South Shore Gunite Installing exposed aggregate concrete around a swimming pool.
The process we use here is called a seeding process. You can also get the aggregate added to the truck at the plant but that limits the different colors you can use. We have 15 different blends and color styles. The seeding process also ensures that you dont miss a spot because there was a lack of stone in that area.
Contact SSG Pools: 800-649-8080 ssgpools.com/
pools Amherst New Hampshire
pools Andover
pools Billerica
pools Bedford New Hampshire
pools Concord
pools Hollis New Hampshire
pools Lynnfield
pools Newport
pools Weston
pools Lexington
pool builders Amherst New Hampshire
pool builders Andover
pool builders Billerica
pool builders Bedford New Hampshire
pool builders Concord
pool builders Hollis New Hampshire
pool builders Lynnfield
pool builders Newport
pool builders Weston
pool builders Lexington
pool contractors Amherst New Hampshire
pool contractors Andover
pool contractors Billerica
pool contractors Bedford New Hampshire
pool contractors Concord
pool contractors Hollis New Hampshire
pool contractors Lynnfield
pool contractors Newport
pool contractors Weston
custom pools Amherst New Hampshire
custom pools Andover
custom pools Billerica
custom pools Bedford New Hampshire
custom pools Concord
custom pools Hollis New Hampshire
custom pools Lynnfield
custom pools Newport
custom pools Weston
custom pool builders Amherst New Hampshire
custom pool builders Andover
custom pool builders Lexington
custom pool builders Billerica
custom pool builders Bedford New Hampshire
custom pool builders Concord
custom pool builders Hollis New Hampshire
custom pool builders Lynnfield
custom pool builders Newport
custom pool builders Weston
custom pool contractors Amherst New Hampshire
custom pool contractors Andover
custom pool contractors Billerica
custom pool contractors Bedford New Hampshire
custom pool contractors Concord
custom pool contractors Hollis New Hampshire
custom pool contractors Lynnfield
custom pool contractors Newport
custom pool contractors Weston
custom pool contractors Lexington
swimming pools Lexington MA
swimming pools Amherst New Hampshire
swimming pools Andover
swimming pools Billerica
swimming pools Bedford New Hampshire
swimming pools Concord
swimming pools Hollis New Hampshire
swimming pools Lynnfield
swimming pools Newport
swimming pools Weston
custom swimming pools Amherst New Hampshire
custom swimming pools Andover
custom swimming pools Billerica
custom swimming pools Bedford New Hampshire
custom swimming pools Concord
custom swimming pools Hollis New Hampshire
custom swimming pools Lynnfield
custom swimming pools Newport
custom swimming pools Weston
After we seed it, float it and trowel it we are able to then hose the majority of the cement off the surface to reveal most of the stone. We then go back the next day and do an acid wash to bring out the color.
Yes we have a lot of guys doing this work but this is a pool patio that will have lots of bare feet on it, its not a side walk. we need it to look good and be smooth. Power washing the next day creates a rougher surface that this.
We used a plastic control joint in the video as this is an acceptable practice, we offer saw cuts but they cost more and not everyone wants that.
We understand there are many different ways to do exposed aggregate concrete patios. This is the way that gives us excellent results on a daily basis. This crew will pour 3 or 4 600-2000 SF decks per week all summer with a few 10,000-18,000 SF decks per year.

Пікірлер: 90
@a2zhandi
@a2zhandi 12 жыл бұрын
nothing better than having a bunch of guys who all know what they're doing. They do good work together.
@gunforme
@gunforme 9 жыл бұрын
This looks like one hell of a team doing this job. Each is pulling his weight and making it look great.
@eddyvideostar
@eddyvideostar 6 жыл бұрын
To Gunforme: Each will need to be, since the proof can be pulled up from the privacy pooper photos and videos portraying progress
@Nilladaspilla
@Nilladaspilla 11 жыл бұрын
I have seen this done a different way for driveways. They use a high power sprayer to "wash" the cement binding from the aggregate. With a darker concrete this exposed aggregate wash was very nice for a driveway.
