Рет қаралды 71,582
👉🏻Subscribe: kzbin.info_c...
👉🏻Follow us on Facebook: / maquinista3029oficial
Welcome to this channel and the first video produced in 2020, today we will accompany the escape crew to make a dangerous delivery of 6 loaded tanks destined for the Santa Lucia oil company located 3km north from station.
Because the delivery is in a factory equipped with only one way, it is impossible to turn or surround the locomotive so it must leave the same as I enter, that is the reason why they leave with the tanks loaded in front of the locomotive, where the butler and the garrotero give directions to the driver for the movement of the train, however they are totally exposed to the front of the cars.
After approaching the industrial colony, the train must stop to align a deviation towards a spur of a single direction in poor conditions, so to maintain safety in this spur the train must go at a speed not exceeding 5km / h in the only Morelia street running section.
Upon reaching the factory, the train must first enter and hook the empty boxes to remove and remove them, then with the power of the EMD GP38-2 locomotive (KCSM 2078) they will push the loaded cars back into the factory. The driver must proceed with great skill since the tracks are greasy and therefore very slippery.
Once placed, unloaded and secured the loaded tanks, it only remains to leave the factory to hook the empty tanks and start the trip back to the station now with the locomotive in front of the wagons.
Enjoy this tour and the detail of these maneuvers that we have brought especially for you.
Maquinista3029 #KCSMMorelia #TrainRide #Trains