Dumb Logic in Stepford County Railway Episode 3

  Рет қаралды 1,323

SageLeafProductions

SageLeafProductions

Күн бұрын

Пікірлер: 28
@juoig7799
@juoig7799 Ай бұрын
They're modernized semaphores. Semaphores that use LEDs and are controlled electronically instead of mechanically.
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@juoig7799 To be fair, that is a good point. I suppose they must be in an area of the railway that’s electrified
@TW_Tunaking
@TW_Tunaking Ай бұрын
1 more dumb logic in SCR: THE SUN RISES UP AT NORTH Or Stepford East is actually Stepford North (or West) , Airport West is actually Airport South, West Benton is actually South Benton, Leighton West is actually Leighton South. Northshore still called North shore because it's at the North of the whole map.
@SadLivingPerson
@SadLivingPerson Ай бұрын
Your so good at geography!
@itwithlyam9334
@itwithlyam9334 Ай бұрын
There are a bunch more problems to do with semaphore signalling as well... For example, irl the yellow signals ("distants") do not show the aspect of the next signal, instead they show the aspect of every signal through the end of the section (in this case, RB-CB and CB-AS), and because of this, most boxes only have 2 or 3 yellow signals, in contrast to having them at every stop signal. Also, semaphores are meant to change as the last carriage of the train passes, which SCR didn't implement. By the way, semaphores aren't exclusively controlled by levers; there are many places in the UK where modernised signalling equipment is being used (e.g. NX, IECC..) but physical semaphores are still on the tracks. Also, in terms of the signalboxes themselves, it looks like they would have been built at a time when levers were being used, in which case the stairs to enter the signalbox should be outside as irl the whole bottom floor gets used for mechanical interlocking when levers are operated.
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@itwithlyam9334 1. Already SCRs being irrealistic as Semaphores are treated like regular signals 2. Don’t forget to mention that it also applies with regular signals, the signal wait for the last carriage to pass and then it changes from Proceed to Danger 3. Where did you find semaphores that did not require levers?
@hmack91011
@hmack91011 Ай бұрын
I love videos like these but you know what the best part about is is? You used my CLASSIC silly chicken music! lol😂
@SadLivingPerson
@SadLivingPerson Ай бұрын
my CLASSIC silly chicken music? I think you mean “David Fesliyan”’s CLASSIC silly chicken music! lol 😂
@hmack91011
@hmack91011 Ай бұрын
@@SadLivingPerson You know what I mean lol🤣
@JosiasSchapers
@JosiasSchapers Ай бұрын
Not-related Imagine some random person on the line and seeing you just talking to nothing,then: you good?
@SadLivingPerson
@SadLivingPerson Ай бұрын
What is that even supposed to mean? I do not get it!
@JosiasSchapers
@JosiasSchapers Ай бұрын
@@SadLivingPerson Srry
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@JosiasSchapers Its ok but I do not understand why you need to appologise now
@agedflame
@agedflame Ай бұрын
these trains fr pulling electricity particles out of the air... 💀 hope to see you back on yt soon!
@Kkplayzoffical
@Kkplayzoffical Ай бұрын
Ikr💀
@SadLivingPerson
@SadLivingPerson Ай бұрын
Indeed, SCR is just a magical place to live in. See ya soon!
@agedflame
@agedflame Ай бұрын
@@SadLivingPerson Also for the 800 diesel overhead thing, I'll explain in the GC
@SadLivingPerson
@SadLivingPerson Ай бұрын
This video definitely needs to be trimmed
@gibbo_303
@gibbo_303 Ай бұрын
its a roblox game thats not finished development yet, what do you expect
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@gibbo_303 What do I expect? Stepford County Railway 2.0 was in Development in November 2023, that’s 9 months, and apparently, there was going to be more to SCR, only till you realise the update was RUSHED, and that’s the community’s fault.
