Рет қаралды 3,259
The winning solution for job sites of short duration that require frequent operations of transport and setting up.
The machine is truly self-erecting, and can be transported in one piece/fully assembled with the rotary head and kelly bar on. Once on site, the rig is easily off loaded from the truck and set up without the need for crane service.
Range of drilling technologies. The CH 150 allows for the use of the following drilling technologies:
BP (Bored Piles) uncased bored piles, excavated by dry method or stabilized by drilling fluid;
CBP (Cased Bored Piles) bored piles with casing installation by rotary drive;
CFA (Continuous Flight Auger) piles that are drilled by the use of a continuous hollow auger stem.