Рет қаралды 13,766
Auxiliary Pressure Reducing and Desuperheating Station.
( This scheme is similar for 200/210/250/270/300/500 MW BHEL units, parameters may be different )
Introduction of PRDS
System Description
Parameters of PRDS
Services of PRDS
Real plant DCS scheme for 200 MW unit.
Use of auxiliary steam in a large thermal power plant.
Visit to Power Plant Gyan Blog:-
power-plant-gya...
t.me/powerplan...
Thanks
POWER PLANT GYAN