@morettiriffs327
@morettiriffs327 11 жыл бұрын
Fully agree. We use exactly the same system, Awsome results evry time.
@emutiny
@emutiny 11 жыл бұрын
nice work. seems like u have good men working. thank you for the upload brother.
@legalman2891
@legalman2891 5 жыл бұрын
Always the barrio doing the hardwork and the artwork
@fivelands1
@fivelands1 9 жыл бұрын
Very nice work, you are professional, I like to see some gravel over the ground, two inches,after you poor the concrete on top, and you may finish with one inch gravels white and black. Good work
@gyoung7571
@gyoung7571 6 жыл бұрын
Boys got it wired...Impressive
@SSGPools
@SSGPools 12 жыл бұрын
The stone goes on after the first float. we buy the stone specifically for exposed aggregate finishes from suppliers for this product. they come in 80-100 pound bags.
@leonelorozco3177
@leonelorozco3177 6 жыл бұрын
Good job guys keep working hard dios los bendiga
@ButterBaby2u
@ButterBaby2u 2 жыл бұрын
The work looks like it performed by some talented hispanic guy !
@nathangregory3827
@nathangregory3827 8 жыл бұрын
Great job, why would anyone dislike this video?
@markgriffin8536
@markgriffin8536 3 жыл бұрын
Yeah!....I was thinking the same thing....jealous arm-chair trolls I guess...they did a great job.
@kootenayskye
@kootenayskye 12 жыл бұрын
I really enjoyed your video, thank you for sharing this information.
@JamesBrown-ey4mt
@JamesBrown-ey4mt 5 жыл бұрын
Amazing!
@SSGPools
@SSGPools 11 жыл бұрын
A high pressure washer works great for sidewalks and driveways, however on a surface where people regularly wear bare feet the surface must be as perfect as possible. We hose and sponge the concrete off at the end of the placement process followed by an acid wash the following day.
@SSGPools
@SSGPools 12 жыл бұрын
Stone goes in after the first float, it is special stone manufatured for exposed aggregate applications.
@jjooeegg1
@jjooeegg1 11 жыл бұрын
Poetry in motion
@fivelands1
@fivelands1 10 жыл бұрын
That is the way to make terrazzo !
@SSGPools
@SSGPools 11 жыл бұрын
After cleaning the surface at the end of the day an acid wash does clean the surfaces of the stones and leaves a high quality final product.
@SSGPools
@SSGPools 12 жыл бұрын
There are 2 ways of doing exposed aggregate, the stone can be added to the concrete mix or it can be broadcast over like you see here. you cannot just find the aggregate in existing concrete and create a nice finish. We use the cast method because we buy very nice specific stone for this application, we have many different blends and colors so we do not want to be buying extra stone to put in the mix. the broadcast method also make a much more uniform finish than if the stone is in the mix.
@lemonadeintheheat8433
@lemonadeintheheat8433 6 жыл бұрын
Thats a lot of work going on one time...and it all looks great
@JudyJudge100
@JudyJudge100 6 жыл бұрын
wow, this is an example of good teamwork! And lovely look too. Thank you.
@margnz1436
@margnz1436 7 жыл бұрын
Nice Mexican work!
@Selisfam
@Selisfam 10 жыл бұрын
where are Scott Sean and Bryan? I only saw Jorge, Juan, Jose, and Pedro in the whole video
@jimlahey988
@jimlahey988 6 жыл бұрын
Selisfam No ... just shut up
@panchovilla4005
@panchovilla4005 Жыл бұрын
They were sitting down texting 🤣 or on smoke break
@SSGPools
@SSGPools 12 жыл бұрын
We offer saw cut joints at an extra cost. Saw cutting is much more costly than adding a plastic expansion joint and we need to be competitive and offer all options.
@SSGPools
@SSGPools 12 жыл бұрын
Having to put the stone in the mix severly limits the color options available to the end user. We offer at least 10 different stone style/ color options. the stone is brought in from different parts of the country and would be far too costly to the end user if we had to fill the truck with enough stone that we have enough on the surface to provide a good final product. I do not disagree with your method, we prefer ours because of the options it allows and the perfect product we produce.
