Thank you Dave. Amtrak really started getting into the business of Mail and Express in the 1990s and by the late 90s they were doing great business at it. The Three Rivers Train would have more Mail and Express cars than passenger cars on the train and The Texas Eagle would have 10-20 cars behind the coaches! They would goto all the freight shows advertising themselves. Sadly by 2006ish it all stopped. They thought they were not making any real money at it and Union Pacific complained about it.
@kevinwong65887 жыл бұрын
It was Gunn who cut the mail and express freight operations in 2005, citing delays to passenger traffic in switching cars and reducing overhead. The Three Rivers was basically a mixed freight with coaches and dinette added on until March 2005.
@maxm23176 жыл бұрын
Kevin Wong Which is a real shame. The potential still exists for Amtrak to haul short-distance intermodal freight on their Eastern trains. Sure, it'd probably be taking money out of the pockets of freight railroads, but it'd probably be enough to at least partially cover the dividends of renewed Amtrak express freight services.
@packr726 жыл бұрын
He cancelled it because he wanted more money to subsidize the passenger service and the USPS wasn’t gonna bite.
@hans24065 жыл бұрын
Was he paid by the freight companies? A train company, even Amtrak, should be able and allowed to try to make a profit, also compete. But like I said, these "reformers" of rail companies often had a double agenda, like Beeching in the UK, it now is clear he was paid by the car and truck industry.
@penskepc23744 жыл бұрын
@@hans2406 they run on freight companies tracks and have priority, how is it even remotely fair for them to run freight?
@visionist73 жыл бұрын
@@penskepc2374 the don't have priority on freight tracks. That's why they're always late
@patrickhill8210 жыл бұрын
i remember when i rode the southwest chief it was 30 cars long!
@DanMeyer805 жыл бұрын
it was like that when I rode it back in 02
@aure7454 жыл бұрын
Why that ugly Express trak boxcar with no amtrak logo
@ravenhawk69107 жыл бұрын
Great video! Even got the Ocean View (Super Dome) in there too! Very nice.
@blackbirdgaming81475 жыл бұрын
ravenhawk6910 My guess is it was either returning from or heading to Beech Grove. It’s likely that by this time the other full length dome had been removed from the roster, leaving only Ocean View. The other dome was #10030 Mountain View.
@Trainsbigandsmall11 жыл бұрын
Thank you Maxim. Amtrak said they were losing $5 million a yr off the service. That does not make sense to me. The freight railroads did not like Amtrak being the freight business but Amtrak had the rights. The ExpressTrak boxcars carried even lemons in them and other food!
@LibertyRailfan6 жыл бұрын
Great video Trains Big and Small, we should petition to bring these trains back... ! Make the postal system great again!
@AJ679012 жыл бұрын
Step one is to get rid of DeJoy.
@InventorZahran10 ай бұрын
Step two is to incentivize businesses to send their shipments via the USPS instead of commercial delivery services, citing fast mail trains as an advantage.
@glendenig64198 жыл бұрын
This is cool... in the mid eighties, living in Springfield, Ill, I remember Amtrak trains speeding over the street crossings by the Amtrak station with multiple baggage cars, Amfleet cars, Superliner cars and many Amtrak boxcars. As a kid I though that was an interesting and even unlikely consist. Then I learned the reason. They must've dealt in freight for at least a couple decades?
@chambs12311 жыл бұрын
Thanks again buddy for more information...I love learning stuff like this! All the best, John.
@packr723 жыл бұрын
The ironic thing is Amtrak stopped this partially because the freight railroads complained but in the same sense freight railroads have no interest in hauling time sensitive goods. They only want to move raw materials, grain, chemicals and containers.
@maddiekits2 жыл бұрын
I think if Amtrak held in there a bit longer, the freight companies would have stopped complaining. They where probably still in denial that they wouldn't try to do both in the future still lol.
@ShadyCreeper964 Жыл бұрын
For time sensitive goods such as mail and packages, the time sensitivity had to be no less than the time length of the Amtrak route it was on.
@MrBnsftrain6 жыл бұрын
The first and 4th trains had a fair amount of mail boxcars of the later freight design, while the other ones had almost the same amount of 'freight' cars as passenger cars! I also noticed a Phase IV engine andd some phase III baggage cars! Nowadays, almost every baggage car is in phase III heritage livery, and 184 has been repainted back to Phase iV! 2:04 nice catch of the great dome car at the front! Amtrak should've kept more dome cars!
