815 Pine Full Deck Cycle Time Lapse - Seattle, Washington

  Рет қаралды 143,252

The Conco Companies

The Conco Companies

Күн бұрын

Conco is often asked to accelerate the construction process in order to get a project to market rapidly. A case in point is 815 Pine, a 40-story residential tower in downtown Seattle, owned by the Holland Partner Group. The owner was adamant that the project was to be built on time regardless of weather conditions in the ever-changing Seattle market.
Conco was tasked with constructing a complete floor every week. This time-lapsed video of Level 34 pour day through Level 35 pour day illustrates how we have accomplished this. Major tasks completed by day were:
Day 1: Pour slab, core slab, walls, & columns. Start framing Level 35 deck.
Day 2: Jump core form. Strip columns. Complete L35 deck. Charge boundary elements. MEP layout.
Day 3: MEP layout. Edge forms. PSR rail install. Core rebar install. Bottom mat rebar.
Day 4: Perimeter panels jumped. PT install. Core walls complete.
Day 5: MEP/Pex pipe installed. Top of slab formwork. Embed installation. Charge column rebar cages. Clear deck, prepped for pour.
In the case of 815 Pine, a 5-day cycle using a single shift fit the construction schedule and exceeded the expectations of the developer.
Working with general contractors and owners, Conco strives to find solutions that meet the demands of each unique project for which it provides services.

