A different way to pour concrete in this 40X56 pole barn.

  Рет қаралды 417,607

Bondo Built

Bondo Built

2 жыл бұрын

Another time and money saving tip when you pour concrete floors in a pole barn. This barn has radiant heat and a trench drain down the middle. It was also spray foamed under the concrete right on the tamped gravel. We worked with the home owner and he built it in a way that made our life a lot easier when it came time to do his concrete work. He will be heating this building with a wood boiler. Let me know in the comments what you guys think. Thanks for watching.

Пікірлер: 231
@mademad2
@mademad2 Жыл бұрын
We did our 40x60 pole barn floor without the wall metal on. Had the roof on. We did 12w 13ft tall doors so concrete trucks could drive right in and chute it. No radiant heat plumbing to worry about. Nice and easy to finish edges from outside while power trowel does the rest. Nice video
@bondobuilt386
@bondobuilt386 Жыл бұрын
Thanks it is so much easier.
@moman0166
@moman0166 Жыл бұрын
This is exactly how we pored my floor for my two story shed floor with a big mud drain for my Snap On Tool Truck with plenty of storage for extra tool boxes plus I fixed my walls to be waterproof so I could wash my truck in the winter. When my wife came in with her storage stuff I pointed to the second floor.
@bondobuilt386
@bondobuilt386 Жыл бұрын
Sounds like an awesome shop
@vincentmeyers9365
@vincentmeyers9365 2 жыл бұрын
Professionals always make the really hard jobs look easy. You guys are awesome!
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks pal.
@sethheath9568
@sethheath9568 2 жыл бұрын
Nice work. Glad to see a crew that has fun working together.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Seth. We do enjoy this work.
@jimwesselman
@jimwesselman 2 жыл бұрын
That is going to be a sweet workshop, thank you for sharing!
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Jim
@d.i.whynot4684
@d.i.whynot4684 2 жыл бұрын
Thanks for sharing! There’s so much to concrete- thanks for educating us.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
You bet. Glad to help.
@jamescarson9118
@jamescarson9118 Жыл бұрын
Love the banter! Great crew
@kennyminde782
@kennyminde782 2 жыл бұрын
We build pole barns in central New York, I always pour before the steel goes on,saves a lot of work like you said
@johnmorley6663
@johnmorley6663 6 күн бұрын
Lost my Dad in January, he was a finisher for 40 years....
@6582rg
@6582rg Жыл бұрын
You guys really do incredible work. My back hurts watching it.
@1UTUBEUSERNAME
@1UTUBEUSERNAME 2 жыл бұрын
I like how you get excited when the truck shows up lol.
@GRUBB-MUDD
@GRUBB-MUDD 2 жыл бұрын
_GOOD JOB BIG BISKET _ don't drip water on it! Effervescence! Nice work, BTW great job explaining everything. You hit every point down to the cleaning the blades b4 your last 2 passes
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks buddy I try to explain it all.
@darylstimmel6845
@darylstimmel6845 2 жыл бұрын
Looks great guys!!! A GREAT finisher always is one handed and a cool beverage in the other for that super smoooooth job..
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ya exactly Daryl. A true pro. LOL
@frankflanagan109
@frankflanagan109 2 жыл бұрын
Turned out great!
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Frank
@trevormorgan6611
@trevormorgan6611 Жыл бұрын
Here in the UK, its quite common to use a pan, { which just clips to the blades ] for the first pass. It makes flattening any bull float marks a lot easier, as you can get on the concrete a little earlier, without the risk of digging in. It also helps settle the stones and brings fat to the surface like a wooden, or plastic float does. I have not seen anyone in the states using one, are they common over there, or not used?
@edstevens9357
@edstevens9357 2 жыл бұрын
Wish that barn was in my yard. Nice job as always
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Ed
@johnguice716
@johnguice716 2 жыл бұрын
Another good job
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks John
@edpoints1127
@edpoints1127 2 жыл бұрын
We always put air pressure (test) with guages on each heat zone when we pour. If there's a puncture or leak in any line while pouring, there won't ever be a better or easier time to find out and repair it
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yes some do that. We have never punctured a tube. They are very durable. Its easier to kink them then to puncture them.
