Рет қаралды 641
ARAGON Robotics ABB robot after refurbishment in load test.
During the test, the following technical parameters are examined:
- Motor currents A1/2/3/4/5/6
- Oil temperature A1/2/3/4/5/6
- Overall temperature development of the mechanics
- Noise development
- Vibrations
- Tightness of the gears A1/2/3/4/5/6
- Gear play measurement before and after the load test
- Geometry check for each axis, complete
- TCP testing according to manufacturer specifications
This thorough testing process ensures the quality and performance of robot mechanics before they are deployed worldwide in various industries.
6-12 months Warranty after revision.
(Warranty considering the technical specifications set by the manufacturer)
More Information : info@aragon-gmbh.com
#refurbishment #vw #audi #mercedes #skoda #bmw #porsche # #daimler #roboter #robot #ronaldo