Ap ne dc k bary main btaya is ki details bta dain kaisy is ko Dc k liye use kiya jata hai please
@xaheerx3 ай бұрын
I want to install a timer ats for shifting my green meter load (hybrid) to single phase during peak hours. Please recommend a setup.
@AhsanAli-si4nl4 ай бұрын
Very good explanation ❤❤❤
@ShahidKhanAbutalha3 ай бұрын
Ap ne adha waqat to ATS ke bilwaja details main lag diya
@aithshamqayyum77146 ай бұрын
Which ats should installed at mppy simtak 100A hybrid and ongrid solis 10 Kw when grid automatically tranfer at mppt
@superaak4 ай бұрын
Kindly share link for alternation for timer
@anasmajeed29589 ай бұрын
Aap in dono mein sy konsa recommend krty ho quality wise??
@noman007715 ай бұрын
For more safety use breaker type and its also have off option lekin switching time pr light band hogi. For fast switching use right side ats with red knob. It switches very fast light band ni hoti. Lekin es ke coils safe rakhne ke liye alag se voltage protector bi lagana pre ga jesa video me btaya gya hai.