@johnhogan3810
@johnhogan3810 Жыл бұрын
The pressure saved my ass. One of the guys did something to a hose. I was able to see it right away and dig it out as soon as it would hold me. I just dug out a 6 by 18 inch trench around the bad spot. Shoved in some rebar to hold the patch. We did the repair the next day. I WILL NEVER POUR WITHOUT PRESSURE IN THE LINES. Why would you risk it. You have to pressure test it before you pour (unless your an idiot). Just leave the pressure test run till after the pour.
@andycrawford8689
@andycrawford8689 2 жыл бұрын
Nice job y'all did there keep up with the good work ur doing and the videos to be safe and be careful
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Andy.
@buelowexcavating
@buelowexcavating 2 жыл бұрын
Good information. It is important to have all the trades involved in a project before it starts. I built my first new home in 1978, (I thought I knew what i was doing). Did a lot of work myself, but subbed out the HVAC, plumbing and electrical. The heating guy said he had to come in first, and I believed him. The house was a rectangle, he put the furnace a few feet from the basement wall and ran the heat and return ducts a few inches apart from one end of the hose to the other. The plumber was very unhappy and I had to pay more. The heating guy had run the ducts under the toilet and other fixtures. Now when I build I have all the trades people come about the same time for an estimate or bid. I then have them get each others phone numbers and tell them to communicate with each other on areas of concern.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Its great when we each think of what the next guy needs to do but I also build houses and restore them so Im not just a concrete guy. Thanks for sharing.
@buelowexcavating
@buelowexcavating 2 жыл бұрын
You are not "just a concrete guy". You are "The Concrete Guy".
@genefogarty5395
@genefogarty5395 Жыл бұрын
@@bondobuilt386 Too bad you're not closer to Little Falls, I'd ask you for a job, lol.
@jenniferhaasch7961
@jenniferhaasch7961 2 жыл бұрын
Rap the bottom of the posts with felt, Looks great!
@davidrobins4025
@davidrobins4025 2 жыл бұрын
Nice job on this pour. You have a good team who knows what they are doing. I missed hearing the "bleeps" where they should have been.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks David. I'll try better on the bleeps lol
@pjfan173
@pjfan173 Жыл бұрын
I’ve just decided to build a 40x60 poll barn. It’s awesome that guys like you have posted all these videos, so a newbie like me can see the process. Do you have any suggestions on how to find the cement crew like yours?
@davidpristas3988
@davidpristas3988 2 жыл бұрын
I've done it like that before makes life easier to finish
@bondobuilt386
@bondobuilt386 2 жыл бұрын
It sure does David.
@mitchborders8465
@mitchborders8465 2 жыл бұрын
great video bondo
@settimodifresco4302
@settimodifresco4302 Жыл бұрын
good work.
@royyazzie6028
@royyazzie6028 Жыл бұрын
Got too have a good crew to get things done 👍👏
@andersandersen232
@andersandersen232 2 жыл бұрын
this is the right way to do it. so many benefits.👍
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Andy. How are you my friend?
@andersandersen232
@andersandersen232 2 жыл бұрын
I am doing good. 👍
@davebeck3135
@davebeck3135 2 жыл бұрын
Nice job Bondo
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Dave
@richardstockwell9637
@richardstockwell9637 2 жыл бұрын
The last 3 barns we did they came out of the ground with pressure treated about 6 foot and then we poured the floor then after they built the building using a staggered joint and using ruff cut lumber from there up saved us time and them money on 20 foot pt 6x6 the builder sed it was easier to work on a concrete then dirt
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ill bet it was way easier for the builder.
@jamesrussell6870
@jamesrussell6870 2 жыл бұрын
Done playing this game!! Pour the slab 1st & then build of it. Better for everyone!!
@elbuggo
@elbuggo 2 жыл бұрын
Self evident, actually.
@SegoMan
@SegoMan Жыл бұрын
Depending on the county you may be taxed differently, around her it shed inspection prior to floor poor
@polarman1119
@polarman1119 Жыл бұрын
Nice !!!! Commentary reminds of Red Green...
@bryanspriggs4290
@bryanspriggs4290 2 жыл бұрын
Love the quick pitch handle on the power trowel
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yes that's a game changer
@jackwillie2729
@jackwillie2729 2 жыл бұрын
@@bondobuilt386 left the concrete work 35 yrs ago, was 32 yrs old and that quick pitch handle has to be sweet, almost 70 but when things go wrong a good concrete team is what you need to turn things around and get a good job ...
