Рет қаралды 16,639
Drone video of the construction of the Botevgrad - Mezdra expressway - (I-1 E-79) - Lot 1 and 2 - from Novachene to Mezdra
The road will be two-lane with two lanes for traffic in each direction, with a gauge of 20 m. The route will follow the existing road, passing by the villages of Lyuti dol, Tipchenitsa, Novachene and Skravena, it will pass along a new track.
Two tunnels, 490 m and 340 m long, are being built on the Lüti bypass. A number of facilities will be built and repaired along the route - above the railway. p. the Mezdra - Sofia line, bridges over Iskar River, Malata Reka, Kalnitsa, Bebresh, Rudarka, as well as a road junction between the village of Novachene and Lyutidol.
According to the initial project, the intersections of the republican and municipal roads were to be carried out through roundabouts "Mezdra", "Darmantsi", "Rebarkovo", "Lyuti dol", "Skravena" and "Botevgrad", but at the moment the project is being revised and expected these roundabouts become two-level road junctions with direct directions coinciding with the new expressway.
The construction of agricultural overpasses, recreation areas, etc. is planned.
Video: Botevgrad - Mezdra - road reconstruction - Lot 1-2
Date: 22.09.2024
#mezdra #vraca #botevgrad #vidin #bulgaria #skypoint
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is a violation of the license under which this video is available on the KZbin platform