickythompson2374 27 күн бұрын
You supposed to let it stick over on the edge to up the eve not even with the metal I know I've been roofing for 40 years.
@jamesahr2634
@jamesahr2634 27 күн бұрын
Knee pads
@donnaavent2062
@donnaavent2062 3 ай бұрын
You didn’t remove whole old roof. Because old roofing is heavy weight if you put new roof to cover old roofing. That is illegal.
@theroofguysutah
@theroofguysutah 3 ай бұрын
Always check your local codes. In Utah they allow for two layers of roofing, we checked all the plywood and it was in good condition and installed new drip edge, flashing, and roofing system.
@sargeinamerica
@sargeinamerica 4 ай бұрын
Thanks
@rainmaker3700
@rainmaker3700 Жыл бұрын
Hive mind is in charge~
@stumpynubs5387
@stumpynubs5387 Жыл бұрын
Looks like your instilling gutter apron vs drip edge rake and ridge.
@vincemadera9844
@vincemadera9844 Жыл бұрын
You forgot to tear off the old roof
@ktmcc4360
@ktmcc4360 Жыл бұрын
Instructions on roofing on a roof over job, seriously?
@MD-1996
@MD-1996 Жыл бұрын
Not having any safety harness for you or your cameraman is scary. It’s scary for me just watching it.
@seanmayo206
@seanmayo206 2 жыл бұрын
No good
@seanmayo206
@seanmayo206 2 жыл бұрын
Shingles over shingles
@picoherbie9987
@picoherbie9987 2 жыл бұрын
Wait.. what? Was is how NOT to install drip edge? Those were shingles the drip edge went down on, right?
@FreightRunna8
@FreightRunna8 2 жыл бұрын
On top of shingles 🤣hack job
@thegamingmusketeers6601
@thegamingmusketeers6601 2 жыл бұрын
awesome job sir. its always good to have a harness and a rope even if you don't use them especially on a busy street OSHA will just drive by take pictures
@theroofguysutah
@theroofguysutah 2 жыл бұрын
We are able to put 2 layers of shingles on a roof. Drip edge goes on and then starters and then the new shingles over the existing shingles.
@huntingtonjimmy2999
@huntingtonjimmy2999 2 жыл бұрын
Dead wrong!Drip edge should be put under the shingles!
@Mrsalpiness
@Mrsalpiness 2 жыл бұрын
You must have rough kneecaps
@CompleteExteriorsMS
@CompleteExteriorsMS 3 жыл бұрын
We always install our drip edge on top of the shingle...🤣
@rainmaker3700
@rainmaker3700 Жыл бұрын
LOL
@MichaelDillin
@MichaelDillin 3 жыл бұрын
Thanks for your video. Dreading a swamp cooler replacement. Happy roofing guys... could not have been more ...
@angetodac
@angetodac 3 жыл бұрын
Goes above the shingles or under?
@theroofguysutah
@theroofguysutah 2 жыл бұрын
We are able to put 2 layers of shingles on a roof. Drip edge goes on and then starters and then the new shingles over the existing shingles.
@lamkinsjames
@lamkinsjames 3 жыл бұрын
Looks frozen
@Josh-ww5kz
@Josh-ww5kz 3 жыл бұрын
Wrong. First step flashing diverts the water away from the corner, should be a good 3" down. I usually bring it down to where the front wall flashing is. Then I put in a dummy shingle (a thin part of the shingle, about 4/5" just to hide the side of the flange, looks great and it doesn't affect it at all) you'll just have to double up two steps to extend past the height of the shingle. You shouldn't have the nails that close to the chimney (or whatever it may be) should only have two nails in the top corner, furthest away from the chimney when doing step flashing. Nailing on the bottom part of the flashing isnt needed and if water were to get under the shingles, it's not going to have any room to divert itself off of the flashing without hitting the nail. Keep the shingle about a 1/4" to 1/2" away from the wall to allow for water flow, otherwise it increases the chance of water wicking underneath the shingle if its butted tight against the wall. Same goes for vents and plumbing stacks. The last piece of step flashing is correctly done. But still isn't nailed properly. Although it is better to wrap the piece of step around the corner instead of cutting the excess off. Just makes it so it holds tight to the wall better. The back pan shouldn't be wrapped around like that, should have it extend out atleast 3/4". Then it should be folded down like a dog ear to shield rain from getting in that corner. Always put one shingle under the back pan, then the row above it should have atleast 3" of room to allow water to flow out and not wick under the shingle and sit there. Also helps at keeping leaves and such from getting stuck back there. Should have a positive slope to the back pan so water doesn't just sit, but not to a point that one side has a huge gap on the underside. Learn how to do things properly before posting a how to on KZbin. I hope that someone else did the counter flashing on this otherwise it will most likely leak within the shingles lifespan.
