East West Metro Tunnel is an under construction underwater river tunnel of Kolkata Metro in Kolkata, West Bengal. The river tunnel is construct underneath Hooghly river. Tunnel length is 11 kilometres (6.8 mi) and width is 5.5 metres (18 ft). A 520m stretch of the tracks will go through a tunnel under the Hooghly. The roof of the tunnel would be about 30 metres from the ground level. The tunnel will be completed in 2018.The tunnel will be first underwater river tunnel in India and South Asia . The tunnel used by East West Metro Line for metro rail service and constructed by Kolkata Metro Rail Corporation.
The section between Sealdah and Mahakaran station was realigned due to inability of GoWB to provide land on the surface along the original route. Even on the new alignment a station planned at Wellington had to be dropped as GoWB was unable to provide the required land on the surface. Work at Howrah Maidan have started in March 2016. The section between Howrah Maidan and Esplanade station has been built by Afcons - Transtonnelstroy JV team, two tunnel boring machines from Herrenknecht are being used to dig the tunnel. This section passes through the river Hooghly for a distance of 520 meters. The section under the river is at a depth of 30 meters (roof to ground distance) whereas the average roof to ground distance is 17 meters. The Howrah station on the west side of the river will be at a depth of 30 meters. Tunnelling started from Howrah Maidan side. On 23rd May one of the TBM named Rachna completed the tunneling under the Hoogly river in 36 days. The other TBM named Prerna also completed the tunnelling work under the river on 21-June-2017. There were some concerns during tunnelling under Brabourne road as the tunnel would pass within 100 meters of heritage structures and there were also many old and dilapidated buildings in this section. KMRC received permission from Archaeological Survey of India in June 2017. Residents and shops in the old building were temporarily shifted and the buildings were reinforced before construction of tunnel. Construction of tunnel till Mahakaran station was completed in November 2017. For the Mahakaran-Esplanade section tunnelling of one of the tunnel have been completed on 23 March 2018 the other tunnel have also been completed by April. In this sections also shops and residents of the buildings have been shifted in phased manner before tunnelling. The Esplanade - Sealdah section will be executed by ITD-ITD Cementation JV and was scheduled to start in May 2018.
▪️The pictures and video fotages shown in this video is not mine.I just used this clips for information purposes.▪️
⚫️COPYRIGHT DISCLAIMER⚫️
Under section 107 of the copyright act 1976,allowance is made for FAIR USE for purposes such as criticism,comment,news reporting,teaching scholarship & research.
Fair Use is a permitted by copyright dariye that might otherwise be infriging,non- profit,education or personal use tips the balance in favor of fair use.
PLEASE SUBSCRIBE and SUPPORT MY CHANNEL:
Here my channel link:
/ @ochena_chokhe
This channel is for that places which has some history and mystery where you can go easily.
So take a brief description and make your journey more attractive.
Also you can get information about history,geography,upcoming interesting news,biography,any festivals,and many more...So stay tuned with OCHENA CHOKHE.
Thank You.
#tunnelboringmachine #kolkataeastwestmetrotunne #kolkatagangaunderwatertunnel