Good Day Engr. pwede po pagawa ng Video tungkol sa kaibahan ng Beams, like Tie beams at floor beams? at kelan lang po ito denedesign?
@dipdewdee8322Күн бұрын
Good Day Engr. pano po nakuha yong 9.62 na Volume of Gravel na galing sa Footing at Wall Footing ?
@ARONJAMESGARCIAКүн бұрын
@@dipdewdee8322 that is 7.62cu.m
@aliamensambolawan6983Күн бұрын
Sir. Pwedi po mka hingi ng file nito. Tnx.
@ARONJAMESGARCIAКүн бұрын
@@aliamensambolawan6983 anong file po estimate file for CHB? wala po akong excel file niyan ma'am.
@rogernbackyard66772 күн бұрын
Sample no.2 412.8/5625=0.07333666667 0.07333666667/3.1416=0.02335) Or 23.35 Mpa
@carlnarciso11992 күн бұрын
Sir, question lang po regarding dun sa last part, sa may tabulation po. Dun sa Total Volume of Excavated Soil, bakit hindi nasama yung excavated volume ng wall footing? Vtotal = Vfooting + Vcut of sog = 34.684 + 0.58 = 35.26 yung nasa video po. Hindi po ba dapat Vtotal = Vfooting + Vwall + Vcut = 34.684 + 13.734 + 0.58 = 48.998 cum? Looking forward for your response. Thank you in advance sir. 🤙🏼
@louki59533 күн бұрын
eto talaga sumasagot sa mga struggles ko. by the way sir sa last ld table panu po nakuha ang minimum development length na 300? 5:23
@ARONJAMESGARCIA3 күн бұрын
@@louki5953 constant as per code.
@louki59533 күн бұрын
@@ARONJAMESGARCIAthank you sir!
@jmandhanna01137 күн бұрын
hi sir ilan mm advisable if gagamitin pang flooring sa tubular 2nd floor instead phenolic board?
@ARONJAMESGARCIA6 күн бұрын
Mahal kung gagamitin pang sahig. Hindi ko siya marerecomend na gamitin pang sahig
@louki59537 күн бұрын
ganda po talaga nito. sana naman mapansin mo ulit sir. sir sa total weight po na 841.75 kgs (17:42) di po ba e a identify kung ilang kgs ang 10mm dia at 16mm dia? sana po masagot. salamat po.
@ARONJAMESGARCIA7 күн бұрын
@@louki5953 hindi na kailangan, ang kailangan mong paghiwalayin yun quantity ng 10mm at 16mm para sa order of materials.
@louki59535 күн бұрын
@@ARONJAMESGARCIA ayun! salamat po sir! ano rin sir. sa beam1 main bar length with splice na 6.55 meters sir. paano po kinukuha sir? ( 14:26 )
@SoulHunter-cz5xm8 күн бұрын
Sarap nyan lasang tae😂😂😂
@louki59538 күн бұрын
bakit po 3w/4 po yung center sir? di po ba w/2 lang? 9:05 thanks po
@AaiceeAn9 күн бұрын
Hi Engr. Hinahanap ko po ang plumbing pero wala siya? Wala ba talaga or ako lang ang di makahanap ? Hahahaha naka ilang balik balik ako sa mga vedio mo pero wala jud dinako makita 😢
@dabhebz396811 күн бұрын
sir baka pwede ka po gawa ng videos ng mga problema sa construction and mga solusyon po for example how to fix po kapag honeycomb yung buhos, or paano po mag metal brace/ concrete jacket kapag bagsak po sa 28 day test yung concrete sample
@buddydulog631111 күн бұрын
God bless engr.
@armbelbernal779411 күн бұрын
thanks dito sir.. although medyo one sided since nagpopromote kayo ng product, meron pa din akong natutunan at nakuhang idea.. thanks
@jambosegun300012 күн бұрын
Confused ako sir 2db times 2 for possible elongation.
@geni91113 күн бұрын
Sir, ask ko lang po kung cover ng gravel bed yung allowance na naka-set para doon sa excavated part for formwork ng footing.
