Drone visuals of Kudavoorkonam Overpass site, Attingal Bypass

  Рет қаралды 490

The Safari Tales

The Safari Tales

Күн бұрын

Пікірлер: 3
@mssureshkumar9305
@mssureshkumar9305 4 ай бұрын
മനപ്പൂർവം പണി വൈകിപ്പിക്കുന്നത് ജനപ്രതിനികളുടെ, പ്രത്യേകിച്ച്, എംപി യുടെ ശ്രദ്ധയിൽ കൊണ്ടുവരാൻ ശ്രമിച്ചാൽ നന്നായിരുന്നു, ഇങ്ങനെ പോയാൽ എന്ന് തീരാനാണ്
@g.p.prathapchandran8209
@g.p.prathapchandran8209 4 ай бұрын
Why too much delay sir
@thesafaritales
@thesafaritales 4 ай бұрын
I asked the same question to the excavator operator and the answer was rain. But works in other reaches are progressing even during rain, so I find that excuse somewhat unbelievable.
Attingal bypass update January 2024
19:26
Ronishz vlog
Рет қаралды 2,3 М.
I'VE MADE A CUTE FLYING LOLLIPOP FOR MY KID #SHORTS
0:48
A Plus School
Рет қаралды 20 МЛН
She wanted to set me up #shorts by Tsuriki Show
0:56
Tsuriki Show
Рет қаралды 8 МЛН
Chirayinkeezhu ROB and station project status
8:28
The Safari Tales
Рет қаралды 1 М.
Attingal Bypass: Kollampuzha and Ramachamvila
9:26
The Safari Tales
Рет қаралды 1,4 М.
NH66 Drive video: Kadambattukonam to Ithikkara
25:59
The Safari Tales
Рет қаралды 424
I'VE MADE A CUTE FLYING LOLLIPOP FOR MY KID #SHORTS
0:48
A Plus School
Рет қаралды 20 МЛН