@ArturoLopez-pt4dv
@ArturoLopez-pt4dv 5 жыл бұрын
Donde están mis botas. . . . Ja ja ja where are my boots. . . .
@tbone66613
@tbone66613 12 жыл бұрын
we dont put the stone in the mix, the concrete company we order from takes care of everything , kind of like if you wanted to have fiber mesh, they just add it we jus pour, spray , and power wash
@dillonmoreland2357
@dillonmoreland2357 3 жыл бұрын
U could use 3 r 4 less guys when u put the stone in the mix
@nebbarnes3404
@nebbarnes3404 6 жыл бұрын
I am new to all this, never have actually done anything with cement. I am in the beginning stages of digging out a 12x12 area for a patio. We live in KY where it gets very hot and humid. Its been in the 90's already with high humidity. Started 3 days ago but have only been able to work on the area one day because of the rain and high temps. Looking to do this to my patio but I was wondering do you have to fill the entire surface with the rocks or can I use a few? What say you? Also do I have to use some kind of re barb or mesh or can it just be cement on top of the gravel?
@SSGPools
@SSGPools 11 жыл бұрын
We do not use retarder as we get to it quick enough.
@jsmith5523
@jsmith5523 12 жыл бұрын
Thank you for this video, do you have anything on the process of exposing the aggregate? Would the process differ with a glass product?
@SSGPools
@SSGPools 13 жыл бұрын
This is not a step by step process of how to do this job. this is just an example to show most of what goes into pouring an exposed aggregate concrete deck.
@EdStaniszewski
@EdStaniszewski 4 жыл бұрын
after leveling out, do you power wash? when do you wash?
@user-xu8ug9wp8b
@user-xu8ug9wp8b 10 жыл бұрын
Can i get the information for the exposed aggregate finish by working installation or working munual? Can you introduce the stone aggregates supplier from U.S.A?
@tigersrule4eva1
@tigersrule4eva1 12 жыл бұрын
why do you make the expansion joint why don't you finish and go over it with a concrete saw
@VgniK88
@VgniK88 4 жыл бұрын
Y not put the bags in the concrete mixr (truck) before pouring it? Then finish it after screed n float then spray with sugar then wash off next day. Much less wrk
@davesmith2150
@davesmith2150 3 жыл бұрын
probably costs more in rock I'm sure they did the coke and spray
@fivelands1
@fivelands1 10 жыл бұрын
The workers need special boots ,when they work over the liquid concrete!!
@den1979100
@den1979100 13 жыл бұрын
what kind of stone do you put in? and whens a good time t place the stone and float it in? cant tell how green the mud is in vidio.
@Saywhatohno
@Saywhatohno 3 ай бұрын
What is the aggregate on top? Where do I get it from.
@simonfredrick3029
@simonfredrick3029 6 жыл бұрын
The guys working in leather work boots ankle deep in concrete are lucky they haven't ended up having their feet amputated!
@eddyvideostar
@eddyvideostar 6 жыл бұрын
Simon: Why is this? It takes time for the cement to cure.
@SSGPools
@SSGPools 5 жыл бұрын
These guys know what they are doing, they have rubber boots if they want them and they are probably not in the concrete as much as some of the other guys on a regular basis. To answer eddy, you can get a chemical burn from cement by not wearing the correct protective gear and it can happen quickly if the right circumstances happen together.
@mikeyboy7515
@mikeyboy7515 5 жыл бұрын
Only idiots would stand in concrete with no rubber boots. Good way to get concrete poisoning
@marcox416
@marcox416 4 жыл бұрын
Viva la raza!
@tigersrule4eva1
@tigersrule4eva1 12 жыл бұрын
fair enough
@engineersadda7486
@engineersadda7486 5 жыл бұрын
What's the benefit of this type of concrete
@ryanwatson4721
@ryanwatson4721 6 жыл бұрын
muy salvaje! Mucho Heramosa
@Tom-yb6sl
@Tom-yb6sl 3 жыл бұрын
Why not order concrete with small stone in it to begin with and not have 3 guys pushing a Darby for 100 passes?
