Awesome video. The four Class 86's were the main highlight. :)
@kk-transport4 жыл бұрын
Can't lie, Ingatestone tends to be busier when there is rail replacement
@WillsRailAdventures4 жыл бұрын
Surely there were four 86s because the other two broke down maybe
@drstrains25744 жыл бұрын
GATRAINSPOTTING05 As per a previous comment there is one work ing to Felixstowe, but two in the opposite direction later in the day. They send four locos to save a light engine working
@MalcolmCrabbe4 жыл бұрын
Had the other two 86's failed then ?
@keirhanncallan90454 жыл бұрын
4 86s has become fairly regular on mondays due to there being one booked working towards for Felixstowe booked for them but two back from Felixstowe. Done simply to save running a pair light engine.
@drstrains25744 жыл бұрын
Keirhann Callan Thanks. I was wondering myself.
@MalcolmCrabbe4 жыл бұрын
@@keirhanncallan9045 That makes sense, one less movement for a light engine