Create S-Curve for Planned Target vs Actual Work from MS Project

  Рет қаралды 58,297

Excel Insights

Excel Insights

Күн бұрын

This video demonstrates how to create an S-Curve from MS Project to show both the Target and Actual work from a completed project.

Пікірлер: 67
@DeepakKumar-gt6tg
@DeepakKumar-gt6tg 11 ай бұрын
very informative and helped in creating S curve. Thanks for in depth explanation!
@leumntv9741
@leumntv9741 Жыл бұрын
Wow! So love this channel. Thank you very much for sharing this tutorial
@ExcelInsights
@ExcelInsights Жыл бұрын
Glad you liked it!
@HajarSaila
@HajarSaila 5 сағат бұрын
thank you for the video, I have try it but still unable to get s curve,
@Alex-z25b
@Alex-z25b Ай бұрын
Thank you for this. In my case the graph and table are balck, any help?
@dcpowered
@dcpowered 2 жыл бұрын
This is perfect! Just what i was looking for! Great explanations!
@ExcelInsights
@ExcelInsights 2 жыл бұрын
Great!
@ba177ba18
@ba177ba18 9 ай бұрын
Clear and straight to the point. Thank you. Liked and subbed
@raj7553
@raj7553 26 күн бұрын
Hello Tom... As a planner we are creating a S curve for progress report based on the cumulative work but we track the update through % complete which is duration based. Is that the right way to do?
@ExcelInsights
@ExcelInsights 26 күн бұрын
An S-curve is usually for tracking accumulation of resources. Unless what you are planning is to visualize the accumulation of days worked-- your plan may work. Otherwise, it seems like what you wre creating is a line chart that shows progress of % complete-- not accumulation.
@shaikaarifilahi8423
@shaikaarifilahi8423 2 жыл бұрын
thanks for the information, but while I am generating the s curve report (baseline cumulative work VS Cumulative actual work), I am getting values 0 in the pivot table. unable to generate the s curve. would you pls help me with that?
@jongski18
@jongski18 Жыл бұрын
You should do resource loading to your schedule to be able to generate values.
@nisarkhan2619
@nisarkhan2619 Жыл бұрын
same problem i am facing and don’t know how to do resource loading in existing project file
@MrShahzaib7
@MrShahzaib7 2 ай бұрын
Can you tell me where this data is being taken from? I did exactly what you said but baseline commutative and commutative work both won't show anything at all. My box is empty and is not showing bar chart as yours.
@ExcelInsights
@ExcelInsights 2 ай бұрын
This happened to me before. From what I read, the OLAP is corrupted. The solution I found working was to copy the project data from the Gantt chart view and paste that on a new file.
@MrShahzaib7
@MrShahzaib7 2 ай бұрын
@@ExcelInsights is it because of the resources? because i am not assigning resources as i have to only track % of the project and not the man hours or machine hours.
@ExcelInsights
@ExcelInsights 2 ай бұрын
Yes, the assignment of resources is part of the things you need to do exactly.
@MrShahzaib7
@MrShahzaib7 2 ай бұрын
Hi there again. I have a problem which I think you can help me with. I have prepared a project schedule around 374 activities with start and end dates, now I want to show in an overview sheet which are the upcoming tasks for the coming week and late tasks also. Can you tell me how to do that? Is there any video which shows that? I am trying to highlight them but I am trying to show them in an overview dashboard. Please help.
@christang9406
@christang9406 11 ай бұрын
Thanks sir, i managed to create the curve as instructed. I forgot to make the work baseline in the beginning. and the tick options.. Thank you!
@lapparellasignature9975
@lapparellasignature9975 Ай бұрын
God bless you man.
@ammadkhan5380
@ammadkhan5380 Жыл бұрын
