Рет қаралды 15,285
Advanced scaffolding training how to build Layher allround cantilever hanging scaffold construction.
NOTE
Diagonal braces should be fitted whenever possible to the outside.
This supports the use of horizontal advance guardrails and makes
assembly of the work level easier. The risk of inadvertent knocking
out of the wedge is also reduced.
Verify in each case that the scaffolding structure has sufficient
load-bearing capacity. If necessary, the main scaffolding must be
ballasted and constructed pull-resistant. Information on the load-bearing capacity of vertical diagonal braces can be found in the Allround
approvals or in Layher Allround technical brochure. Fitting of multiple-bay
projections is possible. Projections require sufficiently stable main scaffolding. Only fit and remove scaffolding decks from a secured position.