EarthWork Quantity Of A Road By Using Prismoidal Method

  Рет қаралды 53,370

CivilConstruction

CivilConstruction

Күн бұрын

Пікірлер: 44
@silentknight6962
@silentknight6962 3 жыл бұрын
Tareef kya karu uski jisne tum he banaya ... My all time favourite learning chennel I have no words sir U r wonderful ❤️❤️❤️🥰🥰😍😍😍😍😍😍
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Thanks for appreciation, really means a lot .
@kamalraw3792
@kamalraw3792 3 жыл бұрын
Sir please ऐसा numerical भी करा दो जिसमे cutting and filling दोनो हो रही हो।
@Sunilthakur-hy6fn
@Sunilthakur-hy6fn 2 жыл бұрын
excellent explanation sir 👍
@CivilConstruction
@CivilConstruction 2 жыл бұрын
Thanks for appreciation...Keep supporting.
@shayanfarooq3041
@shayanfarooq3041 3 жыл бұрын
Thankyou so much 4 dis vdo
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Anytime ..keep supporting Bro
@Akshat_59565
@Akshat_59565 2 жыл бұрын
I think after once learning this ... No one can forget it ...at life time 💯
@CivilConstruction
@CivilConstruction 2 жыл бұрын
Means a lot.🙏🏻🙏🏻
@rahulcivilengineering7640
@rahulcivilengineering7640 Жыл бұрын
Thanks sir💚
@CivilConstruction
@CivilConstruction Жыл бұрын
👍🏻🙏🏻
@bainarakesh4666
@bainarakesh4666 3 жыл бұрын
Also do one video on estimate the quantities of earthworks for canals
@CivilConstruction
@CivilConstruction 3 жыл бұрын
kzbin.info/www/bejne/e4eskpJohK-ZgLs This video going to help you as this video have Cutting and Filling both ...as we do Earthwork Cutting for canals this video is going to be helpful for you and if u don't understand ..i will make a separate video on Earthwork for Canal
@swertiegarsha1290
@swertiegarsha1290 3 жыл бұрын
Thank you for the vid ☺️
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Anytime .👍🏻
@ayazsiddiqui3263
@ayazsiddiqui3263 3 жыл бұрын
Sir one example on Trapezoidal rule..!! Plz upload
@Shahrozkhan786
@Shahrozkhan786 3 жыл бұрын
Thank you sir
@CivilConstruction
@CivilConstruction 3 жыл бұрын
👍🏻
@predatorgaming895
@predatorgaming895 2 жыл бұрын
What about cutting and filling using this method?
@sakthivelmalairajan2159
@sakthivelmalairajan2159 3 жыл бұрын
Prismoidal and Simpson rule methods are same??
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Its same
@SaitejaTcs
@SaitejaTcs 3 жыл бұрын
If intervals not given , what should we do sir
@CivilConstruction
@CivilConstruction 3 жыл бұрын
If you are doing Earthwork of a road then these intervals you have to take, otherwise you calculating Cross Section Area, intervals define the length which gives us Quantity
@SaitejaTcs
@SaitejaTcs 3 жыл бұрын
@@CivilConstruction we should assume them ? I have a doubt , how to contact you sir
@CivilConstruction
@CivilConstruction 3 жыл бұрын
It usually taken 20,25 or 30 ..but if your Cross Section changing at short interval then you can take intermediate intervals also
@SaitejaTcs
@SaitejaTcs 3 жыл бұрын
@@CivilConstruction how to assume depths , depths also not given
@CivilConstruction
@CivilConstruction 3 жыл бұрын
When you know the Ground Level by doing Levelling at site, then as per the grade of the road you have to mark depth of Cutting and Filling at each interval
@mukeshkannoju7392
@mukeshkannoju7392 3 жыл бұрын
Sir I have a doubt Is prismoidal rule and trapezoidal rule are same...? By the way good explanation sir😊
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Both are different ...Trapezoidal method is known as Average End Area Method
@mukeshkannoju7392
@mukeshkannoju7392 3 жыл бұрын
@@CivilConstruction tq sir...
@CivilConstruction
@CivilConstruction 3 жыл бұрын
Anytime
@sameerprakash2869
@sameerprakash2869 2 жыл бұрын
Sir triangle ke base ke jagah sd kaise hua hai Please reply
@CivilConstruction
@CivilConstruction 2 жыл бұрын
S is the slope of the triangle and d is the height. When base is not given, we get base by multiplying given slope(s) by height (d). As slope is given 2:1 which means 2Horizontal distance as in 1 vertical distance. So when 1 m depth is given so that means we need to have 2 m horizontal distance for base if we go by slope. In same way we get base by directly multiplying base with slope
@sameerprakash2869
@sameerprakash2869 2 жыл бұрын
@@CivilConstruction Sir jab 2:1 diya hai to kya ham 2 ko base man sakte hain aur 1 ko height? Aur kya ye formula hota hai ki base nikalne ke liye slope(s) ko height (d) se multiply karna padta hai ? Aur 2:1 kis chiz ka ratio rahta hai slope:height ya fir horizontal:vertical ka?
@CivilConstruction
@CivilConstruction 2 жыл бұрын
Slope given i.e (s) multiply by by given depth/height (d). 2:1 designates Horizontal: Vertical . e.g if slope ration will be 1.5:1 then we have to take s =1.5 and multiply by depth in order to get the base
@sameerprakash2869
@sameerprakash2869 2 жыл бұрын
@@CivilConstruction Sir 3:5 ratio lekar bata sakte hain kya please And thank you So much Sir
@CivilConstruction
@CivilConstruction 2 жыл бұрын
In that case slope becomes 3÷ 5 =0.6 then multiply it with given depth
@jeffreyschmaus1376
@jeffreyschmaus1376 3 жыл бұрын
Only after a minute did I realize he was alternating languages...
@CivilConstruction
@CivilConstruction 3 жыл бұрын
😁😁
@isaivivek963
@isaivivek963 3 жыл бұрын
Put the notes on drive give link of the notes
FOREVER BUNNY
00:14
Natan por Aí
Рет қаралды 33 МЛН
Estimate of Earthwork for Roads [Year 4]
9:57
Mobile Tutor
Рет қаралды 349 М.
Cut and Fill by mean depth method. Road,Railway,Canal etc.
13:17
Suliman Khan Academy
Рет қаралды 128 М.
Learn Detail Highway Estimation from Drawing | How to Calculate Estimation of Road Construction
14:11
Long Wall Short Wall Method | Estimation of a building by Long Wall and Short Wall Method
22:55
All About Structural Analysis and Design
Рет қаралды 148 М.
4  MID SECTIONAL AND MEAN SECTIONAL AREA METHOD PART 1
21:38
santosh tambolkar
Рет қаралды 4 М.