END FAULT PROTECTION | DEAD ZONE PROTECTION | BUS BAR RELAY | 7SS522 | 7SS523 | 7SS525 | PART-5

  Рет қаралды 3,135

LIGHTNING MINDS

LIGHTNING MINDS

Күн бұрын

Speaker information: Pankaj Kumar Jha
Manager, Power Grid Corporation of India Ltd.
(Power System Engineer with more than Ten (10) years of industrial experiences.)
The SIPROTEC 7SS52 distributed busbar and breaker failure protection consists of compact bay units which are connected to the central unit by fibre-optic cables. All tasks from acquisition of the measured values up to the commands to the circuit breakers are exclusively processed in a digital manner.
In the bay units the feeder or coupler currents are measured time-synchronized, digitalized, pre-processed and transmitted to the central unit.
The central unit reads in time-synchronized measured currents from the connected bay units and processes them together with binary information from the protection functions (differential protection, breaker failure protection).
The central unit transmits the results of the calculations cyclically to the bay units, which perform logical combinations of the results.
The Configuration of Siemens Siprotec-4 De-Centralized Bus Bar Protection Relay using DIGSI-4 Software will be discussed in this series of sessions. This series will consists of 7-8 sessions. At the end of this series you will learn the various aspects of Siemens Dec-Centralized Bus Bar Relay configuration using Digsi Software. We will also discuss about the meanings and implications of various settings available in central unit and bay units of De-centralized Bus Bar Protection. All the sessions will be in Hindi as well as English and you may watch these sessions as per your convenience.
An incredible amount of time and effort is needed to develop high-quality video tutorials. Each video takes approximately 6-8 hours to complete which includes learning the concept myself, brainstorming creative ways to teach and explain the concepts, creating the presentations (if delivered through PPT mode), Setup of analysis software, video recording, and editing. Your support truly makes all the difference. So, Please like👍🏻, comment and share this video with your friends and keep watching this channel for more such videos in future.
#Lightningminds #pankajkumarjha
SIPROTEC-4
SIEMENS DE-CENTRALIZED BUS BAR RELAY CONFIGURATION
SIEMENS DISTRIBUTED BUS BAR RELAY
BUS BAR RELAY CONFIGURATION
7SS522
7SS523
7SS525
DIGSI-4
DIGSI4
SIPROTEC-4
SIPROTEC4

Пікірлер: 4
@yusufbhikhapurwala2495
@yusufbhikhapurwala2495 Жыл бұрын
Very good session
@pawanyadav-rp2nb
@pawanyadav-rp2nb Жыл бұрын
Very good session sir
@softurial8123
@softurial8123 Жыл бұрын
In Manual, it is described that Manual closing of CB signal temporarily block the endfault protection.
@deepikaved8182
@deepikaved8182 2 жыл бұрын
👍
End Fault Protection or Dead Zone Fault Protection for Bus Bar Relay
6:07
RELAY PROTECTION ELECTRICAL
Рет қаралды 2,1 М.
Who’s the Real Dad Doll Squid? Can You Guess in 60 Seconds? | Roblox 3D
00:34
Seja Gentil com os Pequenos Animais 😿
00:20
Los Wagners
Рет қаралды 61 МЛН
Expert Tutorial Busbar Protection - Part 1
42:13
Siemens Knowledge Hub
Рет қаралды 1,5 М.
Local Breaker Backup (LBB) | Breaker Failure Relay (50BF)
10:36
Barani Tech
Рет қаралды 21 М.
Who’s the Real Dad Doll Squid? Can You Guess in 60 Seconds? | Roblox 3D
00:34