Рет қаралды 688,749
This material begins a short series of films on thermal insulation and attic buildings. This is the stage that has a lot of topics worth showing. Among other things, hence this division into several parts. Once that movie as a whole would be terribly long. Two - I don't have all the material recorded yet.
Chapters:
0:00 Introduction
0:37 Covering the slots on the wallboard.
1:08 Preparation of the expansion joint.
1:40 Pulling the string between the rafters.
2:45 Determining the plane of the ceiling.
3:22 What miter handles.
3:48 Determining the plane of the haunch and the attic wall.
5:28 Preparation of profiles - longitudinal connectors.
5:53 Screwing and leveling attic profiles.
8:02 Cutting wool.
8:25 Laying wool between the rafters on the attic.
9:44 Put the profiles on the handle again.
10:10 Laying wool over the open living room.
10:58 Laying wool between the collar flaps.
Wish you enjoy watching!
The structure is made on the profiles of the Polish manufacturer zemir.
www.profilmarket.pl
I encourage you to subscribe to my channel:
/ działkowy hobbysta
Take a look on my facebook
/ dzialkowyhobbysta
And on Instagram:
/ dzialkowyhobbysta