Establishing a crushing operation within the worksite of the Highway 401 expansion project was no simple task.
West Corridor Constructors (WCC) was faced with many factors to consider. Design constraints meant managing the logistics of staying within a limited workspace while safely maintaining other on-site operations. Environmental and economic considerations were paramount for a project of this scope. Delivering a cost-effective strategy for expanding a major route for commerce and commuters on the schedule was crucial. In essence, failure was not an option.
Using recycled materials offered a sustainable approach, reducing the need for virgin aggregates, trucking requirements, and greenhouse gas emissions emitted into the atmosphere. At the same time, the concept of on-site crushing preserved crucial construction schedules and costs.
WCC evaluated various techniques and manufacturers, analyzing each finite detail of the operations. Site simulated field trials in their yard allowed for the testing of different pieces of machinery and pile configurations. With a job so large, it required extensive research, development, and design. A process that took upwards of 9 months to complete.
After a comprehensive evaluation of what machines to use on the project, WCC selected Keestrack supplied by Frontline Machinery. Find out why.
Specializing in crushing, screening, grinding and shredding, and material handling and measuring equipment, Frontline provides product and service expertise to aggregate processing, material and wood recycling, biomass and pellet production, and heavy civil construction sectors in British Columbia, Alberta, Saskatchewan, Manitoba, and Ontario.
To learn more about Frontline:
Visit: www.frontline-machinery.com
Call: 1.855.625.2009
Email: info@fl-machinery.com

Пікірлер: 2
@maxjohnson8659
@maxjohnson8659 2 жыл бұрын
Should have made provisions for a transit ROW; the 100 km/h limit must be raised to 120-130; highway expansion is unnecessary when office employees can easily WFH.
@crohunter100
@crohunter100 2 жыл бұрын
that guy looks like Aladeen from the movie The Dictator
Every Construction Machine Explained in 15 Minutes
17:21
Practical Engineering
Рет қаралды 3,5 МЛН
Freeway Widening: The Gift That Keeps on Giving (More Traffic)
14:19
나랑 아빠가 아이스크림 먹을 때
00:15
진영민yeongmin
Рет қаралды 15 МЛН
Dad gives best memory keeper
01:00
Justin Flom
Рет қаралды 20 МЛН
Zombie Boy Saved My Life 💚
00:29
Alan Chikin Chow
Рет қаралды 35 МЛН
Aecon Proud - Highway 401 Expansion (Mississauga to Milton)
1:37
Electromagnetic Aircraft Launcher
15:09
Tom Stanton
Рет қаралды 975 М.
"A Typical Day on the 401" | OFFICAL MUSIC VIDEO |
3:59
Kevin Westphal (The Canuck)
Рет қаралды 48 М.
Regehr Contracting - Keestrack R6e Impact Crusher
2:00
Frontline Machinery Ltd.
Рет қаралды 3,3 М.
Dirt Roads to Freeways … And All That (ca. 1978)
7:04
ArchivesOfOntario
Рет қаралды 78 М.
Biggest Megaprojects Under Construction in 2024
20:25
MegaBuilds
Рет қаралды 1,4 МЛН
4 Myths About Construction Debunked
14:36
Practical Engineering
Рет қаралды 2,1 МЛН