I'm having 0 for all fields (actual work, cumulative work) in graph report, I have set baseline. Need help
@omarmneimneh-bj3vs
@omarmneimneh-bj3vs 4 ай бұрын
I have same , please advise
@narscalixto9029
@narscalixto9029 Жыл бұрын
Hello, do you have the same for Primavera P6?
@giacomov83
@giacomov83 Жыл бұрын
Thanks a lot. Could you please clarify how to show different bars for baseline and actual/planned?
@ExcelInsights
@ExcelInsights Жыл бұрын
Hi, do you mean you want to show the chart as a bar/column chart instead of a line chart? Because if yes, then that is not an S-Curve anymore. Did I understand your question correctly?
@giacomov83
@giacomov83 Жыл бұрын
@@ExcelInsights sorry..I was meaning the view in tracking Gantt with bar charts of planned Vs baseline..that is how normally tracking Gantt displays the Gantt chart! Solved!
@ruigamito
@ruigamito 2 жыл бұрын
Hi! Many thanks for the video. Is it posible to do this curve for a daily calendar?
@ExcelInsights
@ExcelInsights 2 жыл бұрын
Yes, you just need to continue collapsing the Excel data to daily. However, daily curves tend to be not as smooth looking as weekly curves.
@danishaiman5952
@danishaiman5952 Жыл бұрын
hi,urgent may i ask why my baseline cumulative is all 0 ? but mu actual cumulative has the value
@ExcelInsights
@ExcelInsights Жыл бұрын
Did u declare baseline?
@lynnettekm1661
@lynnettekm1661 Жыл бұрын
@@ExcelInsights I am having the same issue...My values are all 0...The Chart is completely empty with no histogram
@pepenator79
@pepenator79 Жыл бұрын
Same thing happens in my case@@lynnettekm1661
@hargovindbhatt8284
@hargovindbhatt8284 Жыл бұрын
@Excellnsights i have same issue to show all 0 in the data set and no histogram has shown..
@adedigbaafeezadedayo2324
@adedigbaafeezadedayo2324 Жыл бұрын
I'm having similar problem. .it keeps bringing 0
@syafeeqahsofi5326
@syafeeqahsofi5326 7 ай бұрын
Hi sir, from available fields from visual reports, i dont have baseline cumulative work and cumulative work to add to selected fields.. what to do sir..?
@nurdiyana2945
@nurdiyana2945 6 ай бұрын
do i need to complete all the actual start and finish date to generate the report? because i have set the baseline but the date are not complete yet as the project is ongoing, when i generate the report all the cummulative value in excel is 0
@ExcelInsights
@ExcelInsights 6 ай бұрын
Hi, here's a video if the project is still ongoing: kzbin.info/www/bejne/aonNe2uil6aqZ5Ysi=lfH7AV4-EVHUFWfR
@filipefigueiredo85
@filipefigueiredo85 Жыл бұрын
That's a great tutorial. Is possible to build the same chart but considering only Material Resource type?
@shyam1027
@shyam1027 Жыл бұрын
This is truly outstanding and precise explanation! . Is it possible to assess or forecast the future rate of work by S-curve?
@ExcelInsights
@ExcelInsights Жыл бұрын
Excel can do this by means of regression analysis. However, it requires that your dates are evenly separated.
@OrleansMakuza
@OrleansMakuza Жыл бұрын
Great Tutorial - Thanks!
@ExcelInsights
@ExcelInsights Жыл бұрын
Glad it was helpful!
@TomTaebterces
@TomTaebterces 2 ай бұрын
how can I show day instead of week
@parthachakraborty48
@parthachakraborty48 8 ай бұрын
Wonderful explanation
@MuhammadZubair-jl4nn
@MuhammadZubair-jl4nn Жыл бұрын
Sir, Thanks for guidance. please prepare one more video to guide us that how we can create "critical task report" in progress tab.
@amirulh166
@amirulh166 Жыл бұрын
What represent number for baseline and actual cumulative work? what does the work number mean?
@ExcelInsights
@ExcelInsights Жыл бұрын
This is auto calculated based on the dates (both the initial and actual) you enter in the Gantt chart.
@imamhandoyo3930
@imamhandoyo3930 8 ай бұрын
Thank you ...helpful a lot
@pmodepartment