@bondobuilt386
@bondobuilt386 2 жыл бұрын
@@jackwillie2729 thanks Jack. We do have some sweet tools to make life easier then when you did it I'm sure it was harder back then. I know it was for me and I'm 51. Lol 😂
@brettblack7049
@brettblack7049 2 жыл бұрын
@@bondobuilt386 harder, that's right as its still back breaking work, and that coming from a guy who like hard physical labor(I'm 51 also :). Hope to pour my 32x48 with two 12x48 lean to's in the spring. I also plan to pour with the siding off so I can get right into the lean to's. The main unfortunately will be a bit more work because I only have 12' sidewalls, maybe your culvert trick, or maybe farm it out, we'll see. I've considered pouring the main in 3 sections 10.5' on the outside and then 11' in the middle, doing it in three separate pours as I'm not a concrete guy and don't have a lot of help. Any thoughts appreciated 😃. Have a great week.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
@@brettblack7049 Hi there is nothing wrong with breaking a slab down into sizes that you can handle. I still do that if I can't get enough help.
@tom1966mac
@tom1966mac 2 жыл бұрын
We have done exactly that way with pole barns
@slevinkolebra
@slevinkolebra 2 жыл бұрын
Nice
@scottbigger1945
@scottbigger1945 Жыл бұрын
That bull floater is a potty mouth . Looks real professional in front of customers
@khavafis
@khavafis Жыл бұрын
You just answered the question on my mind: how is it that the wire mesh is sitting on the foam insulation? I guess is a good trade off.
@buelowexcavating
@buelowexcavating 2 жыл бұрын
I wish I could cancel the rain :) Good information as always. My wife even watched it! I could never understand why you needed insulation under the in floor heat. Doesn't heat rise? Two new houses were built near each other by the same home owner. The first one had 2" of foam under the slab, he lived in it for a few years and sold it. He tracked his expenses very well. The second one he built was with no insulation under the slab, other than that the two houses were the same. His heating bills were within a very few dollars of each other on the two houses. He said he didn't need insulation under the slab on the second house was that it was a well drained soil. If the soil is not well drained the moisture under the slab can conduct or carry the heat away, Most of the houses we do have 8" of radon rock with draintile under the slab, so a person could save on the insulation.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks for the comments John. I am not sure I would skip the insulation because like you said the moisture would suck the heat out. It is actually code here in New York to insulate under the concrete but we get real cold winters similar to Maine or Michigan. Well draining soil is always a nice thing no matter what.
@Boscovius
@Boscovius 2 жыл бұрын
Sand behaves as an insulator. If this was a dry, sandy soil I could see how foam wouldn't make that much of a difference. However, the wet clay in my area acts like a heatsink.
@MrMarkar1959
@MrMarkar1959 2 жыл бұрын
👍🏼 as long as the builders know the weight limit because fork lift/manlift is needed inside for running conduit and lighting and bummer to crack a line. while back i helped build 60x100 and office space was in floor heating. drive anything industrial hvy duty and look for water leaks.👍🏼 Good Luck
@thomascoyne157
@thomascoyne157 Жыл бұрын
Good way of doing it 👍👍👍🇬🇧uk
@tcb069
@tcb069 2 жыл бұрын
hey bondo , on that job would be cool to show the different heights with the lazor to show the slope after you were done, just an idea , good looking floor by the way
@bondobuilt386
@bondobuilt386 2 жыл бұрын
I will try and do that next time. Good idea.
@tcb069
@tcb069 2 жыл бұрын
thanks
@francoisbouvier7861
@francoisbouvier7861 2 жыл бұрын
Didn't notice, do you use float blades at the beginning?
@williamcastleberry7338
@williamcastleberry7338 Жыл бұрын
If you didn't have a pump, what was the hose hooked to when you were pouring the right side of the building.
@michaelmcclurg9698
@michaelmcclurg9698 2 жыл бұрын
Unfortunately that wire mesh needs to be up in the pour not at the bottom. The mesh at the bottom is a waste of money.
