Рет қаралды 59
COT3 Work Order 1 - Terminal 3 Improvements:
Bid Package 01 - Priority / Long Lead
Trade Package 1.6b: Drywall - Carpentry & Plaster (re-bid)
Trade Package 1.8c: GC Package: AA Priority Area (re-bid)
Bid Package 02 - Remaining Trades
Trade Package 2.11b: Ceilings (re-bid)
Trade Package 2.12b: Resilient Flooring & Carpet (re-bid)
Trade Package 2.15b: Painting & Intumescent Fireproofing (re-bid)
Trade Package 2.29b: Final Cleaning (re-bid)