Рет қаралды 6,144
DELHI DEHRADUN EXPRESSWAY | Baghpat Section | Phase 2 Update | Travel Logs |
Phase II - greenfield: between proposed EPE Junction in Delhi and Ganeshpur near Saharanpur bypass
EPE-Saharanpur: 118-kilometre-long (73 mi) route with six lanes, seven interchanges and 60 underpasses from EPE to Saharanpur east bypass via
Khekra (Baghpat eastern bypass),
Lohadda (Baraut eastern bypass),
Karaunda Mahajan (intersect NH 709A Karnal-Meerut),
Khyawari-Gogwan Jalalpur (just east of Thanabhawan on UP-SH12 Panipat-Muzaffarnagar),
Sohanchida Mast at 108-kilometre (67 mi) milestone (spur to Saharanpur-Roorke-Haridwar Expressway),
Latifpur Aht (next to Lakhnaur on Saharanpur east bypass, at 119 km).
Saharanpur-Rajaji National Park: 40-kilometre-long (25 mi) route with six lanes from Saharanpur east bypass to Ganeshpur in NH 307 Latifpur Aht at southern entrance of Rajaji National Park.[8]
Rajaji National Park-Dehradun: 19.5-kilometre-long (12.1 mi) route runs through a two-tube tunnel of total 2.322 kilometres (1.443 mi) length, then 4.82-kilometre-long (3.00 mi) four-lane elevated flyover of 6-metre (20 ft) vertical clearance underneath for elephants and wildlife, then 2.12-kilometre (1.32 mi) at-grade hill route, and 340-metre (1,120 ft) single-tube tunnel.
#delhidehradunexpressway #dehradun #delhi