@RDJim
@RDJim 2 жыл бұрын
Did you still use a metal mesh under the tubing there?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yes Jim we did just to hold it
@SegoMan
@SegoMan Жыл бұрын
Some counties require the barn to be finished & inspected prior to the floor pour or it will be taxed differently.
@markhowes126
@markhowes126 2 жыл бұрын
Nice to see pros pour concrete a little stiffer than normal. Seems like too many pour it self leveling I always question how that effects strength. Where in. Ny are you? Been nice if he had left lowest purlin off. Cost with out concrete?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Thanks Mark. We like to pour a 5" slump usually. We are in Mexico New York. 45 min north of Syracuse.
@craigclemson9642
@craigclemson9642 2 жыл бұрын
Where do you buy your buy your pex pipe getting ready to build 40 x 60 building thanks mike
@FactFinderer
@FactFinderer 2 жыл бұрын
You can remove standing water with a shop vac way faster than with a leaf blower... LOL
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ya there was no power there at the building sight. Lol
@ryancap1188
@ryancap1188 3 ай бұрын
Not one stop was the mex pulled up 😂😅
@rubengonzsles3585
@rubengonzsles3585 8 ай бұрын
We use a floating pan first then hit it with the blades but that machine looks a little small for that job
@duanewessie7374
@duanewessie7374 Жыл бұрын
Who do you guys use for concrete out where you were at?
@micmike
@micmike Жыл бұрын
What time did it take to pour and surface?
@exotictones1054
@exotictones1054 Жыл бұрын
It's the only way we ever did concrete.most of the time as soon as the poles were set before the roof we poured. Just after headers n lower boards were on so nothing moved.
@publicwatchdog2489
@publicwatchdog2489 Жыл бұрын
It’s been my experience to pour the slab first then build the structure.
@jwjco
@jwjco Жыл бұрын
No steel reinforcement used ?
@alexanderfarah4868
@alexanderfarah4868 Жыл бұрын
Bondo, do you pull up the rebar/mesh/tubing while pouring? I am setting up to do a 4' slab with radiant heat, if i pull up the mesh I am afraid of cutting the joints and hitting a water line.
@markcarpenter6837
@markcarpenter6837 Жыл бұрын
Staple the tubing directly to the foam with a foam stapler. Place the mesh or rebar above.
@cmiller8006
@cmiller8006 2 жыл бұрын
so was this pad without insulation board? I'm trying to make a case to myself not to do the insulation under the slab.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
No this has 1-1/2" of closed cell spray foam under it. Do yourself a favor and do not skip the foam and do not use some tarp product that claims to work. You will spend a fortune to heat your building and it will not be worth doing the tubing at all. You need closed cell foam board or spray foam under there.
@John-tq4bf
@John-tq4bf Жыл бұрын
Hi Ron. Do you have any issues with pouring concrete over a spray on insulation base. I heard once of a builder whose only complaint was it made it hard to estimate quantity which I thought was a poor excuse as it really didn't look all that bad.
@mikehess8116
@mikehess8116 2 жыл бұрын
Was the mesh on chairs to hold it up?
@kylepieschl456
@kylepieschl456 2 жыл бұрын
I was wondering the same thing. Mesh will do little good laying in the sand.
@stevesullivan2432
@stevesullivan2432 Жыл бұрын
Hey guys, nice job on the floor. Are you trolling with float blades for your final pass?
@bondobuilt386
@bondobuilt386 Жыл бұрын
We used what's called combo blades for the entire floor and the last pass.
@stevesullivan2432
@stevesullivan2432 Жыл бұрын
@@bondobuilt386 ok I gotcha. I have two machines one with float blades, the other finish blades. You've got a great crew and yourself as and owner speaks volumes. Great job
@bondobuilt386
@bondobuilt386 Жыл бұрын
@@stevesullivan2432 Thanks bud.
@scottmaass4329
@scottmaass4329 2 жыл бұрын
As the floor continues to cure…the pattern will shrink little bit into the floor so in like a week it will look even better. IMO
@jimnorthern9587
@jimnorthern9587 Жыл бұрын
been at it about 40 years worth of pouring. never did a barn with sides on it unless we had a pump. front load trucks only. rarely ever used the float on a floor. to much downtime waiting for the set. get on it with a couple guys knowing what they're doing, and out there in a couple hours after the pour. not waiting a couple hours set time to get on it. not bragging, we put down 900 yrds in one pour with 6 guys. 4" floor, commercial structure with hand finish......8 hours total time. came back on the job 2 days later and cut it by code.
