This is very badly desined system. Customer have to spend more. Either u can go for hybrid or to save money can install 3kva/5kva ongrid and add/use a normal inverter for backup(existing inverter). This will definitely increase cost. Also most of the time shadow will be there on ongrid panels.
@SenthilKumar-eh9kl4 ай бұрын
Bro go for hybrid two sets waste
@bharatham69104 ай бұрын
In Gujarat, the government is giving money to customers for solar export. No networking charges.
@SubburajBose-ll8pu4 ай бұрын
What net working charges?
@Rahul-hf4ve4 ай бұрын
Bro if we have 3 single phase connections will we be able to tally all the three connections usage?
@saronathan2619Ай бұрын
can, but first calculate all the loads from the 3 eb connections, and then choose the right one, and connect the other 2 eb connections the 1st ongrid net meter connection !!
@MuthukumarMuthukumar-o5s4 ай бұрын
Sir .5hp moter solar potturukam sir .output 3phase Ac varuthu sir .athula nutral option kudukkala veettu useku onday mattum venum sir .adhukku inverter podanuma illa mppt control baxla edukkalama
@shanmugamjayaramachandran3684 ай бұрын
Have you received subsidy
@ilakkiyanav74624 ай бұрын
Pipeline terrace mela pogama iruntha, floor space usable ah irunthurukume. Just a suggestion.
@aswinachu41804 ай бұрын
After installing on grid will we be getting that 100 free units?