This is really great information, and a great overview. A an overview of how to properly select a specific bill of material for an MTO product, assuming there are multiple.
@omarisawesome3656 ай бұрын
Awesome❤, Could you share more content like this?
@ShardCollector23 күн бұрын
5:15 we can see the BOM and afterwards there are also the operations. But is there any way to link which operations consume each BOM line? For example, the purple dye isn't needed in the first operation but only in the second one. And there can be a day or two in between those.
@javedshakir51566 ай бұрын
Awesome presentation, but my question here is that when add our labour cost in manufacturing model with machine time run cost, how odoo calculates them and then how it works with the accounting model???