Few errors to point out: 1. Don’t bend over and roll the hose up. Do this for more than one hose length and you’ll hurt your back. Stand up and roll it in your hand. You can easily pull the hose towards you and keep it straight with your foot. Your back will thank you. 2. You spaced it too far. You don’t need 3 booth lengths. Only need 1.5 boot lengths. You want the couplings to be much closer. You don’t need 12-18” of hose to protect the male couple. That is overkill. Only need it to overlap by 5-6”. Besides when you go to roll it out you want to be holding both couplings so you don’t get whacked in the face by one!
@hoangtr8962Ай бұрын
trained to roll it up in 1 foot or 2 depending on the hoses size
@obijuankenobi4202 жыл бұрын
Don't lift with your back my guy.
@tafadzwachikweye94612 жыл бұрын
This one is too slow, its wiser to put the hose parallel and place the male coupling om top of the female same line thus you role nicely without delay..better technic though.thank you
@moussaokoth50073 ай бұрын
Female coupling should always be on top of the male coupling,not the other way round
@wedoitourselves38054 жыл бұрын
why is the female 12-18 longer?
@Slammed5019113 жыл бұрын
The 12-18” overlap allows the female side of the hose to protect the threads on the male coupling.
@tafadzwachikweye94612 жыл бұрын
Male 18-24 inches from the female to allow for easy deployment grip
@StarGazing84613 ай бұрын
You don’t need 12-18” to overlap. That’s overkill. Only need 5-6” at best. And when you go to deploy it you want the couplings to be closer together for a smooth roll out. He spaced it too much. Should be 1.5 boot lengths. Not 3
@vishalsurujdeo2 жыл бұрын
Isn't this a Dutch roll
@nato74452 жыл бұрын
Not In the states. It’s called a donut as it looks like one. The uk call it a Dutch roll halved over itself. A conventional is just rolled. Without going over itself