@Mrsalpiness
@Mrsalpiness 2 жыл бұрын
As long as it dont leak or fly off its a fine flashing job. That metal looks real thin tho
@Margarita13ize
@Margarita13ize 3 жыл бұрын
I´m so nervous watching you walking over that roof! very good lesson thanks!
@paulmelnychuk5477
@paulmelnychuk5477 3 жыл бұрын
I'm 65yrs old i live in canada
@paulmelnychuk5477
@paulmelnychuk5477 3 жыл бұрын
I have never seen that edge put down on a shingle roof ever.
@robertcollins6170
@robertcollins6170 3 жыл бұрын
How much gap between facia and drip edge?
@johnn4648
@johnn4648 3 жыл бұрын
Least half an inch
@RP-nt5cf
@RP-nt5cf 3 жыл бұрын
Finally a simple video from someone that knows what they are doing! Bravo!
@thearmstrongway5026
@thearmstrongway5026 3 жыл бұрын
Nice... gotta do a roof or 2 myself this year..
@anthonygonzalez7488
@anthonygonzalez7488 3 жыл бұрын
This should be a video about how not to install flashing for evaporative coolers. 1. Under pressure driven hydraulic force, water can gain entry between the gaps in the sheet metal. 2. Asphaltic Sealant needs to be placed on the base felt extending 6" around the entire perimeter of the ducts base and 4" up the sides. Then an evaporative cooler roof Jack is installed over the felt / base paper and secured with screws , not nails. 4. Piercing the sheathing with a nail gun at a place underneath the coolers pan, can present an entry point for water. I've been on many jobs where the customer tells me that when it rains water is leaking into the attic or down the side of the duct.
@theroofguysutah
@theroofguysutah 3 жыл бұрын
We sealed the flashing and riveted it to the swamp cooler ducting. We should have put that in the video.
@anthonygonzalez7488
@anthonygonzalez7488 3 жыл бұрын
@@theroofguysutah Oh, good job roof guys. I service, repair and install swamp coolers for a living. I thought there was something a little hinky about the video. Again thanks.
@laurakaticich1617
@laurakaticich1617 2 жыл бұрын
@@anthonygonzalez7488 Do you know anyone in Northern California, who installs/repairs swamp coolers? Ours wasn't installed with the roof jack, just sits on the roof, and of course leaked inside.
@ellobo761
@ellobo761 3 жыл бұрын
Thank you for taking the time on this video!
@raymondrodriguez5068
@raymondrodriguez5068 4 жыл бұрын
Kind of scary up there without safety harness, be careful!
@LukeJohnson-yx3rr
@LukeJohnson-yx3rr 3 жыл бұрын
L
@ncvman
@ncvman 4 жыл бұрын
Drip edge over a shingle? Never seen this done. It is placed under the shingle.
@RobertoVanSaint
@RobertoVanSaint 4 жыл бұрын
in a lot of areas you don't have to take off the existing shingles before putting on a new roof. they're prob installing new shingles and underpayment over all that
@RobertoVanSaint
@RobertoVanSaint 4 жыл бұрын
but as i'm continuing to watch i just noticed there is still old drip edge on there. prob ok functionally but looks sloppy
@pauljc45
@pauljc45 4 жыл бұрын
He said near the end that they would be putting new shingles on top, so yea new over the old.
@davidball8875
@davidball8875 3 жыл бұрын
He’s going to shingle over old shingles,
@simpleiowan3123
@simpleiowan3123 3 жыл бұрын
He’d be doing it over and replacing all of the edge shingles he blasted out - were it my house