Why don't they use shunting diesel locos and gantry cranes?
@killerkrabbe1533 жыл бұрын
sehe ich das richtig das die dort die Containerentladung unter dem spannungsführendem Fahrdraht durchführen ?` Oder wird die Oberleitung für die Dauer der Arbeiten stromlos geschaltet und geerdet ? Do I see that correctly that they are carrying out the container unloading under the live contact wire? ' Or is the overhead line switched off and grounded for the duration of the work?
@Timmi93033 жыл бұрын
@@sa2ma77nm Working under live wire is not hardship, it's a deathwish ( I work on trains and know the dangers well. ) I would not go near a live wire much less working under it. There is a green flashing light on a pole further back that goes active a while after the train has been split and driven off. I'm guessing that light tells that the overhead wire is switched off and grounded.