@metalrooves3651
@metalrooves3651 Жыл бұрын
what was the difference again? no rebar?
@mattderr1013
@mattderr1013 2 жыл бұрын
Hey Ron how long did you make each run of the radiant heat runs
@bondobuilt386
@bondobuilt386 2 жыл бұрын
I think these were 400 feet. Some say stay under 300 but we have been doing up to 500 with no issues.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
kzbin.info/www/bejne/g5ike6CXnZWUpK8 watch this video bud.
@h2s142
@h2s142 6 ай бұрын
How thick is the insulation under the slab and how deep is it around the perimeter
@bondobuilt386
@bondobuilt386 6 ай бұрын
its all 1-1/2 to 2" thick of closed cell spray foam. The entire slab is 5-1/2" to 6" thick.
@kylepieschl456
@kylepieschl456 2 жыл бұрын
The wire mesh should at least be pulled up with hooks as the concrete is poured. Properly placed wire mesh holds a slab of dried concrete together, even if the ground underneath settles slightly. Fiberglass strands mainly help keep cracking to a minimum the first few hours of the concrete changing from liquid form to a hard state. After that the fiberglass provides little value in the strength of cured concrete. Also a lot will have to do with how heavy of equipment will be run on the concrete. I did mine with 1/2 inch rebar crisscrossed on 2 ft. centers set on chairs, then wire mesh on top of that with a 7 inch thick pour. Probably overkill on my part but hey!
@chestercalloway3812
@chestercalloway3812 2 жыл бұрын
Oh boy it’s the internet hook patrol again
@gregtaylor8327
@gregtaylor8327 2 жыл бұрын
@@chestercalloway3812 There is no point to mesh if you dont chair or pull it up. Hes just making a valid point. One of my constant arse aches was my placers not caring enough to pull mesh up.
@hankclingingsmith8707
@hankclingingsmith8707 2 жыл бұрын
WIRE MESH DOES VERY LITTLE TO HELP CONCRETE. CERTAINLY DOES NOT PREVENT CRACKS. REBAR DOES NOT KEEP ALL CRACKS OUT, BUT PROVIDE A STRUCTUALLY SUPERIOR SLAB THAT WILL STAY TOGETHER. ALSO THE USE OF CHAIRS IS A MUST. THERE IS A REASON AN ENGINEER, BUILDING INSPECTORS SPECIFICALLY SPECIFY THIS ON PLANS. IT IS THE BEST WAY.
@gregtaylor8327
@gregtaylor8327 2 жыл бұрын
@@hankclingingsmith8707 Mesh is absolutely essential if your driving on the Concrete.
@williamrogers4290
@williamrogers4290 Жыл бұрын
@@gregtaylor8327 You can pull the mesh all you want. It won't stay within the bottom 1/3 of the slab unless it it chaired. I will offer to core the slab and bet that the mesh is directly on top of the insulation.
@AndyFromm
@AndyFromm 2 жыл бұрын
Left the steel off for the pour
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ya it was nice.
@AndyFromm
@AndyFromm 2 жыл бұрын
@@bondobuilt386 I bet!
@BobBob-lz3li
@BobBob-lz3li 2 жыл бұрын
You know mike is a concrete guy with his cooler of "pepsi"
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yes he is. LMAO
@Guide504
@Guide504 2 жыл бұрын
The mesh is at the bottom with no undercover, sould be around 50mm in the slab.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
I explained this.
@gjones5153
@gjones5153 2 жыл бұрын
Mesh is only there to hold the tubing in place. They used fiber in the cement
@darby5877
@darby5877 2 жыл бұрын
What kind of fiberglass fibers did you use?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
They were micro fibers
@darby5877
@darby5877 2 жыл бұрын
@@bondobuilt386 I'm developing recycled fiberglass strands about 3/4 inch long
@Boscovius
@Boscovius 2 жыл бұрын
I don't really understand what good the wire mesh will have if it isn't embedded closer to the center of the slab.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
It is there in this application to hold the tubing in place and keep it from floating up and becoming damaged. We used fibers for reinforcement in these radiant slabs.