@TheLewistownTrainspotter81026 жыл бұрын
The train with the Phase IV has a future heritage unit on it.
@notarotomwithhair56372 жыл бұрын
@@TheLewistownTrainspotter8102 66, now its gone :(
@rockford25236 жыл бұрын
Amtrak should resume carrying freight. The money is with freight.
@timf22792 жыл бұрын
Lol I agree but the money is with congress.
@amtrak_1212 жыл бұрын
THATS WHAT IM SAYING!!!
@ShadyCreeper964 Жыл бұрын
They could use it as a means of getting the freight railroads to pull their heads out of the track ballast and stop making their trains super long. Sure, longer trains can carry more goods and therefore make more money but it may create problems for time-sensitive trains such as passenger trains.
@amtrak_12111 ай бұрын
I say we do something about it!
@amtrak_12110 ай бұрын
@@ShadyCreeper964 Is there anything we can do?
@chambs12311 жыл бұрын
OK Danny...fully understood. Big thanks for the confirmation & info. Cheers, John.
@christianstudivant48044 жыл бұрын
That’s looks so badass freight on Amtrak I wonder when will Amtrak do this again, and honestly Amtrak freight business would’ve last longer if Gunn wouldn’t have ended it and the freight railroads complaining.
@nightmarefredcat23526 жыл бұрын
2:03: that's a rare coach.
@michaelminton1224 Жыл бұрын
I remembered seeing some of Amtrack trains here in Western NY back in the 2000's and it was interesting.
@davidwinfield73010 жыл бұрын
Awesome rare video thumbs up.
@AmericanRailfan-gb8oq7 жыл бұрын
Did anyone knoe that amtrak was allowed to haul all types of freight and not just mail?, that was until CSX came to the table and said "We are giving these guys priority, to do our work!"
@packr726 жыл бұрын
Mitchell DeVillers It’s cute when freight railways claim they give Amtrak “priority.” Freight railways should be grateful that they no longer have to haul passengers.
@Trainsbigandsmall11 жыл бұрын
Yes it sure does. I knew someone would notice the full length dome car!
@Trainsbigandsmall11 жыл бұрын
They were times it did very good! On the Texas Eagle train they would have 20 cars of Mail and Express behind the coaches. This was 1999 I am talking here. By the time I saw that same train in 2004 It had dropped the Mail and Express all together and was down to just a single unit train.
@lexadams42598 ай бұрын
The reason it was cut was not bc of overhead or anything. It was bc the freight railroads were crying. The were mad at 14 freight cars when they had 100+ car trains. It kept several routes alive and was helping to get to profitability. I understand if railroads charged a reduced fee, but no railroads demanded it gone.
@Trainsbigandsmall11 жыл бұрын
Yes your are right John. By the way the P40s are the 800 series locomotives. Even by 2004 Amtrak had stopped putting Mail and Express on some trains like the Texas Eagle.
@Trainsbigandsmall11 жыл бұрын
Thank you Curtis!
@amtrak_1212 жыл бұрын
We gotta get mail service back!
@user-AZ-phil9 ай бұрын
I rode the "Southwest Limited" west from Kansas City and Albuquerque a couple of times during the period that Amtrak was carrying that stuff. It was better than a half hour late out of Kansas City, and over an hour late out of ABQ. On both occasions, the thru folks from Chicago were complaining about the time it took to get out of town as the "express" cars were added to the train after pulling out of Union Station. Another complaint that I heard was from small towns that the trains stopped at where multiple grade crossings were blocked, during the station stop, due to the length of the train. It was a happy time, maybe, for the pencil pushers, but something of a pain for everyone else. 😮
@howarth00411 жыл бұрын
Good old days , think post was faster then
@davidwinfield73010 жыл бұрын
It's a frasenger train lol
@harrisonofcolorado88866 жыл бұрын
Yeah good portmanteau word for passenger and freight train!
@Canadian_Yoshi4 жыл бұрын
Lol
@RyansColoradoRailProductions3 жыл бұрын
actually it's called a "mixed train", as it carries both passengers and freight.
