Fuji TV, TV Asahi, TV Tokyo, and NHK, thank you for the videos🎞 Correction: 10:40 JO FS SlSt2 BV 2.30 GOE 0.67 Score 2.97 belongs to the season 2007/2008, not 2009/2010
I never knew he got perfect GOE for both of his StSq in Nats 2013 when he was badly injured. He always throws himself into his stsq with every emotions inside his body but to do that even when he was hurted both inside (the knee) and outside (the bleeding hand), both physically and mentally... What a fighter.
Thanks for this video. Daisuke's skating is so amazing and he continued even when injured. So beautiful to watch him skate. I had forgotten how great he is so thank you for reminding me why I loved him so much.
БОЛЬШОЙ АРТИСТ НА ЛЬДУ.! КРАСИВО, ЭМОЦИОНАЛЬНО, ТЕХНИЧНО.! КУМИР ВСЕЙ ЯПОНИИ!👍👏👏💯🥰❤
@Avrora16022 жыл бұрын
ПЕРЕВЕДИТЕ ПОЖАЛУЙСТА! Я НЕ ЗНАЮ АНГЛИЙСКИЙ.
@meowmix122 жыл бұрын
@@Avrora1602 (Машинный перевод) Daisuke TAKAHASHI Коллекция совершенных последовательностей шагов GOE 1. SP Nationals 2009 Он только что вернулся после разрыва ACL. (Он порвал связку правого колена). 2. FS Nationals 2010 Он делал много кувырков через голову, даже когда страдал от хлыстовой травмы. 7. SP Nationals 2013 Почему он получил травму именно сейчас? (До Олимпийских игр оставалось всего два месяца...) 8. FS Nationals 2013 Он был бойцом, несмотря на ушиб кости.
@Avrora16022 жыл бұрын
СПАСИБО.!
@tranminhhao85 Жыл бұрын
It is difficult to compare Hanyu and Daisuke, i prefer Hanyu. both of them are so amazing