Finishing the water line and grading around the plumbing. Got the last of the 2" CTS line installed and hooked up finally. I briefly go over how the pipe hooks together then get everything backfilled. The next morning I scratched in the lines for the plumber in the slab. Once he was done I backfilled the around the pipes to get the slab ready for the concrete guys again. Thanks for watching! #ElkiteEarthworks #Takeuchi #Grading