@bobbygene8274
@bobbygene8274 4 ай бұрын
You didn't pull up the reinforcing wire? Why.
@bondobuilt386
@bondobuilt386 4 ай бұрын
Because it is just to hold the tubing down. The tubing will get damaged if you pull it up. We put fibers in for reinforcement.
@scottmaass4329
@scottmaass4329 2 жыл бұрын
Also nice job of stopping just right with power trowles. Alot of guys go alittle too far
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ya it can get slick real fast if you don't know when to stop.
@registrationhater
@registrationhater 2 жыл бұрын
No steel??
@tabranch3165
@tabranch3165 Жыл бұрын
🙋🏼‍♂️ who is pulling up the wire mesh ?
@normhowes2975
@normhowes2975 2 жыл бұрын
If l can ever afford a man cave this size I'll give you a call since your in my Palermo area.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Ok Sounds good neighbor. Awesome.
@NSResponder
@NSResponder Жыл бұрын
I've seen foundations and floors for pole barns poured before any framing was done at all. Nothing at all in the way for the concrete pour, tubing in place, and brackets for the poles placed wet.
@farmalmta
@farmalmta Жыл бұрын
Just make sure all the load on the floor during subsequent construction doesn't exceed the strength of the concrete, and that tire tracks and flaws in the floor aren't going to be an issue. Never seen a floor put down first that doesn't look grimy and rough by the time everybody is through dropping stuff and wheeling/skidding their equipment and materials around on the new not-fully-hardened concrete.
@markcarpenter6837
@markcarpenter6837 Жыл бұрын
How far down is the drain set?
@bondobuilt386
@bondobuilt386 Жыл бұрын
you want like 1-1/2" to 2" pitch to top of drain grate.
@GRUBB-MUDD
@GRUBB-MUDD 2 жыл бұрын
Nice shirt, *TRUST ME I KNOW* 20 FOOT BOARD WILL MAKE A MAN OUT OF U! HE CAN KEEP THAT STICK, IM GOOD W THE 16 _LOL_ great idea though! I've used em just don't like em!
@GRUBB-MUDD
@GRUBB-MUDD 2 жыл бұрын
Idk, maybe the (I almost said pump but u use that truck all the time) 20 foot stick is different , ohh yeah getting to pour b4 metal make it easy! Do u own that buggy?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
@@GRUBB-MUDD That 20 foot screed is a bear. LOL
@gregquick1542
@gregquick1542 2 жыл бұрын
We use Zip Strips for crack control in all our floors. Done in one day . That way you can pull mesh.
@bondobuilt386
@bondobuilt386 2 жыл бұрын
I tried them once but didn't like them. I should try them again some time.
@farmalmta
@farmalmta Жыл бұрын
@@bondobuilt386 They're easier to work with when you use a higher slump. For your 5" slump pours, they're a bit tough to set easily.
@bondobuilt386
@bondobuilt386 Жыл бұрын
@@farmalmta thanks. you run super Plastisizer in your wetter pours?
@cafox4275
@cafox4275 2 жыл бұрын
You said you recommend flooding it, what's the reasoning for that?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Concrete will be stronger if wet cured.
@iammattjones
@iammattjones 6 ай бұрын
I you gotta get these videos uploaded in 1080p or 4k.
@db8sell
@db8sell 3 ай бұрын
what is the price for a pour like this?
@stevensnyder5332
@stevensnyder5332 2 жыл бұрын
Bondo, I wonder the cost of such a nice floor. I am considering a floor for my barn.
@davidehrhardt2169
@davidehrhardt2169 2 жыл бұрын
Why use mesh if it’s just going to lay on the bottom
@intencityfan
@intencityfan 5 ай бұрын
what would be a ball park estimate cost for this? is it like 20 grand? ?