@atlacatlau2140
@atlacatlau2140 11 жыл бұрын
Hi SSG pools, I need some advise from you, I would like to do a small area next to my shed,so I can put my 6 x 4 trailer. My question is: Is the concrete made of 3 gravel, 2 sand, 1 cement? and then on top of that when everything is smoothed throw the aggregate and level it? How deep should I make the excavation? 10- 15 cm deep? that includes for the top aggregate?. Thanks.
@SSGPools
@SSGPools 11 жыл бұрын
Do you supply the concrete company with the stone aggregate or do they just use a standard peastone? We have 12-15 different color blends of stone from different parts of the country and the world so that the customer has a lot of different color options. When the concrete company adds the stone this typically limits the color options and the chance of having gaps between stones is greater.
@OOpSjm
@OOpSjm 8 жыл бұрын
Also, your not loading the concrete mix with excess stone. Casting puts the stone where you want it.
@SSGPools
@SSGPools 11 жыл бұрын
The aggregate is exposed by cleaning the surfaces of the stone at the end of the day followed by an acid wash the next day. This process could be used on a glass product also.
@EngineerPEretired
@EngineerPEretired 7 жыл бұрын
This is "surface in bedding "; not "exposed aggregate "...
@SSGPools
@SSGPools 7 жыл бұрын
If that is what you want to call it that is fine. If anyone does a google image search for surface in bedding and another for exposed aggregate you will find that we are correct in calling this exposed aggregate.
@pyramidbrickandstone2198
@pyramidbrickandstone2198 6 жыл бұрын
This is the original method. Same result, the guys who are really good at exposed remember how to do it this way.
@024dogtop
@024dogtop 6 жыл бұрын
It is exposed aggregate. Ive seen this technique called "seeding". You can get better results with better stone than mix from concrete supply.
@jonathanbeam6898
@jonathanbeam6898 8 жыл бұрын
Did you use any fiber mesh for the exposed aggregate mix?
@SSGPools
@SSGPools 7 жыл бұрын
No just the 6x6 WWF mesh reinforcement.
@samrichards8251
@samrichards8251 7 жыл бұрын
can i suggest increasing your team size from 28 to 29 people
@SSGPools
@SSGPools 7 жыл бұрын
We price our work and choose our crew sizes to get jobs done flawlessly and efficiently. We have some of the larger crews in our trades because we have found that larger crews on certain jobs equal better products. Its far less expensive to have an extra couple guys on pour day than to send a whole crew back to rip out and re-pour a deck. Its all about quality.
@MooberryFarmFamily
@MooberryFarmFamily 6 жыл бұрын
SSG Pools good point. One guy standing around is better than a Skelton crew fighting blown up concrete and having to make the “its good enough” call so you don’t lose the whole slab
@rudystucco6751
@rudystucco6751 8 жыл бұрын
que le echan para que endure rapido
@octavioaguilar613
@octavioaguilar613 7 жыл бұрын
Rudy Osorio se llama calcio Pero en verano no se necesita no mas es para invierno o para cuando el tiempo esta frio
@nonyabuisness
@nonyabuisness 8 жыл бұрын
Why don't you just order a white pea gravel mix with 10% over rock?
@SSGPools
@SSGPools 7 жыл бұрын
Because ordering it in the mix doesnt come out this good. We also offer many different color combinations in the stone which ready mix plants would not. Ordering a white pea gravel mix is not real life.
@SSGPools
@SSGPools 7 жыл бұрын
It is unnecessary with our method.
@eddyvideostar
@eddyvideostar 6 жыл бұрын
Carlzday: You sound as if you know your stuff or is this just bluff? These wonderful men in the video believe -- and show that they know what they are doing.
@hickey90291
@hickey90291 11 жыл бұрын
tbone knows what hes talking about....i dont know what you guys are doing....id we tried to do this down where i am we deff wouldnt be gettin paid for something like that lol
@MrDathai01
@MrDathai01 6 ай бұрын
Someone get green t shirt guy some proper boots 🙈
@jimmygomez7263
@jimmygomez7263 6 жыл бұрын
Where’s the Expose aggregate?lol
@pepino735
@pepino735 7 жыл бұрын
was that a six sack ,five inch slump? the mexican maffia...
