I just watched all your playlist for TPR upgrade, your drone views and commentary are a great resource, recording a landscape during major changes, well worth making and viewing, thanks!
@SWRural-fk2ub7 ай бұрын
Another first class report, thank you.
@trevormegson75837 ай бұрын
It's nice to see the progress of the TPR upgrade. The fact that it is going ahead must be the 8th wonder of the world. I travel occasionally from Leeds to Huddersfield by rail for leisure purposes when I visit the Holme Valley area. Rail replacement buses are ok but better than nowt. Thanks for documenting all this. I watch with interest.
@suesmith43667 ай бұрын
Thanks for the update, looking forward to the next one 😎
@declanjoyce86407 ай бұрын
Yes...good coverage...thank you
@i_and_g_adventures7 ай бұрын
Thanks!
@TheDaf95xf7 ай бұрын
Very interesting 👍🏻
@jeanpalmer1417 ай бұрын
I wonder why this bridge and others on this line could not have been saved by using GLS 100R® Electrically Insulating Coating? This didn't seem to be listed as an option although it is cleared by Network Rail. Is it just that this development has taken place after all the deliberations over the TPR upgrade had taken place? Pity because it could have saved millions and saved some rather fine old bridges. John
@i_and_g_adventures7 ай бұрын
There was no reference to that in the documents I read so presume it wasn't considered. I'm not close enough to the project or have enough engineering background to answer your question
@iman23417 ай бұрын
Is the coating viable to use on masonry bridges. Afaik it’s only suitable for already painted/ metallic bridges?
@22pcirish7 ай бұрын
Overhead electrification needs height which the shallow arches does not provide.
@andrewreynolds49496 ай бұрын
Looking at the profile of where the new track positions will be, and where the pantographs would need to pass through, it's physically impossible to fit under the existing bridge
@brianwhiting56586 ай бұрын
i do not understand as huddersfield viaduct used to have 5 tracks why they have to widen it for 4 tracks .
@andrewreynolds49496 ай бұрын
For the most part it's not actually being widened; some of the old steel spans are being replaced, but most of the viaduct and the abutments are receiving only strengthening works. The only part being widened is a small length by the station, where a cantilever section over the road will be added to extend one of the platforms.
@Harry244ful7 ай бұрын
I love how we are re quadrupling a route that was absolutely fine 100+ years ago 😒 should have never lifted the tracks in the first place
@i_and_g_adventures7 ай бұрын
The irony isn't lost on me either!
@guyroebuck8510Ай бұрын
It is on a faster alignment.... I am relieved I am alive to see it actually happening. 🎉