@afaquekhan2271 4 жыл бұрын
Thanks for posting. My chronic confusions related to acceptance sampling got clarified after watching this video.
@irshduck
@irshduck 2 жыл бұрын
of all videos I can click on on youtube i end up clicking on the a video of a guy from the school i went to. What are the odds? Thanks my guy! #HornUps #GoMavs
@kasturidas4081
@kasturidas4081 2 жыл бұрын
I want to know what is the significance of the given value of N here? You didn't use that value to draw OC curve right? Or it's me who missed that part somehow?
@meandnotyoudude5678
@meandnotyoudude5678 5 жыл бұрын
Thank you! Your explanation is clearly stated. Great teaching.
@airreaper1
@airreaper1 4 жыл бұрын
Excellent video!
@venkateshreddysure4236
@venkateshreddysure4236 2 жыл бұрын
Thanks a lot, professor for the video. your explanation is lucid.✌
@TheOpenEducator
@TheOpenEducator Жыл бұрын
You are welcome!
@deepshah2137
@deepshah2137 3 жыл бұрын
Hey,isnt poissons distribution is of discrete probability function? how can we give cummulative here?
@fortda2323
@fortda2323 3 жыл бұрын
Hello, I have a question that is not related to the video but is about acceptance sampling. For example we have a job order of 500,000 pieces. Does that mean the lot size is automatically 500,000 pieces as well? Or can we make five 100,000 lots? I am confused with the distinction between lots and batches... Thank you!!!
@TheOpenEducator
@TheOpenEducator 3 жыл бұрын
It depends. Job order size could be considerred as a lot size. More appropriate would be the size that has been homogeneously produced using the exact same procedure.
@fortda2323
@fortda2323 3 жыл бұрын
Thank you!!
@dra.b.zoramawa3019
@dra.b.zoramawa3019 4 жыл бұрын
Dont worry bro, the video is great, we know it is gonna be cumulative, anyways the correction is noted
@lavanyatelekonnectors6398
@lavanyatelekonnectors6398 2 жыл бұрын
Instead of '< 'symbol, > is used, Ok how did you freeze 'I3' value to something like '$1$3'. What is the step need to be done to get that.
@TheOpenEducator
@TheOpenEducator 2 жыл бұрын
F4 Key
@ICsuryaa
@ICsuryaa 2 жыл бұрын
@@TheOpenEducator Even pressed F4key i couldn't get $I$3 ....any other option?
@TheOpenEducator
@TheOpenEducator 2 жыл бұрын
@@ICsuryaa If the F4 Key does not work, you will have to manually type the dollar sign, $.
@ICsuryaa
@ICsuryaa 2 жыл бұрын
@@TheOpenEducator yes i did the same...thank u
@samuelputrab.2635
@samuelputrab.2635 4 жыл бұрын
Thanks a lot, much appreciated.
@mariomoctezuma8071
@mariomoctezuma8071 3 жыл бұрын
Thanks man
@TheOpenEducator
@TheOpenEducator 3 жыл бұрын
You're welcome!
@montagecrazy4u
@montagecrazy4u 7 ай бұрын
Msu huh. Same
@TheOpenEducator
@TheOpenEducator 7 ай бұрын
You will find more here: www.theopeneducator.com/
@strongest324
@strongest324 4 жыл бұрын
lanjapoka
Acceptance Sampling Operating Characteristics Curve Double Sampling Plan
26:09
Interpreting OC Curves
7:01
Helen Joyner
Рет қаралды 15 М.
黑天使只对C罗有感觉#short #angel #clown
00:39
Super Beauty team
Рет қаралды 33 МЛН
Creative Justice at the Checkout: Bananas and Eggs Showdown #shorts
00:18
Fabiosa Best Lifehacks
Рет қаралды 35 МЛН
Attribute Control p chart MS Excel
7:20
The Open Educator
Рет қаралды 55 М.
Normality Test Probability Plot PP using MS Excel and Minitab
11:21
The Open Educator
Рет қаралды 62 М.
Acceptance Sampling and ANSI Z1.4 Sampling Procedure Explained
12:41
Average Outgoing Quality AOQ using Excel
6:35
The Open Educator
Рет қаралды 13 М.
ROC Curve and AUC Value
7:17
DATAtab
Рет қаралды 56 М.
AQL Inspections: Understanding Operating Characteristics Curves
8:08
Quality Inspection
Рет қаралды 36 М.
07 Acceptance Sampling
13:29
ProfThacker
Рет қаралды 36 М.
Quality (Part 1: Statistical Process Control)
11:43
Infinity MFG
Рет қаралды 247 М.
黑天使只对C罗有感觉#short #angel #clown
00:39
Super Beauty team
Рет қаралды 33 МЛН