Рет қаралды 2,304
Base Post Cantilever:
The MDCL is applied multiple times verifying that, after the initial settlement, the initial position is always restored when the load is removed.
After a load cycle to the SCL, the tip is off by more than 2 mm and significant residual stress is observed in the material, however the ultimate strength is respected.