25,000 Volts Under the Sea: Laying of the San Juan Cable (1952)

  Рет қаралды 10,898

BonnevillePower

BonnevillePower

Күн бұрын

This BPA film tells the story of the world's longest single-length submarine high-voltage cable, which delivered electric power from the Columbia River to the San Juan Islands in Washington state in 1951. The project, designed and carried out by BPA, involved laying four and a half miles of 25,000-volt electric transmission cable (conductor) across Rosario Strait from Anacortes to Decatur Island. Other facets included installing a wood pole line on the island, followed by another two-mile submarine power cable to Lopez Island. The project cost $600,000 and was considered a major technological achievement at the time. This BPA film, also known as "The Laying of the San Juan Cable," shows the planning, engineering, transportation and installation of the submarine cable. The cable, which was four and two-thirds inches in diameter and weighed 19 pounds per foot for a total of nearly three-quarter of a million pounds, was wound for shipping in one continuous 7.5-mile length. The film also includes an animated model that demonstrates how the cable was carried inside the ship. The project began April 17, 1951, and Orcas Power and Light Cooperative began receiving power from BPA on July 22, 1951.
Cable failures in the 1960s led to a second cable installation in 1966 and a third in 1972.
Learn about other BPA films at: www.bpa.gov/goto/Films.

Пікірлер: 4
Intertie (1969)
27:32
BonnevillePower
Рет қаралды 22 М.
Stringing and Sagging a High-Voltage Transmission Line (1950)
28:33
BonnevillePower
Рет қаралды 101 М.
Bike vs Super Bike Fast Challenge
00:30
Russo
Рет қаралды 22 МЛН
Highline: Pacific Northwest's High-Voltage Transmission System (1950)
20:25
The World Behind Your Light Switch (1966)
27:20
BonnevillePower
Рет қаралды 9 М.
The Columbia: America's Greatest Power Stream (1949)
21:04
BonnevillePower
Рет қаралды 11 М.
Conductor Sag Demonstration - DOE Smart Grid Workforce Training Video
6:04
Value of the River - Transmission
11:17
BonnevillePower
Рет қаралды 37 М.
River of Power (1987)
28:37
BonnevillePower
Рет қаралды 14 М.
2021 Administrator’s Excellence Awards
1:15:55
BonnevillePower
Рет қаралды 6 М.
Sparks Fly as BPA Tests New Equipment at Celilo Converter Station
1:26
BPA's ultra-high-voltage lab sparks Frankenstein fantasies
0:56
BonnevillePower
Рет қаралды 4,8 М.