Рет қаралды 5,414
Joel and Phil dive in to liquidated damages and how the industry can avoid big payouts. GE Vernova is dealing with another offshore blade failure in the UK, and our thoughts on the latest renewable energy Instagram craze. And, a discussion on a very full eagle! If you have encountered metal staples in a GE 2.X-116 or 127 blades, reach out to Joel at joel.saxum@wglightning.com.
There's still time to register for AMI Event's Wind Turbine Blade Conference in October 2-3rd! www.ami-events...
Need low-cost lightning strike sensors for your turbine? Email Joel at Joel.saxum@wglightning.com.
THANKS FOR WATCHING THE UPTIME WIND ENERGY PODCAST
Apple Podcast: podcasts.apple...
Spotify: open.spotify.c...
Overcast: overcast.fm/it...
CONTACT US TODAY
--
✅ Sign Up for Uptime Tech News (our email podcast updates): weatherguardwi...
🚨 Follow Rosemary's KZbin Channel: / engineeringwithrosie
⚡⚡CONNECT WITH WEATHER GUARD LIGHTNING TECH
👉If you need retrofit lightning protection for wind turbine blades, call or email us:
WEBSITE: weatherguardwi...
LINKEDIN: / wglightning
TWITTER: / wglightning
SUBSCRIBE ON KZbin: bit.ly/weatherg...