@Kkplayzoffical
@Kkplayzoffical Ай бұрын
My opinions: 1. ( 4:03 ) Semaphore Signala are manual thus it would take time and aren’t suppose to be used to troll,and the devs have made animations for the signal.However, I do get why you feel that the signal look weird when you are getting signal trolled. 2. ( 5:26 ) SCR is meant to be an arcade game and not well as realistic as BR but in my opinion it would be nice to see some levers which are out of use 3.( 6:48 ) Across the network the overhead line equipment seriously needs to be added in some places like at Faymere green and Stepford Depot like you stated at 8:27 which currently don’t have and aren’t Newry - NH Edgemead - Rayleigh Bay MGTD - MGT (Waterline shuttle) and I think most parts of the network now have meshed OHLE 4.( 7:46 ) most likely to help drivers but still it’s unrealistic 5. ( 8:16 ) SCR are working on it seen by the pantograph button still not working and SCR 2.0 was the ground work for future more technical features. 6 ( 9:04 ) The class 800 is a bi-mode unit and the pantograph (button when it is added) will make it more realistic 7 ( 9:36 ) 3-4 is mostly likely added after the addition of the 385 and I seriously don’t get the extra unless track ether 8. ( 9:42) 2.0 is the groundwork and such features will be added in the future
@agedflame
@agedflame Ай бұрын
bro wrote a full PARAGRAPH 😭
@Kkplayzoffical
@Kkplayzoffical Ай бұрын
💀
@SadLivingPerson
@SadLivingPerson Ай бұрын
1). Agreed 2). If SCR was an arcade game, it would appear on an arcade machine 3). Agreed, if they are gonna keep it like that, they might as well let us drive via Morgantown fly over, newly harbour and on 508 without worrying about electricity 4). Ye we wouldn't want collisions 5). To be fair, it was the communities fault, SCR 2.0 had a higher potential ahead if it wasnt for their patience, causing SCR to rush the iupdate 6). Yep I can tell 7) Platforms 3-4 at carnalea bridge when there isnt even a 2nd platform? 8) I had higher expectations really.
@Kkplayzoffical
@Kkplayzoffical Ай бұрын
@@SadLivingPerson 2 means that it’s like an arcade game based for people who just want to play a game and 7 means the 3-4 car markers
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@Kkplayzoffical OHHH OK
@bussesandtrains1218
@bussesandtrains1218 Ай бұрын
Scr semaphores make no sense at all
@SadLivingPerson
@SadLivingPerson Ай бұрын
@@bussesandtrains1218 Agreed. It’s like Semaphores have been installed with AI cameras, alongside trains operating with magic dust
If Stepford County Railway had Court. A custom film by SageLeafProductions.
8:08
Can You Beat Hitman 3 Without Breaking ANY Laws?
22:37
windowledge
Рет қаралды 2,1 МЛН
How to whistle ?? 😱😱
00:31
Tibo InShape
Рет қаралды 19 МЛН
"كان عليّ أكل بقايا الطعام قبل هذا اليوم 🥹"
00:40
Holly Wolly Bow Arabic
Рет қаралды 15 МЛН
버블티로 부자 구별하는법4
00:11
진영민yeongmin
Рет қаралды 26 МЛН
How Fast Can We Get EVERY Plane In Cabin Crew Simulator!?!
11:40
WaterStarGaming
Рет қаралды 223 М.
pilfering pirates 12
3:48
GRAHAMST3R
Рет қаралды 517
rally racing in roblox
9:00
TheoTheCrasher
Рет қаралды 377
Can you beat Baldi's Basics using AI?
15:45
SageLeafProductions
Рет қаралды 4,7 М.
Guarding an airlink SCR
35:57
Transport Floppa
Рет қаралды 283
Escaping Rayleigh Bay in Stepford County Railway
19:39
SageLeafProductions
Рет қаралды 69
10 Things I DID Want Added to Club Penguin
19:07
Chris Hendricks
Рет қаралды 22 М.
We Got The BIGGEST GYAT in Roblox GYAT SIMULATOR!
10:02
RoBros
Рет қаралды 464 М.
How to create an AFK Money Farm in My Prison
9:19
SageLeafProductions
Рет қаралды 540
Can You Beat Road 96 WITHOUT Hitchhiking?
13:46
Juddsun
Рет қаралды 815 М.
How to whistle ?? 😱😱
00:31
Tibo InShape
Рет қаралды 19 МЛН