@tylerbuchkowski9143
@tylerbuchkowski9143 7 жыл бұрын
Worst way to do expose aggregate
@SSGPools
@SSGPools 5 жыл бұрын
Do you mean a more difficult way to do exposed aggregate? We do it this way because it comes out the best, can offer more colors, blends and even glass beads in the mix.
@dickfacey1282
@dickfacey1282 11 жыл бұрын
not to much labor why make people kill themselves if you can afford have the guys you need to do the big work . I would rather have a guy standing around then lose the concrete or have a shitty job,
@leoortkras1102
@leoortkras1102 5 жыл бұрын
This is a joke you don't do exposed aggregate like that at least not in Michigan we don't the stone is already in the concrete mix you pour the concrete out you finish the top off you let it set up and then you wash the top off simple as that. You can all also use a product called top stop after you finish the concrete you spray the top stop off so the top surface never gets hard cover it with visqueen you could come back 24 hours later and spray the top off comes up beautiful.
@SSGPools
@SSGPools 5 жыл бұрын
Hey Leo, you can do that here to. you can do that anywhere you want if you order the right mix. What you cant do is create custom color and stone blends from the readymix truck. You cant set yourself apart from all the other aggregate companies, you cant offer your high end customers something special, unique or even custom. We are different which is why our customers like us and pay us more to do so.
@leoortkras1102
@leoortkras1102 5 жыл бұрын
@@SSGPools 9 to $10 a square foot for pea gravel mix want to get fancy we can put any kind of aggregate on the top also a glowstone which glows in the dark 14 $15 a square foot.
@jasonjohinke5651
@jasonjohinke5651 5 жыл бұрын
No plastic no chairs.... thats not how you screed, they dont even have gum boots on... no lace bars... this is a disgrace
@leonelmontiel3944
@leonelmontiel3944 9 жыл бұрын
''
@smackflack5771
@smackflack5771 4 жыл бұрын
Such a bad look for the company when ur worker is ankle deep in mud with regular boots on. Amateur hour!!
DIY Exposed Aggregate Concrete Patio
12:23
The Dusty Builder
Рет қаралды 72 М.
We Don't Do This A Lot
27:45
Concrete with the Hauses
Рет қаралды 258 М.
Glow Stick Secret Pt.4 😱 #shorts
00:35
Mr DegrEE
Рет қаралды 19 МЛН
Magic or …? 😱 reveal video on profile 🫢
00:14
Andrey Grechka
Рет қаралды 62 МЛН
나랑 아빠가 아이스크림 먹을 때
00:15
진영민yeongmin
Рет қаралды 15 МЛН
ДОКАЗАЛ ЧТО НЕ КАБЛУК #shorts
00:30
Паша Осадчий
Рет қаралды 933 М.
DIY Concrete Paver with Exposed Aggregate finish
10:38
Jesse does DIY
Рет қаралды 54 М.
The Perfect First Exposed Aggregate Concrete Project!
12:56
The Dusty Builder
Рет қаралды 55 М.
Pouring EXPOSED AGG Round steps (Secret Dr Pepper method)
7:11
GRUBB MUDD
Рет қаралды 76 М.
🇦🇺 AUSTRALIAN EXPOSED AGGREGATE- POURING🇦🇺
10:56
EARTHCON GROUP
Рет қаралды 5 М.
Expose GLASS Aggregate!
5:14
Deco-Crete TV
Рет қаралды 43 М.
Shotcrete timelapse of a pool shell construction.
5:03
DC Shotcrete
Рет қаралды 23 М.
A-MAZ-ING!! Exposed Aggregate All Over!
24:11
Concrete with the Hauses
Рет қаралды 139 М.
How to get a Exposed Aggregate Finish on Concrete
6:23
Odell Complete Concrete
Рет қаралды 1,7 МЛН
WE MADE IT GLOW AT NIGHT
14:38
The Art of Concrete
Рет қаралды 17 М.
Glow Stick Secret Pt.4 😱 #shorts
00:35
Mr DegrEE
Рет қаралды 19 МЛН