Пікірлер: 36
@justycrusty
@justycrusty 6 жыл бұрын
Can’t believe how quickly you’re setting form work up on green slab for next lift. Organisation must be spot on. Well done 👍
@AwsomeVine
@AwsomeVine 4 жыл бұрын
This small project and space easy work.
@Wsi-connect
@Wsi-connect 10 жыл бұрын
Great time lapse video from our friends at Conco Commercial Concrete Contractors
@siyabongasibusiso3467
@siyabongasibusiso3467 3 жыл бұрын
How big and thick are those columns 👍👌👍👍👍👍👍👍👍👍👍
@timwalcott3169
@timwalcott3169 4 жыл бұрын
I used to love doing these placing boom jobs. From the decks to columns to core walls. Each and every pour was a exciting way to see the city and get new perspective of the real way to do professional construction with all the trades! I miss it now that I’m retired!
@rafflegiveaways
@rafflegiveaways 3 жыл бұрын
I'm a placement boom operator loooonnnnggg hours great job delicious $$$$$ cheers to you pumper
@jacklaher5065
@jacklaher5065 5 жыл бұрын
Quite the load being place on a PT deck before it is stressed. Must be special provisions in the specs.
@jakedehnert7936
@jakedehnert7936 10 жыл бұрын
Let's not forget a pat on the back to the plumbers at Stirrett Johnsen for helping pull that off.
@ahmedkamal7738
@ahmedkamal7738 3 жыл бұрын
Wonderful video great job
@drewstrom75
@drewstrom75 7 жыл бұрын
What I find most interesting is the placement (and replacement) and use (or lack of) of the porta-johns.
@alkifxns
@alkifxns 2 жыл бұрын
Incredible!!..
@marlineharrold1937
@marlineharrold1937 5 жыл бұрын
wonderful video.
@jamesrobinson1022
@jamesrobinson1022 2 жыл бұрын
These guys need to come to Detroit on the Hudson site. They are taking forever compared to this. They just switched from steel to concrete about a month ago and barely went up 1 floor. There is two buildings but the shorter one is structurally topped out at 12 floors while the actual tower is going to be 49 floors. Ground was broken back in 2017 and they started with the old pit from the Original Hudson Department Store that at one point was one of the largest in the world.
@evanhanson1807
@evanhanson1807 3 жыл бұрын
there are moments that you see before handrail was put up past the decking level where they really should be tied off. Have I been somewhere where I should have been tied off but wasnt, sure, but i have also never worked on a building this high up. lots of respect but we should be a little more active with safety.
@alikhi7817
@alikhi7817 4 жыл бұрын
I Adores this work
@Cdplayr69
@Cdplayr69 8 жыл бұрын
wow very cool
@sandip0sheta
@sandip0sheta 8 жыл бұрын
best work
@souchakriya9979
@souchakriya9979 Жыл бұрын
Impressive. How about PT stressing? When will you do it?
@susanaapolayo
@susanaapolayo 3 жыл бұрын
bellaquera!
@jeffreyloftus3617
@jeffreyloftus3617 6 жыл бұрын
There seems to be a lack of rebar in the deck slab with the centres appearing to be over two foot !
@breakingrefractory5967
@breakingrefractory5967 6 жыл бұрын
jeffrey loftus post tension slabs generally have less rebar
@timwalcott3169
@timwalcott3169 4 жыл бұрын
jeffrey loftus that’s where post tension cables come in !
@seangreene64
@seangreene64 5 жыл бұрын
That’s why these dam monstrosity are falling apart.
@mattwind8259
@mattwind8259 6 жыл бұрын
Great job, was as a set accelerator used for the mix on this project? What was this slab area?thickness?
@h1ph0pjunk1e
@h1ph0pjunk1e 6 жыл бұрын
had to have set for sure or elese vertical cant get pourd after the slab
@kurulusosman8727
@kurulusosman8727 2 жыл бұрын
😍😍😍
@angeloacosta9411
@angeloacosta9411 4 жыл бұрын
Porta-john is on the floor below...
@SandipKumar-nd9fl
@SandipKumar-nd9fl 6 жыл бұрын
concrete is good meterial for building construction
@pdemont8854
@pdemont8854 4 жыл бұрын
I see the concrete pump. How is it loaded?
@pixelbender896
@pixelbender896 4 жыл бұрын
It's a shaft boom loaded from the bottom
@sahilturgut7561
@sahilturgut7561 6 жыл бұрын
me opt con....Boom.. plac..
@fabientre2800
@fabientre2800 2 жыл бұрын
Wouldn't precast columns be much more efficient?
@MsALIE1015
@MsALIE1015 10 жыл бұрын
What is PSR rail?
@balwantsingh690
@balwantsingh690 6 жыл бұрын
g HGH tv
@susanaapolayo
@susanaapolayo 3 жыл бұрын
bellaquera!
@susanaapolayo
@susanaapolayo 3 жыл бұрын
bellaquera!
970 Denny 4 Day Cycle - The Conco Companies
7:29
The Conco Companies
Рет қаралды 20 М.
Highrise Concrete Pour in Seattle
11:21
Local 528 Cement Masons & Plasterers
Рет қаралды 1,6 МЛН
Cute kitty gadgets 💛
00:24
TheSoul Music Family
Рет қаралды 21 МЛН
王子原来是假正经#艾莎
00:39
在逃的公主
Рет қаралды 25 МЛН
Just Give me my Money!
00:18
GL Show Russian
Рет қаралды 1 МЛН
طردت النملة من المنزل😡 ماذا فعل؟🥲
00:25
Cool Tool SHORTS Arabic
Рет қаралды 33 МЛН
5th & Columbia Mat Foundation Time Lapse
3:01
The Conco Companies
Рет қаралды 40 М.
CONCRETE DECK SHORING SYSTEMS
12:14
carpenters1256
Рет қаралды 7 М.
Road Reconstruction | 8th Street | Full Timelapse
6:20
Team Elmer's
Рет қаралды 318 М.
Elon Musk Unveils UFO Fighter Jet That Defies Physics
21:09
Hyperspeed
Рет қаралды 4,7 МЛН
Flying Tables.. 400 feet above ground..
4:12
Rey Espinoza
Рет қаралды 13 М.
Seattle 3 Year Time-lapse Video from the Space Needle
3:56
Ricardo Martin Brualla (youtube)
Рет қаралды 617 М.
Jumpform - SlipForm
5:21
Constro System
Рет қаралды 96 М.
Success with Self-Performance: Slip-Form
2:45
Brasfield & Gorrie
Рет қаралды 17 М.
Cute kitty gadgets 💛
00:24
TheSoul Music Family
Рет қаралды 21 МЛН