@ARONJAMESGARCIA13 күн бұрын
Yes po kasama sa lalagyan ng graba pero kung masiyado ng malapad kahit wag lagyan lahat atleast 100mm mulas sa mismong footing pwede na
@geni91113 күн бұрын
@@ARONJAMESGARCIA thank you sir!
@ENGINEERFACTOR16 күн бұрын
2024 pa shout out po Sir Engr. Facts 👷
@ENGINEERFACTOR17 күн бұрын
2024 everyone?
@rogernbackyard667717 күн бұрын
Maraming salamat engr.nadagdagan na naman Ang kaalaman ko
@Lizardtriplettail19 күн бұрын
Talagang mali kung sa drainage e-tap; dapat sa sewer line nakatap ang outlet galing leeching chamber kasi dadaan yan sa waste water treatment facility. Ang ginagawa namin kung walang sewer line sa area ay 3 chambers. Ang 2 chambers ay sementado lahat. Ang pangatlong chamber ay hindi naka semento ang bottom part, bagkos ay nilalagyan namin ng gravel at dyan hinayaan na e-absorb sa lupa ang tubig galing sa leeching chamber.
@JaphethMirafuentes21 күн бұрын
Paano po kinuha yung 0.49', 0.82', at 2.13' sa may column part? Para alam ko po paano icompute pag iba ang size ng column tulad ng 0.30mx0.30m
@louki595321 күн бұрын
napaka informative po talaga. question po sana bout sa calculation ng required development length ( 4:47 ) di ko po ma kuha yung 136.72mm. here's how I didt it.. Ab= 3.14 x [12(12)] / 4 Ab= 113.04 ldb= 0.02x113.04x275/20.7 = 30.03 please teach me.
@ARONJAMESGARCIA21 күн бұрын
Get the Squareroot of 20.7 first
@louki595321 күн бұрын
@@ARONJAMESGARCIA ohhhh. thanks sir!
@louki595319 күн бұрын
@@ARONJAMESGARCIA Hello sir. its me again. Ive been having a hard time trying to figure out the total wastage. GIVEN: -12diaX6m (in use) -18 pcs total rebars per footing ( x & y) -1.3m cutting length ( with hook) -3 sets of footing -------------------------- SOLUTION: 1. [ TOTAL QUANTITY ] 18x3 = 54 pcs of 1.3 Meters of rebars needed 2. [ CUT LENGTH PCS PER 6M ] 6m / 3m = 4.62 or 4 pcs 3. [ WASTAGE PER LENGTH ] 0.62m x 1.3m = 0.806 m 4. [ TOTAL QUANTITY of 12diax6m ] 54pcs / 4pcs = 13.5 or 14 pcs of rebars 5. [ WASTAGE OF #4 ] (1.3-0.5) x 6 = 4.8 pcs @ 1.3m so now, Ive gathered all the wastages and this is what I got: 14 pcs @ 0.806 meters, 4.8 pcs @ 1.3m To confirm I projected all the 14 pcs of 6m rebars in CAD DRAWING with a 1.3 cut length and I only got: 14 pcs @ 0.806 meters, 2 pcs @ 1.3m I dont know where I messed up. man,Im confuse. please.
@JomariFrancisco-c7l22 күн бұрын
anong formula ginamit nyo sir?
@denceljohnabrio237122 күн бұрын
Good day po. Please enlighten me po. Curious lang po pano nakuha yung 16db? 7:46 Di ko po kasi maintindihan paano gamitin yung Table 425.3.1 ni NSCP. Ang pakaalam ko po eh 6db+12db yung hook..
@DencelJohnAbrio22 күн бұрын
Sir using table 425.3.1 paano po nakuha yung H1=16db? 3:12
@DencelJohnAbrio22 күн бұрын
Hindi po ba 6db + 12db po?
@ARONJAMESGARCIA21 күн бұрын
@@DencelJohnAbrio12db + 3db + db
@ARONJAMESGARCIA21 күн бұрын
lex + radius of bend diameter + bar diameter. 12db + 6db/2 + db
@villapusa482523 күн бұрын
Anong NSCP code poo ito makikita?
@lloyddughon817126 күн бұрын
Yung depth ng footing will vary sa actual if may nga NGL na hindi pantay.
