The DM Civil poly welding team are completing the installation of new distribution water mains and electrical conduits on Katemeraire and Temeraire Roads at Geordie Bay Accommodation Units at Rottnest Island. This project involved the trenchless installation of DN180 water mains and DN110/DN160 electrical conduits, minimising surface disruption.
The scope included setting up fire hydrants, plumbing lead-ins, and electrical pits, with careful integration of new mains and conduits into the existing network. The team ensured that all disturbed areas were reinstated to their original condition.
From pipe stringing and welding to the precise placement of electrical conduits, the project was executed with a strong focus on safety, quality, and efficiency. The progress and efforts of our team on site reflect our commitment to delivering reliable infrastructure solutions.