@pmodepartment Жыл бұрын
Sir, how can it change the value from work hours to percentage value based on % complete column in gantt chart ?
@ExcelInsights
@ExcelInsights Жыл бұрын
During the export part, look for the % column you are looking for
@warrenjames5658
@warrenjames5658 Жыл бұрын
Hi Excel Insights. Thank you for the awesome video. Can you kindly compile a video on EVM analysis. Computing EV, PV and AC. Thank you
@ExcelInsights
@ExcelInsights Жыл бұрын
Hi, There is a templated report in MS Project that already does this.
@abimazran7351
@abimazran7351 Жыл бұрын
how to show weightage in MIP??
@muhammadzulhilmanmazlan9450
@muhammadzulhilmanmazlan9450 4 ай бұрын
why the value is zero for both baseline and actual? is it because I didn't enter the resources? please help
@ExcelInsights
@ExcelInsights 4 ай бұрын
Try declaring as Baseline1. Then, use Baseline1 Cumulative in the report
@oootoob
@oootoob Жыл бұрын
This can be done directly in Project using reports. But how can you show work completed as a percentage rather than hours?
@davidt.akin9096
@davidt.akin9096 11 ай бұрын
You can do this using cumulative percentage complete
@kornvisanuthongrat5656
@kornvisanuthongrat5656 2 жыл бұрын
Thank you for shared the good thing!! But i have some issue, In visual report field picker, it doesn't show Baseline Cumulative Work and also no Cumulative Actual Work. Please feedback me how to make it appear. hope you can help __/\__ (I'm use MSP version 2010 )
@ExcelInsights
@ExcelInsights 2 жыл бұрын
This was a problem with Project 2010 (and actually other programs too had many problems during the launch of 2010 versions that Microsoft released what we call "Service Pack 1" that fixed many issues in the 2010 versions.) I cannot find the link to it anymore. Maybe you can be lucky and find the "Service Pack 1" update or get the more recent versions of MS Project.
@kornvisanuthongrat5656
@kornvisanuthongrat5656 2 жыл бұрын
@@ExcelInsights Thank you for your reply sir, I will try to get the update version. ^^
@redstoneengineeringandcons3301
@redstoneengineeringandcons3301 Жыл бұрын
Hi Excel Insights, how to extract the manpower histogram? Kindly share the link kung may video na kayo regarding dito. Salamat
@ExcelInsights
@ExcelInsights Жыл бұрын
Do you mean histogram per week Yung buckets?
@muhammadamirin5088
@muhammadamirin5088 7 ай бұрын
Why my filter dont have monthly to drag like vdeo
@chanont6042
@chanont6042 2 жыл бұрын
Thx sir good job
@ExcelInsights
@ExcelInsights 2 жыл бұрын
Thank you!
@junegalsim
@junegalsim 7 ай бұрын
Pagawa sana ako ng scurve
@DfFg-qh5ub
@DfFg-qh5ub 10 ай бұрын
Weekly calender is field
Identifying Critical Tasks in MS Project
6:13
Excel Insights
Рет қаралды 4,7 М.
📊 How to Build Excel Interactive Dashboards
19:21
Kevin Stratvert
Рет қаралды 2,7 МЛН
A Child's Big Mistake Turned Into an Unforgettable Gift #shorts
00:18
Fabiosa Stories
Рет қаралды 43 МЛН
ماذا لو كانت الفواكه حية 🥥🍸😜 #قابل_للتعلق
00:42
Chill TheSoul Out Arabic
Рет қаралды 29 МЛН
Morph PowerPoint tutorial #powerpoint #tutorial
0:49
fastppt_
Рет қаралды 33 МЛН
How to make S Curve in Microsoft Project | S Curve in Project Management
12:57
Create Planned Target vs Actual S-Curve from MS Project
11:16
Excel Insights
Рет қаралды 19 М.
Master Microsoft Project in 20 MINUTES! (FREE COURSE)
18:39
Alvin the PM - Become a Certified Project Manager
Рет қаралды 584 М.
Creating an S-Curve Chart in MS Excel
12:57
Excel Insights
Рет қаралды 202 М.
MS Project 2016 Baselines: compare actual and initial plan
3:19
The Difference Between "% COMPLETE" and "PHYSICAL % COMPLETE" in Microsoft Project
14:48
Planned vs Actual chart in Excel | With Corrective Path
13:13
ExcelTips
Рет қаралды 45 М.