Рет қаралды 12,981
In this new series of videos you are going to learn about leveraging BIM Model for creating a Primavera P6 Baseline schedule and Resources loaded schedule.
In the changing construction industry making use of such software for better and quality schedule has become very important. Schedules can be planned more accurately and communicated exactly, and the improved coordination helps projects be more likely to be completed on-time or early.
Traditionally, quantity take-offs and estimates have been performed and developed with 2-D drawings supplied by the architect to the general contractor (GC). However, in recent years, the construction industry has seen a shift toward Building Information Modeling (BIM)
Make sure you watch entire series to become amazing planning engineer
------------
To download this video course series for free or if you would like me to answer any of question please email us at contactzerofloat@gmail.com
-------------
Zero Float
How to create a baseline schedule in Primavera P6.
Create a working schedule in primavera p6.
Primavera P6 Basics
Primavera P6 Advance
Free Primavera p6 Online tutorial
Revit Basic
Revit Advance
----------
Music By:
Lights by Sappheiros / sappheirosmusic
Creative Commons - Attribution 3.0 Unported - CC BY 3.0
creativecommons....
Music promoted by Audio Library • Lights - Sappheiros (N...