@bondobuilt386
@bondobuilt386 5 ай бұрын
Your probably not far off
@metalrooves3651
@metalrooves3651 Жыл бұрын
super pour..im jealous.except for you guys talking funny like youre from another country,its all good! we Missourians dont sound like this
@deweysanders1461
@deweysanders1461 3 ай бұрын
How expensive. Looks like a really thick slab
@jimanderson4495
@jimanderson4495 2 жыл бұрын
Bondo…. I told my wife that I wanted to be cremated. She made an appointment for next Tuesday! Looks good. Another Quality Bondo Production. Did you get a n power trowel?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yup got a new one uncle Jim. That's funny about your wife. Lmao 🤣
@concreteislife9411
@concreteislife9411 Жыл бұрын
Try spraying WD40 all over your trowels before you start that way it cleans Easyer and your finish had a lot of cat eyes in it, stand your blade up more and keep trowel till it shines unless they didn’t want a shinny finish but yes we normal have the builder leave off the metal.
@bondobuilt386
@bondobuilt386 Жыл бұрын
good tip with the WD 40 This floor was not burnt on purpose that's what the customer wanted. Chris is a profession finisher and he leaves like no cat eyes though.
@ALT_RIGHT
@ALT_RIGHT 2 жыл бұрын
6:25 the trick is NO SIDING ON BUILDING
@bondobuilt386
@bondobuilt386 2 жыл бұрын
Yup saved a lot of work.
@justatim8143
@justatim8143 Жыл бұрын
You did the floor before the walls were up. At 7:25 don't bend the shuts with your head "LOL"
@jimhendrix7776
@jimhendrix7776 2 жыл бұрын
how's type1 foam work under slab?
@bondobuilt386
@bondobuilt386 2 жыл бұрын
I am not sure what type 1 foam is. we use closed cell foam under concrete. Definitely do not want open cell foam.
@jimhendrix7776
@jimhendrix7776 2 жыл бұрын
@@bondobuilt386 esp is closed celled right? If the closed celled is rated at 10psi is that 2 little or gud?
@johnaustin9051
@johnaustin9051 Жыл бұрын
How many hours of blowing water around. Charge extra? Why no wet/dry vac? Sump pump? Bill 8 hours for a guy to hold a leaf blower......
@robertkenney-oles5948
@robertkenney-oles5948 Жыл бұрын
Put handles on the screed and save a guy. Easier and faster to have just one guy cut the floor.
@Oly6t1
@Oly6t1 Жыл бұрын
8:13 Lmfao :D
@guyod1
@guyod1 2 жыл бұрын
I need a shirt that said i dont get enough credit for doing this drunk. LoL
@vojislavdragic5090
@vojislavdragic5090 Жыл бұрын
givin sh.t to each other its what is all about:)
@bobscaduto3070
@bobscaduto3070 2 жыл бұрын
Looks like Mike's drinking a beer. Do you have insurance and workers comp???
I just can't work for angry customers. Had to quit this one!!
28:34
Bondo Built
Рет қаралды 5 МЛН
NEVER SEEN BEFORE TECHNIQUE TO BUILD STAIRS
39:13
Bondo Built
Рет қаралды 128 М.
I wish I could change THIS fast! 🤣
00:33
America's Got Talent
Рет қаралды 75 МЛН
Can teeth really be exchanged for gifts#joker #shorts
00:45
Untitled Joker
Рет қаралды 18 МЛН
Can two old men build a pole barn with NO EXPERIENCE?
55:41
Hamiltonville Farm
Рет қаралды 104 М.
Pouring a concrete floor in a pole barn
17:51
DIRT BOSS
Рет қаралды 52 М.
Pouring A Large Concrete Slab 60' X 36' (What I Charge To Install Slabs)
11:21
TIPS & TRICKS Building A POLE BARN! DIY Homestead Barn
18:34
The Crockers
Рет қаралды 63 М.
How to Build a Pole Barn | TIME LAPSE | 32x60 Pole Barn With16' Lean
9:24
Piney Grove Homestead
Рет қаралды 175 М.
How to Build a Storage Shed Slab Foundation
14:13
Odell Complete Concrete
Рет қаралды 1,5 МЛН
A cost effective slab on grade home foundation.
51:41
Bondo Built
Рет қаралды 91 М.
40x56 Large Garage Full Time-Lapse with Wrap around Porch
15:16
RR Buildings
Рет қаралды 2,1 МЛН
Customer didn't want to Pay! He Hated my Concrete Work!
16:21
Odell Complete Concrete
Рет қаралды 1,7 МЛН
How to DRY POUR CONCRETE SIDEWALK
28:01
Cajun Country Livin'
Рет қаралды 1,5 МЛН