Assembly Line Balancing English

  Рет қаралды 105,229

AdiTV

AdiTV

Күн бұрын

Пікірлер: 37
@niharikarini2045
@niharikarini2045 Жыл бұрын
I understood this very well after watching your video,,,thank u very much
@shresthadatta8653
@shresthadatta8653 9 ай бұрын
Thank you so much for the video it helped me a lot ❤ kudos to you keep it up!!!!❤
@AbdullahKhan-zz3bt
@AbdullahKhan-zz3bt Жыл бұрын
great teaching bro
@BergielVillocino
@BergielVillocino Ай бұрын
Does processing time means the time needed to produce an intermediate product or time needed to produce a finished goods, acounting recovery and losses?
@chriswiddajonathan8941
@chriswiddajonathan8941 Жыл бұрын
daghang salamat = terimah kasih many thanks from philippines, professor! you helped me out with my thesis. you're awesome, sir!!!
@vishwajayasundara1811
@vishwajayasundara1811 7 ай бұрын
crystal clear❤
@AJ-et3vf
@AJ-et3vf Жыл бұрын
great video. thank you
@TheSahilShinde
@TheSahilShinde 11 ай бұрын
Amazing!
@hamdankamil955
@hamdankamil955 3 жыл бұрын
Sangat membantu, thanks a lot!
@msyahrulhanafi6928
@msyahrulhanafi6928 2 ай бұрын
Thank you dude
@Cncjdlaj
@Cncjdlaj Ай бұрын
Thanks, boss.
@Education-nz9fn
@Education-nz9fn 2 жыл бұрын
Why u were cutting the 90 sec of idle time ?and how did u get 30 idle time for F?
@hillkadomena5357
@hillkadomena5357 Жыл бұрын
God bless you greatly
@peacevlogs8254
@peacevlogs8254 4 ай бұрын
120 units in a 40 hour - week How to calculate this?
@emutairemichael3624
@emutairemichael3624 7 ай бұрын
Thanks🎗
@chuaquan827
@chuaquan827 3 жыл бұрын
Can I ask let think in reality. The first product will need 400 seconds cuz each station needed waiting for the precedent ones to start working. From the 2nd product, every 100 seconds there will be a product go out of the assembly line. Therefore, we cannot meet the desired output per day (Cuz 400 seconds instead of 100 seconds for the first product each day). Am I wrong?
@abdihassan8536
@abdihassan8536 2 жыл бұрын
thank you brother
@jerinjoseph9120
@jerinjoseph9120 5 жыл бұрын
if a process is having both machine and man time combined for example process A is having man time 5 sec and machine time 15 sec in total 20 secs , man will be waiting for the 15 sec for next process
@AdiTV-r5o
@AdiTV-r5o 5 жыл бұрын
yes, because the man could only waits when he/she are idle or not operated
@ZeoGarcia
@ZeoGarcia Жыл бұрын
thank you
@knowledgecentre2907
@knowledgecentre2907 4 жыл бұрын
nice explanation
@alin8387
@alin8387 5 жыл бұрын
Hi, this video helped me a lot. Question, is there anytime when none of them are eligible? like say for instance, B was not eligible in station 2? is this possible?
@AdiTV-r5o
@AdiTV-r5o 5 жыл бұрын
do you mean, "is that possible that non of the processes that doesn't have any Predecessor?" In short, there will be one or two or even more processes that shouldn't have any predecessor while the rest of them are had it. It all depends on the case
@alin8387
@alin8387 5 жыл бұрын
@@AdiTV-r5o Thanks for your reply. I actually meant, if its possible to have a process that does have a predecessor to not have any "proses ready" or in other words a "feasible task". You know how you list the proses ready in station 2 for C. C has a proses ready of B and the only feasible task is B, what if B was not possible? Does this ever occur that there is no feasible task? I hope i explained myself good enough. Thanks for your help.
@AdiTV-r5o
@AdiTV-r5o 5 жыл бұрын
​@@alin8387 If there are no feasible task, then if you learnt from "Project Management" course, that particular task/stasion (or whatever you want to call it) which has no feasible task, may occur on some condition. But in term of production planning and inventory control (PPIC), such case is rarely happened because what we try to find out here is the assembly line which is consider as the main process. so if theres any process/step which has no feasible task, wouldn't be count in this term. it depends on what are you going to do from such case. Well I'll make it easy.. the case that you've been asking, are happening in real situation, but depends on what are you trying to observe, it may be count or not.
@vaibhavkhairnar142
@vaibhavkhairnar142 Жыл бұрын
Txn sir
@lightofheaven4381
@lightofheaven4381 3 жыл бұрын
Hi this video helped me a lot I just want to ask questions Is it necessary to start letter "A" as ther first task by the first station or is it dependent on what letter has the longest process time? Thank you
@TheSahilShinde
@TheSahilShinde 11 ай бұрын
First you have to start with the processes who doesn't have predecessor (here it is A and B), if there are multiple such processes, then choose the one with the highest process time ( here we have selected A) and then keep going.
@hayabusa9954
@hayabusa9954 4 жыл бұрын
Good explanation
@youthrevivalforchrist4922
@youthrevivalforchrist4922 5 жыл бұрын
very informative. thank you :)
@shofiyyah23
@shofiyyah23 3 жыл бұрын
36000? bukan 3600?
@anandrajak3829
@anandrajak3829 5 жыл бұрын
Why workstation is total have taken 4
@AdiTV-r5o
@AdiTV-r5o 5 жыл бұрын
it's on the 3rd step, you must determine it by dividing the process time with cycle time. its on 05:36
@NusratJahan-mr5rb
@NusratJahan-mr5rb 3 жыл бұрын
3.9 is decimal number workstation can't be fraction that is why 4 is written
@selmaa.g4253
@selmaa.g4253 4 жыл бұрын
Nice , I need ur social media accounts?
@adityadixit5445
@adityadixit5445 Жыл бұрын
open na noor
@gulammahmood2494
@gulammahmood2494 Жыл бұрын
are you getting it what are you saying... plzz do try something else i m sure this is not your area of interest.
The 7 Quality Control (QC) Tools Explained with an Example!
16:04
CQE Academy
Рет қаралды 672 М.
What Linear Algebra Is - Topic 1 of Machine Learning Foundations
24:04
MAGIC TIME ​⁠@Whoispelagheya
00:28
MasomkaMagic
Рет қаралды 36 МЛН
黑的奸计得逞 #古风
00:24
Black and white double fury
Рет қаралды 30 МЛН
Modified Product Layout and Assembly Line Balancing Example
11:35
Ramesh Soni
Рет қаралды 251 М.
How to do Line balancing in product Layouts
11:57
Karpagam QT corner
Рет қаралды 111 М.
Line Balancing Example
16:09
Max Learning
Рет қаралды 153 М.
Line Balancing Example 2
15:36
Max Learning
Рет қаралды 55 М.
How to rightsize the right way with line balancing
4:30
RTDKNOWLEDGE - MBA LESSONS IN BITS AND BITES
Рет қаралды 11 М.
Takt Time, Cycle Time, Lead Time
13:50
OpsExcellence
Рет қаралды 611 М.
Line Balancing: Practical example in a Learning Factory
6:57
Network of Innovative Learning Factories
Рет қаралды 44 М.
How to design a Lean Layout/Obeyaka? The Lean Manufacturing Guide
15:21
This Single Rule Underpins All Of Physics
32:44
Veritasium
Рет қаралды 3,9 МЛН