Рет қаралды 18,211
The long awaited Alstom Innovia APM 300 C801B, the third generation LRT Train for the Bukit Panjang LRT has finally arrived in Singapore and has been lifted up to the tracks for testing to commence!
I'm pleased to collaborate with Transport Cinematic for this video, and make this short music video with footage he captured of the LRT train being lifted up. Do check out his channel here: / transportcinematic
The Alstom Innovia APM 300 (C801B) is a rubber-tyred automated people mover (APM) train to be introduced on the Bukit Panjang LRT (BPLRT). These third-generation light rail vehicles are capable of operating in single and double car formations, and were initially slated to enter service in 2021.
The procurement of these trains forms part of a wider overhaul of the Bukit Panjang LRT network. Under a S$344 million contract awarded to Bombardier in 2018, the Original Equipment Manufacturer (OEM) would carry out a CBTC resignalling upgrade, refit second-generation C801A trains with CBTC, upgrade existing power rails, and supply 19 new trains which are slated to replace first-generation C801 trains which have been in service since 1999.
Trains can be formed of either one car, or two cars coupled together. Every car is identified by a three-digit number, from 133 to 151. All vehicles are built by CRRC Puzhen Bombardier Transportation Systems Co., Ltd. at their Wuhu Plant.
For more information, please visit landtransportg...
Become a member to get access to perks:
/ @glitchfan2428
Track: Andromedik & Used - Take Me [NCS Release]
Music provided by NoCopyrightSounds.
Watch: • Andromedik & Used - Ta...
Free Download / Stream: ncs.io/TakeMe
All footage filmed by Transport Cinematic and edited by Maxson Goh aka glitchFan2428
No unauthorised use or duplication of the video is allowed.
Thanks for Watching and Please Leave a Like and Subscribe if you enjoyed the video :)