@visionist73 жыл бұрын
Preight train
@SGTDUPREY11 жыл бұрын
there be none around here in the lower area of southwest washington. just cascades and the coastal starlight.
@IAIS9611 жыл бұрын
that's was AWESOME Amtrak trains
@patrickhill826 жыл бұрын
thwe chief always had 3 to 4 engines and the most freight the zephyer was usually shorter than the chief
@coast_to_coast_photos4 жыл бұрын
Surprising to see that P42 #97 still in Phase IV colors at 1:12 since 2003 was pretty much the last year the P42s wore both Phase IV and V colors. By 2004 most of the Phase IV P42s had been repainted
@Trainsbigandsmall4 жыл бұрын
I understand. The video was taken in early June of 04.
@coast_to_coast_photos3 жыл бұрын
I was just 1 year old at the time as well
@chambs12311 жыл бұрын
It was good to see this video Danny...especially just after doing my 'Amtrak Day Vid'...this is the first time I've seen them for real [so to speak]. I assume all the locos were mainly P40's.P42's? Best, John.
@Trainsbigandsmall11 жыл бұрын
Thank you very much man!
@superbaddy45 жыл бұрын
R.I.P. P42DCs 66, 70, and 80.
@sernajrlouis Жыл бұрын
Cool video and channel just subscribed
@jasonervoes1326 Жыл бұрын
Hi great videos. Do you have any photos or videos of Amtrak with mail cars and an Amtrak caboose on the rear?
@ConrailFreight6 жыл бұрын
1:57 where was that horn coming from?
@silverstatehighiron6 жыл бұрын
A nearby Metra train
@RyansColoradoRailProductions3 жыл бұрын
0:17 thats Omega, 207, the last P42 built!
@Trainsbigandsmall11 жыл бұрын
Ok then young Astars boy. You missed out on these awesome lashups and the days when more EMD was around!
@SD40Fan_Jason5 жыл бұрын
I can remember working in Arizona and seeing the Chief with more freight and less cattle (passenger) cars. For a while I thought maybe that's all they would handle after a while. It did however set a plan in place to have a solid consist over a long haul rather than having to continuously switch them out from one yard to the next.
@DanMeyer805 жыл бұрын
I rode the Chief in June of 2002, we definetly had more freight cars than passenger cars. To this day I still remember our locomotive consist numbers. 57, 504 (not powered, just being taken to LA) 19, 48, and 62.
@skeeta19 жыл бұрын
thats why i looked at this video. I saw a train just like this one hauling freight cars in Dunn, NC. I was shocked to see those cars hauled by an Amtrak
@user-TheBestRailfan5 жыл бұрын
Amtrak phase 4 sceme?! Rare. I have them to
@anonymousperson96104 жыл бұрын
Why did Amtrak discontinue carrying freight this look badass seeing boxcars behind a passenger train.
@Trainsbigandsmall4 жыл бұрын
The freight Railroad disliked Amtrak doing this because they thought Amtrak was stealing their business and in the end Amtrak was not making all that much profit.
@anonymousperson96104 жыл бұрын
@@Trainsbigandsmall honestly that’s messed up and at first Amtrak did pretty well carrying mail and freight
@Trainsbigandsmall11 жыл бұрын
I understand buddy. Thanks
@Trainsbigandsmall11 жыл бұрын
Yes true man. Last I saw, some of them were in storage at Harrisburg yards in 2010.
@El_Transportacoches_332 жыл бұрын
Box wagons, bogies to transport the trailers... The only thing missing would be to couple a few AutoTrain car transporter wagons. Then it would already be the complete Amtrak freight package.
@maddiekits2 жыл бұрын
If we got more routes out of it I'd be fine with amtrak becoming 90% freight lmao
@rms4924 жыл бұрын
Amazing from this to today’s 4-car Capitol Limited,
@JoshuaTheTransitProdigy7 жыл бұрын
**subbed while watching**
@RailfanMax11 жыл бұрын
Great video Danny! Any idea why they dont carry mail now?
