Рет қаралды 1,898
The tugboat Beverly M I delivered our final Cherubini bridge for the Port Lands project!
EllisDon crews worked hard to strip the bracing before repositioning the bridge and lowering it onto the abutment. You'll soon be able to cross the Keating Channel on foot, by bike, or in a vehicle.
With this structure in place, EllisDon and Waterfront Toronto have taken another important step toward reconnecting Torontonians with a revitalized waterfront.
#PortLands #WaterfrontToronto #Cherubini #Toronto #construction #EllisDonCivil #bridge #bridgework #KeatingChannel #bridgestructure