hi sir, what is the procedure to make BOX design in front elevation if block work or slab is not extended during civil work?
@Usernotavailable33-j4u8 ай бұрын
hame PCC nahi malum, PCC yani samosa😊👍👌
@hellboy61678 ай бұрын
Nicely explained
@Invincible13328 ай бұрын
Wrong practices highlighted 👍 keep it up
@gauravbhardwaj71868 ай бұрын
Plaster mein ratio ka rakhyein
@SRICHARANSANAPATHI4 ай бұрын
Sir can we change our elevation our slab is ready but it's just a normal slab ..can we make elevations which require additional extension of already prepared slab ??? Please answer my question I want to talk to you please give me your contact details....
@sumilonghosh52262 ай бұрын
Are you a civil engineer? Why minimum dia of bar in foundation should be 12 mm.? Please justify all yor comments in terms of BIS 456 2000. Contractor should strictly follow the reinforcement drawing prepare ed by civil engineer. All stages are to be inspected by a civil engineer.