Рет қаралды 23,775
In this episode, I give a synopsis of the planking process along with details on how we installed the garboard planks on the Newfoundland Trap Skiff. This is followed by an in-depth discussion on the lining off of the hull which determines where all the planks following the garboards will land.
Corrections: when discussing the division process, I erroneously remark that the result would be “irrational”. Technically this is not the case, however, even though in a strict mathematical sense the result IS “rational” it is nevertheless often not representable in the standard imperial scale. This would be true in the metric system as well. Therefore use of a division board is advisable.
Our Patreon:
/ neophyteboatwrights
Our facebook:
/ neophyteboatwrights
Special thanks to the following artists for graciously letting us used their music in this episode!
Madalitso Band - Nambewe