Can I have my cpd cert fir catchup please? Many thanks Alan G
@zahid19727 ай бұрын
How can I get a CPD certificate as I watched the recording
@zahid19727 ай бұрын
I'm confused, if the timber structure is wrapped in a fire rated material e.g Fire line plaster board then the timber structure meets the 30 or 60 minute criteria. The weak spot will be the roof light 🤷
@Joey-Cameltoe7 ай бұрын
I'm in the majority when I say that these Diversity and Equity policies will be walked back in the future. Meritocracy will take hold again and importance will be put on providing the best service no matter what colour you are. Diversity and Equity is just racism in another name.
@basilparylo17707 ай бұрын
A very good discussion with plenty of ideas and a perspective from a different point of view.
@basilparylo17708 ай бұрын
Very good presentation, very informative.
@cainey1009 ай бұрын
The sound quality is awful!
@delaneyverena365210 ай бұрын
🤔 *Promo sm*
@basilparylo1770 Жыл бұрын
Excellent presentation!
@danceswithrats Жыл бұрын
is a Maisonette regarded as a High risk building ?
@charteredassociationofbuil856 Жыл бұрын
Thank you for your comment. If the maisonette in question is situated within a building above 18m in height, it will be classed a higher-risk building under the Building Safety Act (2022) in England and Wales. Any maisonettes within buildings below 18m in height will not be classed as higher-risk buildings. Many thanks, Chartered Association of Building Engineers
@BlickBoogie Жыл бұрын
Which JCT contract is typically used for new build homes procured via the traditional method?
@dean8498 Жыл бұрын
ᵖʳᵒᵐᵒˢᵐ
@rebeccajenkins5206 Жыл бұрын
Really valuable and informative, thank you!
@emmmadilemma2 жыл бұрын
Currently studying at Wolverhampton University and this was extremely useful. Great presentation, thank you.
@israeliremigio8923 күн бұрын
I'm living in wolverhampton and studying to be fire risk assessor.. good luck on our studies!
@celinehynes33362 жыл бұрын
Hi could you clarify something please. BS9999 16.6.1 says you should discount a storey exit when calculating available exit width (if there is more than one storey exit). However, 17.3.2 says if your escape stairs have protected lobbies you don't need to discount a stair. If escape exits are at the bottom of the stairwells, and the stairwells have protected lobbies, can we avoid discounting one of the exit widths please?
@maxyfeliz92772 жыл бұрын
Pᵣₒmₒˢᵐ 😆
@thomasholmes70512 жыл бұрын
24:50 you have a calculator to work out the simplfied method (perhaps an excel document) is this available to online? if so do you mind sending me a link please.
@neilrobinson99012 жыл бұрын
great presentation
@kenewing84462 жыл бұрын
Av very interesting presentation. Thoroughly enjoyed it.
@hod22 жыл бұрын
This was very well put together by Steve and very useful, thanks. I still feel the fire growth rate section is the weak link on this guidance as this is where the designer starts with an "opinion" which can be influenced by costs or pressures from the client trying to achieve a favoured solution. This first assumption then plays out through the design guidance and so is very important to get right, but is not in my opinion adequately covered within the guidance.
@KH-up3su2 жыл бұрын
Thanks for that it is very useful to upload to KZbin.
@anisoarab18023 жыл бұрын
I almost fell asleep
@johnranson74183 жыл бұрын
Very informative
@kwyau72533 жыл бұрын
Thanks for your presentation
@johnranson74183 жыл бұрын
Very interesting
@stephenparrott33773 жыл бұрын
Thanks everybody. informative as ever.
@KH-up3su3 жыл бұрын
Thanks for useful presentation 👍
@seamus33893 жыл бұрын
JCT MW 2016 CL 4.3 & 4.8 states the final date for payment for interim payments & final payment is 14 days from the due date, not 28 days
@Knobulon2 жыл бұрын
Most of my clients want these clauses changing to either 28 or 30 days
@feemoheat3 жыл бұрын
When discussing how Arbitration is enforced you said 'need leave of courts to enfoce' can you advise what you mean by leave of courts? Thank you