Hey, I managed to follow all the instructions. However, the file format I received was htm. How or were can I change this setting so that the attached file is txt?
@KHZeedsАй бұрын
There is a separate place to do this configuration. Your Basis consultant will help you.
@rajthaya19232 ай бұрын
how to create activity type in routing
@KHZeedsАй бұрын
It is handled by FI module. T code is KL01
@GusSawicki3 ай бұрын
Hi, when the times get confirmed for setup, machine, labor, breakdown, does that data automatically update the times in the system or does it just track the variance until someone can physically change the operation time in the system? Thanks!
@KHZeedsАй бұрын
If you enter time during the confirmation, it is considered as the actual values. Planned values come from the routing to production order. Same will be come to CO11N screen as planned values. User can change the values during the confirmation
@JesusTiros3 ай бұрын
i love you
@arvindgurram21884 ай бұрын
Is this factory calendar setup belongs to MM module or FICO module. Can anyone please respond
@KHZeeds4 ай бұрын
Normally PP team does it.
@maliththeekshana35255 ай бұрын
Well explained!
@jonostankov5 ай бұрын
Will the workflow populate all tables as if one would do it manually like, output conditions, media selection etc?
@KHZeeds5 ай бұрын
I didn’t get you..
@abhilashthombare5 ай бұрын
wtf is that blue box in middle?
@KHZeeds5 ай бұрын
Where?
@monishtarhekarygg24515 ай бұрын
Faltu
@prasadRYP6 ай бұрын
Good explanation sir❤
@bondjames99366 ай бұрын
Hello sir! I have 3 operation and 3 phase(0020, 0040, 0060) and control key with milestone (1). Will my phase be automatically set to 0060 or not? and what happens if I select phase 0020 or 0040? Surely I have automatic confirmation of all phases if I select the last phase (0060)?
@KHZeeds6 ай бұрын
What is your control key?
@bondjames99366 ай бұрын
@@KHZeeds Control Key PI03 (for last phase) with confirmation 2
@bondjames99366 ай бұрын
Hello sir! Tell me pls where is "Operation Quantity" field in Routing?
@KHZeeds6 ай бұрын
You can see the base quantity field inside routing
@bondjames99366 ай бұрын
@@KHZeeds Where is this Tab?
@bondjames99366 ай бұрын
Hello, sir ! Tell me pls what does it mean Key Date on the basic Screen? Is it the same with Valid date from?
@KHZeeds5 ай бұрын
Yes. Key date will be the valid from date.
@vinodkumarbijlwan99216 ай бұрын
thanku sir
@bondjames99366 ай бұрын
Hello sir! is there a separate video on how to calculate time and quantity in master recipe in sap pp?
@KHZeeds6 ай бұрын
Check Work Center formula video…
@KT_With_Sagar.S6 ай бұрын
if there is requirement from 2 production order and stock is present for only 1 order, then for second order system will give the missing part on availability check run. Now if planner decide to take second order on priority and start production immidiatly then system should allocate stock to this order and should not give material shortage for 2nd order instead it should give missing part for 1st order now What to do in such scenario?
@KHZeeds6 ай бұрын
What is your manufacturing scenario. MTO or MTS?
@KT_With_Sagar.S6 ай бұрын
@@KHZeeds mts
@vinaymbhat6 ай бұрын
Hi Thanks for video. Please let me know who will perform SWDD or SWDM workflow building whether its functional consultant job or Technical consultant..
@KHZeeds6 ай бұрын
Functional consultants
@ABHIPATILVLOGS6 ай бұрын
I think you should to give ehat are you doing.
@zakharkoval57406 ай бұрын
Good afternoon, can you please tell me more about what the phase in master recipe gives us and why we need it? Also please tell me in detail: in the section "default Values for operation, phases and secondary resorces" what do the fields Base Quantity, Charge Quantity and Operation Quantity mean. I don't understand what they are for and it would be very good if you could give me a simple example.
@nai80567 ай бұрын
Does this allow for serial number traceability for the part that is being reworked?
@KHZeeds5 ай бұрын
It supports all functionality which normal order does.
