1. Prepare the permit and Safety documents
2. Approved and sufficient capacity of mobile/crawler crane is usr
3.Lifting area is fully barricaded and signboard placed
4.precast vehicle movement will be controlled by a banks man or flag man
5.Truck is placed near the crane
6.Lifting supervisor or rigger inspect load lifting gear lifting point proor to start
7.Tagline is attached to the elements for controlling movements
8.Precast element is moved to designated position
9. panel adjusted to correct position and secure with props
10. Alignment and verticality of panel
11.finall stability of props by supervisor or formam

Пікірлер
Lifting Installations and Fixing of Precast Panel Civil works|
2:13
Construction Technology
Рет қаралды 334
POV: Your kids ask to play the claw machine
00:20
Hungry FAM
Рет қаралды 16 МЛН
when you have plan B 😂
00:11
Andrey Grechka
Рет қаралды 62 МЛН
Art of Desert Construction For New Ultra Modern Project in UAE Part 1
3:00
Construction Technology
Рет қаралды 80
basic crane hand signal
1:53
How to operate crane and safety(francis adinda)
Рет қаралды 36 М.
INSANE MORDEN BUILDINGS YOU NEED TO SEE
2:52
Construction Technology
Рет қаралды 440
Precast Panel Erection - Eagle Farm Brisbane
20:20
Scott Buckby
Рет қаралды 15 М.
How to Cast Concrete in Substructure underground Plumbing work s
2:21
Construction Technology
Рет қаралды 190
160 Tons Type of cranes For Works Capacity
2:08
Construction Technology
Рет қаралды 1,6 М.