Renovation of runway 10/28

  Рет қаралды 9,928

Flughafen Zürich

Flughafen Zürich

Күн бұрын

As concessionaire, Flughafen Zürich AG is obliged to ensure orderly and safe operations, provide the necessary infrastructure for this purpose and carry out appropriate maintenance work. The work to repave the centerline of runway 10/28 will be split into around 70 to 80 night shifts. The original concrete runway will be replaced by pavement consisting of three layers of asphalt, which will be delivered during the preceding day. A special low-temperature, rapid-curing asphalt will be used so the runway is ready for use again as soon as flights resume in the morning.

Пікірлер
The Unbelievable Logistics of Fixing an Airport Runway
11:27
The B1M
Рет қаралды 731 М.
Sanierung Piste 10/28 Flughafen Zürich
8:13
Flughafen Zürich
Рет қаралды 20 М.
Apple peeling hack @scottsreality
00:37
_vector_
Рет қаралды 126 МЛН
这三姐弟太会藏了!#小丑#天使#路飞#家庭#搞笑
00:24
家庭搞笑日记
Рет қаралды 124 МЛН
escape in roblox in real life
00:13
Kan Andrey
Рет қаралды 71 МЛН
Sanierung Piste 10/28 am Flughafen Zürich
8:41
Flughafen Zürich
Рет қаралды 3,9 М.
All about runway markings [atc for you]
8:36
ATC FOR YOU
Рет қаралды 783 М.
Designing the Perfect Airport Runway
15:27
Real Engineering
Рет қаралды 3,2 МЛН
Replacing Airport Concrete OVERNIGHT
7:29
Aaron Witt
Рет қаралды 159 М.
Runway Rubber Removal Maintenance
6:29
AIRBOYD
Рет қаралды 170 М.
What Are The Differences Between Concrete And Asphalt Runways?
4:43
Airport signs, explained
6:35
Everything Aviation
Рет қаралды 241 М.
Why 10,000 Pounds of Rubber are Stripped From Runways | Cars Insider
4:54
Apple peeling hack @scottsreality
00:37
_vector_
Рет қаралды 126 МЛН