@ajhemarlakit421626 күн бұрын
Salamat po sa paliwanag pashout ot po sir
@sarikhassan897726 күн бұрын
Paano naman po Sa RC wall ng Concrete water tank?
@cezexploresvlogs27 күн бұрын
Sau lng ako mas bilib at kumukha ng hint. Bakit lahat ng ipinapakita nio ay gawain ng trabahador ko. Pag sinita ko. Pilosopo. Lalo n spacer. Ulit2 kong sinsabi gumawa ng spacer. Hindi yata alam gusto pa e demo yata. Pag nasakit n ulo ko. Hinto trabaho.
@user-co1pd6qz1x29 күн бұрын
❤❤❤❤❤❤
@greattaste5230Ай бұрын
Paano po malaman ang haba ng wall footing or total na haba ng wall footing 6:16
@ARONJAMESGARCIAАй бұрын
@@greattaste5230 add mo lahat ng haba ng wall footing.
@johnanthonyabe2064Ай бұрын
Good Day Engr! ask ko lang po for clarification yung Ecavation volume na 35.26cu.m po ba is from footing lang ? sa voice over po kasi namention nyo po na pati wall footing po. kung footing lang po kasi base sa calculations mo po is just 34.684 plus yung Vcut sa porch area na 0.58 kaya naging 35.264cu.m . pero kung isasama po yung pati sa wall footing na 13.734cu.m ay di po makukuha ang 35.26cu.m Thank you po Engr sana ma notice, more videos and more power po God Bless!
@ARONJAMESGARCIAАй бұрын
@@johnanthonyabe2064 please check this video for clarification kzbin.info/www/bejne/aaCsYnWQYr1_n8ksi=EKqoIwYNZy01Jq_B
@JOVIV__TVАй бұрын
Sir,gaano Po ito k tagal ibabad s tubig?salamt Po sana masagot
@ARONJAMESGARCIAАй бұрын
@@JOVIV__TV may 7, 14 & 28 days
@k1ng953Ай бұрын
me in class: 🥱😴. me watching a tutorial of estimating: 😏
@josenoblejas5405Ай бұрын
Ano ba ang tama, maunang buhusan ang mismong tapat ng column bago ung nsa paligid o vise versa?
@user-wg5ky9ti6rАй бұрын
Tama nman ang mga sinasabi mo engi pero nakasanayan na ang pinapakita mong Hindi Tama Yung nagiiwan Ng konting d nabuhusan kaso kc d pare parehas ang budget Ng mga nagppagawa Ng bahay kaya d mqiiwasan ang ganyang sestima
@user-eb2ne4og8wАй бұрын
Pinacocomplicate niyo masyado maraming technicalities
@ceciliaespinosa-zb8nbАй бұрын
Maraming foreman n very poor man sa akin. Ks sila ang nag command ng maling mga strategy. Hindi ako engineer. Teacher lng ako may alam lng sa masonry.
@ceciliaespinosa-zb8nbАй бұрын
Thanks for the info,
@louki5953Ай бұрын
nice! sir san galing yung 0.1 sa calculation ng beam? 7:28
@hhhrnlyn5 күн бұрын
1month late. Para yun sa magla-lap(dugtungan) ng plywood which is .05, 2sides yon kaya +0.1
@perlseroma8960Ай бұрын
good morning. Maari mo ba ako matulungan at mabigyan ng tamang guidance tulad mo na legit. Nakita ko ang video and your comment/suggestion to make the building stronger. Ang plano ko sa aking area ay magpatayo ng tindahan maliit lang naman po, Sana ay matulungan mo ako sa matagal ko ng hinahangad na matibay, legit na construction.
@louki5953Ай бұрын
hello po. di po ba maa identify as excavation ang porch area?
@ceciliaespinosa-zb8nbАй бұрын
Hindi din ubra yan sa akin. Hindi ako engr. Pero Gravel muna bago ilapag ang parilya.
@linuxboy007Ай бұрын
Ano po kaya ang compressive strength sir ng ganyang concrete cylinder sample kung may 4 mm steel reinforce