@MiniforceRailfan2 жыл бұрын
I was thinking that the Dash 8 Locomotives should run Amtrak’s Freight Service and the Auto Trains because they look like Freight Locomotives and look qualified for those Services
@notarotomwithhair56372 жыл бұрын
P32-8BWH a s s e n g e r
@MiniforceRailfan2 жыл бұрын
@@notarotomwithhair5637 so the name of the Dash 8 is P32-8BWH Dash 8 Amtrak? But it looks like a Freight Locomotive qualified for Auto Train Fleets
@notarotomwithhair56372 жыл бұрын
True
@notarotomwithhair56372 жыл бұрын
The Dash 8 was made by GE as compensation because the P40DC was taking longer than expected
@rebooted.jupiter_ Жыл бұрын
@@MiniforceRailfan it originally was, but it was basically converted to a passenger locomotive at the beech grove shops
@upstatenewyorkrailfan67759 жыл бұрын
why did Amtrak stopped pulling mail trains?
@trainjack168 жыл бұрын
Budget cost
@maxm23176 жыл бұрын
John Vanwiel Pressure from President George W. Bush and his administration. Most Republicans, as a rule, are against Amtrak, but there are a few out there who support Amtrak. While I may not be a politician, I am a Republican, and I support Amtrak. Well, at least I did until they announced their new rules regarding private rail car moves.
@packr726 жыл бұрын
Max Medaglia That whole situation is weird. Amtrak is trying to move away from long distance trains and focus on regional. The long distance trains actually make more money than the regionals. They want to buy cheaper fleets of Diesel MU to replace locomotives and there is little chance those can pull old passenger cars.
@Trainsbigandsmall11 жыл бұрын
You must really like the P42s.
@Major_Tom985 жыл бұрын
1:12 I’m surprised to see that phase IV made it all the way into 2004.
@dannyvasquez45819 жыл бұрын
theres a dome car and P42 #66 as Phase 2
@dannyvasquez45817 жыл бұрын
The Units are painted in Heritage schemes in 2011 were #66 as Phase 2, #184 as Phase 4, #145 & #822 as Phase 3, and #156 as Phase 1
@AlexTraxxas7 жыл бұрын
and actually a third one in phase 3
@coolleo1492 жыл бұрын
66 is sadly scrapped, same to 156 too
@davidwinfield73010 жыл бұрын
What is express freight, I know what they mean by it but what kind of cargo besides mail would they carry?
@Dan-lf6bo9 жыл бұрын
They could also carry personal trailers or different types of equipment for Amtrak I'm guessing.
@trainjack168 жыл бұрын
They are called roadrailers
@simplyjohn210 жыл бұрын
In a few more months amtrak will do it again!
@Trainsbigandsmall10 жыл бұрын
I just do not see it happening again, UP and BNSF objected to Amtrak hauling freight.
@trainjack168 жыл бұрын
+John Ballardo How do you know that ?????
@TexasRailfan21-RailfanRyan3 жыл бұрын
I wonder what the reason was why Amtrak is continued the service did it something to do with the freight railroads
@glendenig64198 жыл бұрын
... on second thought, those amtrak boxcars may have been Amtrak Autotrain cars.
@trainjack168 жыл бұрын
They were not.
@evanf12934 жыл бұрын
when did amtrak discontinue this?
@Trainsbigandsmall4 жыл бұрын
2005 or just after in 2006 the fall i saw the roadrailers on NS trains
@evanf12934 жыл бұрын
@@Trainsbigandsmall Ah so NS took over the mail trains then?
@Dan-co1br3 жыл бұрын
1:20 wait WHAT THE HECK WHY IS THE BOX CARS IS LONG
@traindude33326 жыл бұрын
Maybe amtrak can do freight service
@caltrain_acefoamer9073 жыл бұрын
1:13 66 before becoming a heritage unit
@HomerPenguin55164 жыл бұрын
Who noticed amtrak 66 at 1:13? (R.I.P 66)
@lukethegeneralelectrice60p803 жыл бұрын
Oh boi did i see gret dome
@SGTDUPREY11 жыл бұрын
MHC's, too bad they don't use that often anymore.
@GevoGenesis923 жыл бұрын
When Amtrak was making money!
@oaktree69863 жыл бұрын
ugh i wish i could hear the K5LAs too but the stupid no horn zones ruined it!
@odiecalodie6 жыл бұрын
GE was not happy with Amtrak hauling Mail and Express Cars because those engines were not equipped. to haul those type of cars.
@amtrak7065 жыл бұрын
GE didn’t care what Amtrak did, the locomotives were already bought and paid for. It was the freight railroads that objected.