@stefaniya86227 ай бұрын
Much needed video. Very clear explanation thank you🙏
@yhhuang12947 ай бұрын
Can i modify exchange rate for existing billing document with VF02 or any t code
@KHZeeds7 ай бұрын
I don’t think you can because billing document is already created. Reverse the document and then redo after changing the exchange rate
@jagga4ru8 ай бұрын
Thank you very much for this video. very well explained.
@sarabusekhar45399 ай бұрын
Have you share full bombos process
@larisaelena64899 ай бұрын
How to add price conditions? for exemple: under 10 pieces to be 1000, over 10 to be 500?
@KHZeeds9 ай бұрын
Try VK11
@manoplaeli402710 ай бұрын
This is stupid system. why they make it so complicate for simple thing. I spend few click in other system while this only possible to understand by IT helpdesk
@KHZeeds9 ай бұрын
Welcome to SAP world…😃
@ohnotoyota469211 ай бұрын
Dear Mr. KH Zeeds, Thank you. Excellent video. It helped me a lot. Cheers
@nanivas210811 ай бұрын
Superb topic sir
@praveenvlogsbangalore1353 Жыл бұрын
Great explanation 😊
@ravisabat2388 Жыл бұрын
How controlling area is created for cost centre
@KHZeeds Жыл бұрын
It comes under CO module. Are u a FI consultant
@ravisabat2388 Жыл бұрын
@@KHZeeds PP it is required while creating work center in cost center
@ManojYadav-ri6pd Жыл бұрын
I want to reverse the confirmation quantity of 2 months ago, even though the period has closed, what is the solution?
@KHZeeds Жыл бұрын
You cannot reverse if period is close. You can open MM period. Discuss with your MM and FICO consultants
@mnn3964 Жыл бұрын
nice . ty
@kasunchamara2737 Жыл бұрын
😍
@AnthonyNwankwo Жыл бұрын
aj hater!! big mouth can you left a groves
@kuunami Жыл бұрын
Thanks. This video really helped me a lot!!
@amarendragoud3333 Жыл бұрын
Hir sir your explanation is very good i have issue i hope you will clear,actually 2 work centers are there 2 work centers control by one Labor so how to split labor time each work center and also cost coming wrong can you tell me how to make formula. Thanks for advance
@KHZeeds Жыл бұрын
Try to add two Capacity Groups.
@khanbaba-mo2sc Жыл бұрын
اڑدو میں بات کرو یار
@tabishalam2087 Жыл бұрын
Very informative. Thanks for this video.
@bhavananagothu9800 Жыл бұрын
could you please make a video on how to add custom fields in bp through enhancements?
@chetanhadiya1998 Жыл бұрын
Really Helpful
@inugantysantosh9360 Жыл бұрын
Hi KH Zeeds, I feel like it is similar to MIGO 261, could you please explain the difference between CO27 and MIGO 261. Thankyou.
@KHZeeds Жыл бұрын
Both T-Codes have similar functionality. CO27 is dedicated for material consumption but MIGO is a multi purpose T-code available in SAP
@guligorlaganesh3505 Жыл бұрын
thank you
@a.wahidtambe8815 Жыл бұрын
Hi, if you don't mind can i get your email ID or contact number ?
@claudiaaka6829 Жыл бұрын
100% satisfying ! Thanks a lot
@arfeenmushtaq4273 Жыл бұрын
Thanks for sharing. Good Tutorial
@GovindKumar-on7xt Жыл бұрын
Sir how delete the production version in SAP
@KHZeeds Жыл бұрын
From C223. Select the line and press delete
@ynnor32 Жыл бұрын
@@KHZeeds Hello sir, is it possible to delete different production versions from several materials at the same time? If yes, can you please explain it? thanks in advance
@neetrab Жыл бұрын
7:00 - We wouldn't have minded if you just blew your nose instead of sniffing throughout the whole video. Thx for the video anyway. Pls do so next time though
@maskmantradingschool Жыл бұрын
In very simple way explained all thank you sir
@rulax19792 жыл бұрын
¡Gracias!
@ravindrasutar22532 жыл бұрын
Can you please make video on LTMC for master recipe