Пікірлер
@גילההנדימןשלך
@גילההנדימןשלך 16 күн бұрын
what is the Difference between test number 1 and number 3 ?
@matthewholbrook-wv6rv
@matthewholbrook-wv6rv 4 ай бұрын
Can you get a differential value across check#2 using this method?
@krisrich3716
@krisrich3716 5 ай бұрын
Excellent demonstration 👏
@michiganbackflowinstitute
@michiganbackflowinstitute 3 ай бұрын
Thank you for the compliment!
@NeptuneBackflow44
@NeptuneBackflow44 7 ай бұрын
do you close all all 5 valves on the gauge before starting Test #3?
@shaunrandall8834
@shaunrandall8834 10 ай бұрын
I can tell you right now you will never pass a AWWA test or a USC test and especially a Ventura County test, with what they are showing you
@michiganbackflowinstitute
@michiganbackflowinstitute 10 ай бұрын
Shaun, thanks for your insight, but, as the video title states, this is an ASSE test procedure. Not AWWA and not USC. Different tests have different procedures. Also of note, being that we're the MICHIGAN Backflow Institute, we focus on Michigan regulations, not Ventura County, California.
@AlbertFrederickLarun
@AlbertFrederickLarun 5 ай бұрын
You should start your own channel and show us your brilliant methods to pass tests. As far as Ventura County--or anything else from California is concerned--nobody wants to smell that sewer. Keep it to yourself next time.
@treeevordubz1567
@treeevordubz1567 11 ай бұрын
Was this the actual test exam in Michigan?
@michiganbackflowinstitute
@michiganbackflowinstitute 7 ай бұрын
This covers not only the exam, but in field testing in the state of Michigan.
@BrickTop900
@BrickTop900 Жыл бұрын
Yeah great video just got a 5 valve test kit and it’s helped immensely
@michiganbackflowinstitute
@michiganbackflowinstitute 10 ай бұрын
Happy our video help!
@handyman9366
@handyman9366 Жыл бұрын
Hello, what if the checks appear to hold >1PSI, but slowly, over say 10 hours, bleed below 1 PSI? In other words, how long do the checks need to hold >1PSI to pass? Thank you!
@michiganbackflowinstitute
@michiganbackflowinstitute 3 ай бұрын
Thanks for the question. If a check is not holding, then that is considered a fail. There is no documented time limitations. A leak is a leak, be it 5 minutes, or 10 hours.
@haroldhayes7541
@haroldhayes7541 Жыл бұрын
Quit tilting the test gauge ya clown
@twtw2247
@twtw2247 2 жыл бұрын
If you add water to the air inlet valve after removing the bonnet in the air inlet test water will come out the bleed hole once the air inlet opens easiest way to verify air inlet opening I know series 5000 doesn't include that ask Sean Cleary why not
@jeffvlisides1518
@jeffvlisides1518 2 жыл бұрын
Nice observation. We do not include this as you mentioned, the series 5000 does not either.
@BenGerman3345
@BenGerman3345 2 жыл бұрын
I like how at the end she said open the valves on the test kit to drain water, and he proceeded to ignore her and put the bleed screw in. Shit made me laugh for a minute
@JimmyBackflow
@JimmyBackflow 3 жыл бұрын
Observing the test kit gauge needle holding steady after introducing high pressure water downstream of the second check valve at test cock cock number four and closing test cock number two only indicates that there is no downstream demand. If the test kit needle holds steady this is an indication that the backflow prevention device assembly is in a static state. It does not indicate that the downstream shut-off valve (number two shut-off valve) is drip tight. Also to confirm that the second check valve is holding drip tight against backpressure, test cock number should be open. If test cock number two is closed how is high pressure getting to test cock number four to backpressure the second check valve. After applying high pressure water downstream of the second check valve one should observe the relief valve port. If water does not discharge out of the relief valve and there is no downstream demand, the second check valve is considered drip tight with backpressure. If water discharges continuously out of the relief valve when applying backpressure to the downstream side of the second check valve, this is an indication that the second check valve is not hold drip tight against backpressure. (Disc compression should be taken into consideration if a discharge is noted but stopped.) When evaluating the first check valve the actual differential pressure reading should be recorded on the test report form.
@jeffvlisides1518
@jeffvlisides1518 3 жыл бұрын
A very nice and extensive explanation of the procedure reiterating what the ASSE 5000 says. I hope this helps explain better than when we read it from. The book.
@rajayounis699
@rajayounis699 3 жыл бұрын
Very helpful to learn
@edwardniemczura1583
@edwardniemczura1583 4 жыл бұрын
These guys are great, they really give you the full understanding of these devices and the importance to their real world application!
@michiganbackflowinstitute
@michiganbackflowinstitute 10 ай бұрын
Thanks Edward!
@yamahondazuki95
@yamahondazuki95 4 жыл бұрын
Excellent video. My exact procedures to the T.. Excellent instructions, simple, and to the point.